2021 Run Plans and Run Sheets » History » Version 29
Garth Huber, 11/10/2021 10:39 AM
1 | 2 | Garth Huber | h1. Fall 2021 Run Plans and Run Sheets |
---|---|---|---|
2 | |||
3 | * Blank Run Sheets |
||
4 | 14 | Garth Huber | ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps |
5 | ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps |
||
6 | 2 | Garth Huber | |
7 | 26 | Garth Huber | * Run Plan Spread Sheet attachment:pion_loweps_runplan_21oct28.ods |
8 | 2 | Garth Huber | |
9 | 24 | Garth Huber | * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf attachment:20211004_JLab_ExpSch.pdf |
10 | 2 | Garth Huber | * Beam pipe requirements attachment:beampipe_req.pdf |
11 | 3 | Garth Huber | * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf |
12 | 2 | Garth Huber | |
13 | h2. 9.2 GeV Beam |
||
14 | |||
15 | * Run Plan attachment:runplan_9p2gev.pdf |
||
16 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf |
||
17 | 28 | Stephen Kay | * 9.2 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv |
18 | 2 | Garth Huber | |
19 | h3. 9.2 GeV Run sheets |
||
20 | |||
21 | 16 | Garth Huber | ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf |
22 | 18 | Garth Huber | ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf |
23 | 16 | Garth Huber | ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf |
24 | 22 | Garth Huber | ** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf |
25 | 23 | Garth Huber | ** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf |
26 | 1 | Garth Huber | ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf |
27 | 20 | Garth Huber | |
28 | 26 | Garth Huber | h2. 6.0 GeV Beam |
29 | 1 | Garth Huber | |
30 | 25 | Garth Huber | * Run Plan attachment:runplan_6p0gev.pdf |
31 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf |
||
32 | * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv |
||
33 | 2 | Garth Huber | |
34 | 25 | Garth Huber | h3. 6.0 GeV Run sheets |
35 | 2 | Garth Huber | |
36 | 29 | Garth Huber | ** All runs attachment:runsheets_6p0gev.pdf |
37 | 10 | Garth Huber | |
38 | 26 | Garth Huber | h2. 9.9 GeV Beam |
39 | 2 | Garth Huber | |
40 | 1 | Garth Huber | * Run Plan attachment:runplan_9p9gev.pdf |
41 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf |
||
42 | 2 | Garth Huber | * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv |
43 | 1 | Garth Huber | |
44 | h3. 9.9 GeV Run sheets |
||
45 | |||
46 | 2 | Garth Huber | ** Heep attachment:heep_9p9.pdf |
47 | 1 | Garth Huber | ** Luminosity scan attachment:lumi_9p9.pdf |
48 | 2 | Garth Huber | ** Physics runs attachment:physics_9p9_loweps.pdf |
49 | |||
50 | 26 | Garth Huber | h2. 8.0 GeV Beam |
51 | 25 | Garth Huber | |
52 | 26 | Garth Huber | * Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf |
53 | * Run Plan Part 2 (January) attachment:runplan_8p0gev-2.pdf |
||
54 | 25 | Garth Huber | * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf |
55 | * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv |
||
56 | 2 | Garth Huber | |
57 | 25 | Garth Huber | h3. 8.0 GeV Run sheets |
58 | 2 | Garth Huber | |
59 | 25 | Garth Huber | ** Heep attachment:heep_8p0.pdf |
60 | ** Luminosity scan attachment:lumi_8p0.pdf |
||
61 | ** Physics runs attachment:physics_8p0_loweps.pdf |