h1. Summer 2019 Run Plans and Run Sheets
2 1 Garth Huber
3 19 Garth Huber
* Blank Run Sheets
4 9 Garth Huber
** New Configuration Sheet attachment:runsheet_pion.tgif.pdf
5
** Continuing Configuration Sheet attachment:runsheet2_pion.tgif.pdf
6
7 10 Garth Huber
* Run Plans
8
** Run Plan Spread Sheet attachment:pion_lowEkin_runplan.ods
9
** Run Plan attachment:runplan_lowQ2.pdf 
10
** SIMC Plots (low Q2 Fpi) attachment:tphi_lowQ2.pdf 
11 35 Garth Huber
** Scanned run plan (with shift worker and RC notes) attachment:run_plan.pdf
12 1 Garth Huber
13 10 Garth Huber
* Run List
14 34 Mireille Muhoza
** Runlist CSV file attachment:pion_runlist_summer19.csv
15 32 Mireille Muhoza
** Standard kinematics attachment:standard.kinematics
16 19 Garth Huber
17
* Run Sheets
18 20 Garth Huber
** 2.7 GeV Optics, Trigger, BCM (while waiting for ESR repair) attachment:optics_2p7gev.pdf
19 19 Garth Huber
** 2.7 GeV Run Sheets attachment:runsheets_2p7gev.pdf
20 29 Vijay Kumar
** 3.6 GeV Run Sheets attachment:runsheets_3p6gev.pdf
21 35 Garth Huber
** 4.5 GeV Run Sheets attachment:runsheets_4p5gev.pdf 
22 29 Vijay Kumar
23 21 Garth Huber
h2. Later high energy running
24
25
* Beam pipe requirements attachment:beampipe_req.pdf