2019 Run Plans and Run Sheets » History » Version 35
Garth Huber, 07/30/2019 03:43 PM
1 | 1 | Garth Huber | h1. Run Plans and Run Sheets |
---|---|---|---|
2 | |||
3 | h2. Summer 2019 Run Period |
||
4 | |||
5 | 19 | Garth Huber | * Blank Run Sheets |
6 | 9 | Garth Huber | ** New Configuration Sheet attachment:runsheet_pion.tgif.pdf |
7 | ** Continuing Configuration Sheet attachment:runsheet2_pion.tgif.pdf |
||
8 | |||
9 | 10 | Garth Huber | * Run Plans |
10 | ** Run Plan Spread Sheet attachment:pion_lowEkin_runplan.ods |
||
11 | ** Run Plan attachment:runplan_lowQ2.pdf |
||
12 | ** SIMC Plots (low Q2 Fpi) attachment:tphi_lowQ2.pdf |
||
13 | 35 | Garth Huber | ** Scanned run plan (with shift worker and RC notes) attachment:run_plan.pdf |
14 | 1 | Garth Huber | |
15 | 10 | Garth Huber | * Run List |
16 | 34 | Mireille Muhoza | ** Runlist CSV file attachment:pion_runlist_summer19.csv |
17 | 32 | Mireille Muhoza | ** Standard kinematics attachment:standard.kinematics |
18 | 19 | Garth Huber | |
19 | * Run Sheets |
||
20 | 20 | Garth Huber | ** 2.7 GeV Optics, Trigger, BCM (while waiting for ESR repair) attachment:optics_2p7gev.pdf |
21 | 19 | Garth Huber | ** 2.7 GeV Run Sheets attachment:runsheets_2p7gev.pdf |
22 | 29 | Vijay Kumar | ** 3.6 GeV Run Sheets attachment:runsheets_3p6gev.pdf |
23 | 35 | Garth Huber | ** 4.5 GeV Run Sheets attachment:runsheets_4p5gev.pdf |
24 | 29 | Vijay Kumar | |
25 | 21 | Garth Huber | h2. Later high energy running |
26 | |||
27 | * Beam pipe requirements attachment:beampipe_req.pdf |