2021 Run Plans and Run Sheets » History » Version 25

Garth Huber, 10/11/2021 09:58 PM

1 2 Garth Huber
h1. Fall 2021 Run Plans and Run Sheets
2
3
* Blank Run Sheets
4 14 Garth Huber
** New Configuration Sheet attachment:runsheet_pion21.tgif.ps
5
** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps
6 2 Garth Huber
7 20 Garth Huber
* Run Plan Spread Sheet attachment:pion_loweps_runplan_21sep26.ods
8 2 Garth Huber
9 24 Garth Huber
* JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf  attachment:20211004_JLab_ExpSch.pdf
10 2 Garth Huber
* Beam pipe requirements attachment:beampipe_req.pdf
11 3 Garth Huber
* SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf
12 2 Garth Huber
13
h2. 9.2 GeV Beam
14
15
* Run Plan attachment:runplan_9p2gev.pdf 
16
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf
17 17 Garth Huber
* 9.2 GeV Run list attachment:runlist_pionLT_2021_9p2.csv
18 2 Garth Huber
19
h3. 9.2 GeV Run sheets
20
21 16 Garth Huber
** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf
22 18 Garth Huber
** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf
23 16 Garth Huber
** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf
24 22 Garth Huber
** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf
25 23 Garth Huber
** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf
26 1 Garth Huber
** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf
27 20 Garth Huber
28 25 Garth Huber
h2. 6.0 GeV Beam (to be posted in October)
29 1 Garth Huber
30 25 Garth Huber
* Run Plan attachment:runplan_6p0gev.pdf 
31
* Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf
32
* 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv
33
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods
34 2 Garth Huber
35 25 Garth Huber
h3. 6.0 GeV Run sheets
36 2 Garth Huber
37 25 Garth Huber
** Heep attachment:heep_6p0.pdf
38
** Physics runs attachment:physics_6p0_loweps.pdf
39 10 Garth Huber
40 1 Garth Huber
h2. 9.9 GeV Beam (to be posted in October)
41 2 Garth Huber
42 1 Garth Huber
* Run Plan attachment:runplan_9p9gev.pdf 
43
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf
44
* 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv
45 2 Garth Huber
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods
46 1 Garth Huber
47
h3. 9.9 GeV Run sheets
48 2 Garth Huber
49
** Heep attachment:heep_9p9.pdf
50
** Luminosity scan attachment:lumi_9p9.pdf
51
** Physics runs attachment:physics_9p9_loweps.pdf
52
53 25 Garth Huber
h2. 8.0 GeV Beam (to be posted in October)
54 2 Garth Huber
55 25 Garth Huber
* Run Plan attachment:runplan_8p0gev.pdf 
56
* Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf
57
* 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv
58
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods
59 2 Garth Huber
60 25 Garth Huber
h3. 8.0 GeV Run sheets
61 2 Garth Huber
62 25 Garth Huber
** Heep attachment:heep_8p0.pdf
63
** Luminosity scan attachment:lumi_8p0.pdf
64
** Physics runs attachment:physics_8p0_loweps.pdf
65
66
h2. Special 5.56 GeV Run Plan (in case 5-pass delivery can't continue)
67
68
* Run Plan attachment:runplan_5p56gev.pdf