Project

General

Profile

2019 Run Plans and Run Sheets » History » Revision 9

Revision 8 (Garth Huber, 06/10/2019 03:49 PM) → Revision 9/37 (Garth Huber, 06/12/2019 02:46 PM)

h1. Run Plans and Run Sheets 

 h2. Summer 2019 Run Period 

 * Run Sheets 
 ** New Configuration Sheet attachment:runsheet_pion.tgif.pdf 
 ** Continuing Configuration Sheet attachment:runsheet2_pion.tgif.pdf 

 * Run Plan Spread Sheet attachment:pion_lowEkin_runplan.ods 
 * Run Plan attachment:runplan_lowQ2.pdf  
 * SIMC Plots (low Q2 Fpi) attachment:tphi_lowQ2.pdf  

  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_xx_scan.pdf 
 * Run list 
 * Pion LT Charge and Time Spreadsheet attachment:PionLowE_PhysicsSettings.ods 

 * Scanned run plan (with shift worker and RC notes) attachment:runplan_xx_scan.pdf