Project

General

Profile

2021 Run Plans and Run Sheets » History » Version 28

Stephen Kay, 11/05/2021 12:35 PM

1 2 Garth Huber
h1. Fall 2021 Run Plans and Run Sheets
2
3
* Blank Run Sheets
4 14 Garth Huber
** New Configuration Sheet attachment:runsheet_pion21.tgif.ps
5
** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps
6 2 Garth Huber
7 26 Garth Huber
* Run Plan Spread Sheet attachment:pion_loweps_runplan_21oct28.ods
8 2 Garth Huber
9 24 Garth Huber
* JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf  attachment:20211004_JLab_ExpSch.pdf
10 2 Garth Huber
* Beam pipe requirements attachment:beampipe_req.pdf
11 3 Garth Huber
* SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf
12 2 Garth Huber
13
h2. 9.2 GeV Beam
14
15
* Run Plan attachment:runplan_9p2gev.pdf 
16
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf
17 28 Stephen Kay
* 9.2 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv 
18 2 Garth Huber
19
h3. 9.2 GeV Run sheets
20
21 16 Garth Huber
** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf
22 18 Garth Huber
** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf
23 16 Garth Huber
** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf
24 22 Garth Huber
** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf
25 23 Garth Huber
** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf
26 1 Garth Huber
** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf
27 20 Garth Huber
28 26 Garth Huber
h2. 6.0 GeV Beam
29 1 Garth Huber
30 25 Garth Huber
* Run Plan attachment:runplan_6p0gev.pdf 
31
* Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf
32
* 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv
33 2 Garth Huber
34 25 Garth Huber
h3. 6.0 GeV Run sheets
35 2 Garth Huber
36 1 Garth Huber
** Heep attachment:heep_6p0.pdf
37 25 Garth Huber
** Physics runs attachment:physics_6p0_loweps.pdf
38 10 Garth Huber
39 26 Garth Huber
h2. 9.9 GeV Beam
40 2 Garth Huber
41 1 Garth Huber
* Run Plan attachment:runplan_9p9gev.pdf 
42
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf
43 2 Garth Huber
* 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv
44 1 Garth Huber
45
h3. 9.9 GeV Run sheets
46
47 2 Garth Huber
** Heep attachment:heep_9p9.pdf
48 1 Garth Huber
** Luminosity scan attachment:lumi_9p9.pdf
49 2 Garth Huber
** Physics runs attachment:physics_9p9_loweps.pdf
50
51 26 Garth Huber
h2. 8.0 GeV Beam
52 25 Garth Huber
53 26 Garth Huber
* Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf
54
* Run Plan Part 2 (January) attachment:runplan_8p0gev-2.pdf 
55 25 Garth Huber
* Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf
56
* 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv
57 2 Garth Huber
58 25 Garth Huber
h3. 8.0 GeV Run sheets
59 2 Garth Huber
60 25 Garth Huber
** Heep attachment:heep_8p0.pdf
61
** Luminosity scan attachment:lumi_8p0.pdf
62
** Physics runs attachment:physics_8p0_loweps.pdf