Project

General

Profile

Actions

2021 Run Plans and Run Sheets » History » Revision 17

« Previous | Revision 17/53 (diff) | Next »
Garth Huber, 09/20/2021 06:25 PM


Fall 2021 Run Plans and Run Sheets

  • Run Plan Spread Sheet attachment:pion_loweps_runplan_21sep10.ods

9.2 GeV Beam

9.2 GeV Run sheets

  • Calibrations #1 (Heep-Coin, Sieve1) runsheets_9p2gev_calib1.pdf
  • Physics Q2=1.60, W=3.08 attachment:physics_9p2gev_q21p60_w3p08.pdf
  • Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) runsheets_9p2gev_calib2.pdf
  • Physics Q2=1.60, W=3.08 attachment:physics_9p2gev_q26p00_w3p19.pdf
  • Physics Q2=1.60, W=3.08 attachment:physics_9p2gev_q28p50_w2p79.pdf

8.0 GeV Beam (to be posted in October)

  • Run Plan attachment:runplan_8p0gev.pdf
  • Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf
  • 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv
  • Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods

8.0 GeV Run sheets

  • Heep attachment:heep_8p0.pdf
  • Luminosity scan attachment:lumi_8p0.pdf
  • Physics runs attachment:physics_8p0_loweps.pdf

9.9 GeV Beam (to be posted in October)

  • Run Plan runplan_9p9gev.pdf
  • Scanned run plan (with shift worker and RC notes) runplan_9p9gev_scan.pdf
  • 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv
  • Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods

9.9 GeV Run sheets

  • Heep attachment:heep_9p9.pdf
  • Luminosity scan attachment:lumi_9p9.pdf
  • Physics runs attachment:physics_9p9_loweps.pdf

6.0 GeV Beam (to be posted in October)

  • Run Plan runplan_6p0gev.pdf
  • Scanned run plan (with shift worker and RC notes) runplan_6p0gev_scan.pdf
  • 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv
  • Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods

6.0 GeV Run sheets

  • Heep attachment:heep_6p0.pdf
  • Physics runs attachment:physics_6p0_loweps.pdf

Updated by Garth Huber over 3 years ago · 17 revisions