2021 Run Plans and Run Sheets » History » Version 24

Garth Huber, 10/11/2021 09:52 PM

1 2 Garth Huber
h1. Fall 2021 Run Plans and Run Sheets
2
3
* Blank Run Sheets
4 14 Garth Huber
** New Configuration Sheet attachment:runsheet_pion21.tgif.ps
5
** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps
6 2 Garth Huber
7 20 Garth Huber
* Run Plan Spread Sheet attachment:pion_loweps_runplan_21sep26.ods
8 2 Garth Huber
9 24 Garth Huber
* JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf  attachment:20211004_JLab_ExpSch.pdf
10 2 Garth Huber
* Beam pipe requirements attachment:beampipe_req.pdf
11 3 Garth Huber
* SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf
12 2 Garth Huber
13
h2. 9.2 GeV Beam
14
15
* Run Plan attachment:runplan_9p2gev.pdf 
16
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf
17 17 Garth Huber
* 9.2 GeV Run list attachment:runlist_pionLT_2021_9p2.csv
18 2 Garth Huber
19
h3. 9.2 GeV Run sheets
20
21 16 Garth Huber
** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf
22 18 Garth Huber
** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf
23 16 Garth Huber
** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf
24 22 Garth Huber
** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf
25 23 Garth Huber
** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf
26 1 Garth Huber
** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf
27 20 Garth Huber
28
h2. Special 5.56 GeV Run Plan (in case 5-pass delivery can't continue)
29
30 21 Garth Huber
* Run Plan attachment:runplan_5p56gev.pdf
31 2 Garth Huber
32 10 Garth Huber
h2. 8.0 GeV Beam (to be posted in October)
33 2 Garth Huber
34
* Run Plan attachment:runplan_8p0gev.pdf 
35
* Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf
36
* 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv
37
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods
38
39
h3. 8.0 GeV Run sheets
40
41
** Heep attachment:heep_8p0.pdf
42
** Luminosity scan attachment:lumi_8p0.pdf
43
** Physics runs attachment:physics_8p0_loweps.pdf
44
45 10 Garth Huber
h2. 9.9 GeV Beam (to be posted in October)
46 2 Garth Huber
47
* Run Plan attachment:runplan_9p9gev.pdf 
48
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf
49
* 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv
50
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods
51
52
h3. 9.9 GeV Run sheets
53
54
** Heep attachment:heep_9p9.pdf
55
** Luminosity scan attachment:lumi_9p9.pdf
56
** Physics runs attachment:physics_9p9_loweps.pdf
57
58 10 Garth Huber
h2. 6.0 GeV Beam (to be posted in October)
59 2 Garth Huber
60
* Run Plan attachment:runplan_6p0gev.pdf 
61
* Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf
62
* 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv
63
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods
64
65
h3. 6.0 GeV Run sheets
66
67
** Heep attachment:heep_6p0.pdf
68
** Physics runs attachment:physics_6p0_loweps.pdf