2021 Run Plans and Run Sheets » History » Version 28
Stephen Kay, 11/05/2021 12:35 PM
| 1 | 2 | Garth Huber | h1. Fall 2021 Run Plans and Run Sheets |
|---|---|---|---|
| 2 | |||
| 3 | * Blank Run Sheets |
||
| 4 | 14 | Garth Huber | ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps |
| 5 | ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps |
||
| 6 | 2 | Garth Huber | |
| 7 | 26 | Garth Huber | * Run Plan Spread Sheet attachment:pion_loweps_runplan_21oct28.ods |
| 8 | 2 | Garth Huber | |
| 9 | 24 | Garth Huber | * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf attachment:20211004_JLab_ExpSch.pdf |
| 10 | 2 | Garth Huber | * Beam pipe requirements attachment:beampipe_req.pdf |
| 11 | 3 | Garth Huber | * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf |
| 12 | 2 | Garth Huber | |
| 13 | h2. 9.2 GeV Beam |
||
| 14 | |||
| 15 | * Run Plan attachment:runplan_9p2gev.pdf |
||
| 16 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf |
||
| 17 | 28 | Stephen Kay | * 9.2 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv |
| 18 | 2 | Garth Huber | |
| 19 | h3. 9.2 GeV Run sheets |
||
| 20 | |||
| 21 | 16 | Garth Huber | ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf |
| 22 | 18 | Garth Huber | ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf |
| 23 | 16 | Garth Huber | ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf |
| 24 | 22 | Garth Huber | ** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf |
| 25 | 23 | Garth Huber | ** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf |
| 26 | 1 | Garth Huber | ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf |
| 27 | 20 | Garth Huber | |
| 28 | 26 | Garth Huber | h2. 6.0 GeV Beam |
| 29 | 1 | Garth Huber | |
| 30 | 25 | Garth Huber | * Run Plan attachment:runplan_6p0gev.pdf |
| 31 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf |
||
| 32 | * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv |
||
| 33 | 2 | Garth Huber | |
| 34 | 25 | Garth Huber | h3. 6.0 GeV Run sheets |
| 35 | 2 | Garth Huber | |
| 36 | 1 | Garth Huber | ** Heep attachment:heep_6p0.pdf |
| 37 | 25 | Garth Huber | ** Physics runs attachment:physics_6p0_loweps.pdf |
| 38 | 10 | Garth Huber | |
| 39 | 26 | Garth Huber | h2. 9.9 GeV Beam |
| 40 | 2 | Garth Huber | |
| 41 | 1 | Garth Huber | * Run Plan attachment:runplan_9p9gev.pdf |
| 42 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf |
||
| 43 | 2 | Garth Huber | * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv |
| 44 | 1 | Garth Huber | |
| 45 | h3. 9.9 GeV Run sheets |
||
| 46 | |||
| 47 | 2 | Garth Huber | ** Heep attachment:heep_9p9.pdf |
| 48 | 1 | Garth Huber | ** Luminosity scan attachment:lumi_9p9.pdf |
| 49 | 2 | Garth Huber | ** Physics runs attachment:physics_9p9_loweps.pdf |
| 50 | |||
| 51 | 26 | Garth Huber | h2. 8.0 GeV Beam |
| 52 | 25 | Garth Huber | |
| 53 | 26 | Garth Huber | * Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf |
| 54 | * Run Plan Part 2 (January) attachment:runplan_8p0gev-2.pdf |
||
| 55 | 25 | Garth Huber | * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf |
| 56 | * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv |
||
| 57 | 2 | Garth Huber | |
| 58 | 25 | Garth Huber | h3. 8.0 GeV Run sheets |
| 59 | 2 | Garth Huber | |
| 60 | 25 | Garth Huber | ** Heep attachment:heep_8p0.pdf |
| 61 | ** Luminosity scan attachment:lumi_8p0.pdf |
||
| 62 | ** Physics runs attachment:physics_8p0_loweps.pdf |