Project

General

Profile

Actions

2021 Run Plans and Run Sheets » History » Revision 47

« Previous | Revision 47/53 (diff) | Next »
Garth Huber, 12/19/2021 07:41 PM


Fall 2021 Run Plans and Run Sheets

9.2 GeV Beam

9.2 GeV Run sheets

6.0 GeV Beam

6.0 GeV Run sheets runsheets_6p0gev.pdf

9.9 GeV Beam

9.9 GeV Run sheets

8.0 GeV Beam

  • Run Plan Part 1 (December) runplan_8p0gev-1.pdf
  • Run Plan Part 2 (Jan/Feb) runplan_8p0gev-2.pdf
  • Scanned run plan (December) (with shift worker and RC notes) runplan_8p0gev-1_scan.pdf
  • Scanned run plan (Jan/Feb) (with shift worker and RC notes) runplan_8p0gev-2_scan.pdf
  • Special EDTM study w/ Cosmics Runplan_EDTM_21dec01.pdf
  • 8.0 GeV Run list (December) attachment:runlist_pionLT_2021_Eb_7p937-1.csv
  • 8.0 GeV Run list (Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937-2.csv
  • 8.0 GeV Run list (formatted--December) attachment:runlist_pionLT_2021_Eb_7p937-1.ods attachment:runlist_pionLT_2021_Eb_7p937-1.pdf
  • 8.0 GeV Run list (formatted--Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937-2.ods attachment:runlist_pionLT_2021_Eb_7p937-2.pdf

8.0 GeV Run sheets

Updated by Garth Huber about 3 years ago · 47 revisions