Project

General

Profile

2021 Run Plans and Run Sheets » History » Revision 47

Revision 46 (Garth Huber, 12/18/2021 10:49 PM) → Revision 47/53 (Garth Huber, 12/19/2021 07:41 PM)

h1. Fall 2021 Run Plans and Run Sheets 

 * Blank Run Sheets 
 ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps 
 ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps 

 * Run Plan Spread Sheet attachment:pion_loweps_runplan_21dec20.ods 

 * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf    attachment:20211004_JLab_ExpSch.pdf    attachment:20211122_JLab_ExpSch.pdf 
 * Beam pipe requirements attachment:beampipe_req.pdf 
 * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf 

 h2. 9.2 GeV Beam 

 * Run Plan attachment:runplan_9p2gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf 
 * 9.2 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv  
 * 9.2 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_9p173.ods attachment:runlist_pionLT_2021_Eb_9p173.pdf 

  

 h3. 9.2 GeV Run sheets 

 ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf 
 ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf 
 ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf 
 ** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf 
 ** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf 
 ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf 

 h2. 6.0 GeV Beam 

 * Run Plan attachment:runplan_6p0gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf 
 * 6.0 GeV Run list attachment:runlist_pionLT_2021_Eb_5p985.csv 
 * 6.0 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_5p985.ods attachment:runlist_pionLT_2021_Eb_5p985.pdf 

 h3. 6.0 GeV Run sheets    attachment:runsheets_6p0gev.pdf 

 h2. 9.9 GeV Beam 

 * Run Plan attachment:runplan_9p9gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf 
 * 9.9 GeV Run list attachment:runlist_pionLT_2021_Eb_9p876.csv 
 * 9.9 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_9p876.ods attachment:runlist_pionLT_2021_Eb_9p876.pdf 

 h3. 9.9 GeV Run sheets 

 ** Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf 
 ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf 
 ** Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf 
 ** Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf 
 ** Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf 

 h2. 8.0 GeV Beam 

 * Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf 
 * Run Plan Part 2 (Jan/Feb) attachment:runplan_8p0gev-2.pdf  
 * Scanned run plan (December) (with shift worker and RC notes) attachment:runplan_8p0gev-1_scan.pdf 
 * Scanned run plan (Jan/Feb) (with shift worker and RC notes) attachment:runplan_8p0gev-2_scan.pdf 
 * Special EDTM study w/ Cosmics attachment:Runplan_EDTM_21dec01.pdf 
 * 8.0 GeV Run list (December) attachment:runlist_pionLT_2021_Eb_7p937-1.csv 
 * 8.0 GeV Run list (Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937-2.csv 
 * 8.0 GeV Run list (formatted--December) attachment:runlist_pionLT_2021_Eb_7p937-1.ods attachment:runlist_pionLT_2021_Eb_7p937-1.pdf 
 * 8.0 GeV Run list (formatted--Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937-2.ods attachment:runlist_pionLT_2021_Eb_7p937-2.pdf 

 h3. 8.0 GeV Run sheets 

 ** Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf 
 ** Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf 
 ** Special EDTM study w/ Cosmics attachment:runsheets_EDTM_21dec01.pdf 
 ** Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf 
 ** Physics #3 pi+ (Jan/Feb) attachment:runsheets_8p0gev-3_piplus.pdf 
 ** Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) attachment:runsheets_8p0gev_calib2.pdf 
 ** Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf