2021 Run Plans and Run Sheets » History » Version 20
Garth Huber, 09/26/2021 07:09 PM
1 | 2 | Garth Huber | h1. Fall 2021 Run Plans and Run Sheets |
---|---|---|---|
2 | |||
3 | * Blank Run Sheets |
||
4 | 14 | Garth Huber | ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps |
5 | ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps |
||
6 | 2 | Garth Huber | |
7 | 20 | Garth Huber | * Run Plan Spread Sheet attachment:pion_loweps_runplan_21sep26.ods |
8 | 2 | Garth Huber | |
9 | * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf |
||
10 | * Beam pipe requirements attachment:beampipe_req.pdf |
||
11 | 3 | Garth Huber | * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf |
12 | 2 | Garth Huber | |
13 | h2. 9.2 GeV Beam |
||
14 | |||
15 | * Run Plan attachment:runplan_9p2gev.pdf |
||
16 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf |
||
17 | 17 | Garth Huber | * 9.2 GeV Run list attachment:runlist_pionLT_2021_9p2.csv |
18 | 2 | Garth Huber | |
19 | h3. 9.2 GeV Run sheets |
||
20 | |||
21 | 16 | Garth Huber | ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf |
22 | 18 | Garth Huber | ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf |
23 | 16 | Garth Huber | ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf |
24 | 19 | Garth Huber | ** Physics Q2=6.00, W=3.19 attachment:runsheets_9p2gev_q26p00_w3p19.pdf |
25 | 1 | Garth Huber | ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf |
26 | 20 | Garth Huber | |
27 | h2. Special 5.56 GeV Run Plan (in case 5-pass delivery can't continue) |
||
28 | |||
29 | * Run Plan attachment:runplan_5p56.pdf |
||
30 | 2 | Garth Huber | |
31 | 10 | Garth Huber | h2. 8.0 GeV Beam (to be posted in October) |
32 | 2 | Garth Huber | |
33 | * Run Plan attachment:runplan_8p0gev.pdf |
||
34 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf |
||
35 | * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv |
||
36 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods |
||
37 | |||
38 | h3. 8.0 GeV Run sheets |
||
39 | |||
40 | ** Heep attachment:heep_8p0.pdf |
||
41 | ** Luminosity scan attachment:lumi_8p0.pdf |
||
42 | ** Physics runs attachment:physics_8p0_loweps.pdf |
||
43 | |||
44 | 10 | Garth Huber | h2. 9.9 GeV Beam (to be posted in October) |
45 | 2 | Garth Huber | |
46 | * Run Plan attachment:runplan_9p9gev.pdf |
||
47 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf |
||
48 | * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv |
||
49 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods |
||
50 | |||
51 | h3. 9.9 GeV Run sheets |
||
52 | |||
53 | ** Heep attachment:heep_9p9.pdf |
||
54 | ** Luminosity scan attachment:lumi_9p9.pdf |
||
55 | ** Physics runs attachment:physics_9p9_loweps.pdf |
||
56 | |||
57 | 10 | Garth Huber | h2. 6.0 GeV Beam (to be posted in October) |
58 | 2 | Garth Huber | |
59 | * Run Plan attachment:runplan_6p0gev.pdf |
||
60 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf |
||
61 | * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv |
||
62 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods |
||
63 | |||
64 | h3. 6.0 GeV Run sheets |
||
65 | |||