2021 Run Plans and Run Sheets » History » Version 17
Garth Huber, 09/20/2021 06:25 PM
| 1 | 2 | Garth Huber | h1. Fall 2021 Run Plans and Run Sheets |
|---|---|---|---|
| 2 | |||
| 3 | * Blank Run Sheets |
||
| 4 | 14 | Garth Huber | ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps |
| 5 | ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps |
||
| 6 | 2 | Garth Huber | |
| 7 | 15 | Garth Huber | * Run Plan Spread Sheet attachment:pion_loweps_runplan_21sep10.ods |
| 8 | 2 | Garth Huber | |
| 9 | * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf |
||
| 10 | * Beam pipe requirements attachment:beampipe_req.pdf |
||
| 11 | 3 | Garth Huber | * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf |
| 12 | 2 | Garth Huber | |
| 13 | h2. 9.2 GeV Beam |
||
| 14 | |||
| 15 | * Run Plan attachment:runplan_9p2gev.pdf |
||
| 16 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf |
||
| 17 | 17 | Garth Huber | * 9.2 GeV Run list attachment:runlist_pionLT_2021_9p2.csv |
| 18 | 2 | Garth Huber | |
| 19 | h3. 9.2 GeV Run sheets |
||
| 20 | |||
| 21 | 16 | Garth Huber | ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf |
| 22 | ** Physics Q2=1.60, W=3.08 attachment:physics_9p2gev_q21p60_w3p08.pdf |
||
| 23 | ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf |
||
| 24 | ** Physics Q2=1.60, W=3.08 attachment:physics_9p2gev_q26p00_w3p19.pdf |
||
| 25 | ** Physics Q2=1.60, W=3.08 attachment:physics_9p2gev_q28p50_w2p79.pdf |
||
| 26 | 2 | Garth Huber | |
| 27 | 10 | Garth Huber | h2. 8.0 GeV Beam (to be posted in October) |
| 28 | 2 | Garth Huber | |
| 29 | * Run Plan attachment:runplan_8p0gev.pdf |
||
| 30 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf |
||
| 31 | * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv |
||
| 32 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods |
||
| 33 | |||
| 34 | h3. 8.0 GeV Run sheets |
||
| 35 | |||
| 36 | ** Heep attachment:heep_8p0.pdf |
||
| 37 | ** Luminosity scan attachment:lumi_8p0.pdf |
||
| 38 | ** Physics runs attachment:physics_8p0_loweps.pdf |
||
| 39 | |||
| 40 | 10 | Garth Huber | h2. 9.9 GeV Beam (to be posted in October) |
| 41 | 2 | Garth Huber | |
| 42 | * Run Plan attachment:runplan_9p9gev.pdf |
||
| 43 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf |
||
| 44 | * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv |
||
| 45 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods |
||
| 46 | |||
| 47 | h3. 9.9 GeV Run sheets |
||
| 48 | |||
| 49 | ** Heep attachment:heep_9p9.pdf |
||
| 50 | ** Luminosity scan attachment:lumi_9p9.pdf |
||
| 51 | ** Physics runs attachment:physics_9p9_loweps.pdf |
||
| 52 | |||
| 53 | 10 | Garth Huber | h2. 6.0 GeV Beam (to be posted in October) |
| 54 | 2 | Garth Huber | |
| 55 | * Run Plan attachment:runplan_6p0gev.pdf |
||
| 56 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf |
||
| 57 | * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv |
||
| 58 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods |
||
| 59 | |||
| 60 | h3. 6.0 GeV Run sheets |
||
| 61 | |||
| 62 | ** Heep attachment:heep_6p0.pdf |
||
| 63 | ** Physics runs attachment:physics_6p0_loweps.pdf |