Project

General

Profile

Actions

2021 Run Plans and Run Sheets » History » Revision 26

« Previous | Revision 26/53 (diff) | Next »
Garth Huber, 10/28/2021 11:24 PM


Fall 2021 Run Plans and Run Sheets

9.2 GeV Beam

9.2 GeV Run sheets

6.0 GeV Beam

6.0 GeV Run sheets

  • Heep attachment:heep_6p0.pdf
  • Physics runs attachment:physics_6p0_loweps.pdf

9.9 GeV Beam

9.9 GeV Run sheets

  • Heep attachment:heep_9p9.pdf
  • Luminosity scan attachment:lumi_9p9.pdf
  • Physics runs attachment:physics_9p9_loweps.pdf

8.0 GeV Beam

  • Run Plan Part 1 (December) runplan_8p0gev-1.pdf
  • Run Plan Part 2 (January) runplan_8p0gev-2.pdf
  • Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf
  • 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv
  • Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods

8.0 GeV Run sheets

  • Heep attachment:heep_8p0.pdf
  • Luminosity scan attachment:lumi_8p0.pdf
  • Physics runs attachment:physics_8p0_loweps.pdf

Special 5.56 GeV Run Plan (in case 5-pass delivery can't continue)

Updated by Garth Huber over 2 years ago · 26 revisions