Actions
Analysis Tasks » History » Revision 15
« Previous |
Revision 15/70
(diff)
| Next »
Muhammad Junaid, 05/03/2023 01:24 PM
- Table of contents
- Analysis Tasks
Analysis Tasks¶
Fall 2021/Summer 2022 Run | - | Completed |
Calibrations | 2 months | Ongoing |
Lumi Studies (includes FADC studies) | 6 months | On Deck |
HEEP Studies (efficiencies, PID and offsets) | 8 months | To Do |
Physics Production Studies | 2 months | To Do |
LT Separation Studies | 8 - 16 months | To Do |
Form factor extraction | 1 - 2 week | To Do |
This is a summary page with the progress of the PionLT experiment. Above is a quick outline of our current progress. Below are tasks assigned to members of the group. Anyone who is part of the group may contribute to a task with suggestions and/or updates on progress. Please contact the assignee on a task-by-task basis for any queries. Anyone with general questions can contact Jacob Murphy (jm443918@ohio.edu), Muhammad Junaid (junaid@jlab.org) and Nathan Heinrich (heinricn@uregina.ca).
Ongoing¶
Expected to be completed in the start of July, 2023
Calibrations In Progress¶
- Kinematic Check
- Jacob
- Ensure Kinematics are correctly labeled in analysis
- Check 2021 Kinematic Settings
- Check 2021 Offsets
- Check 2022 Kinematic Settings
- Check 2022 Offsets
- Per Peter Bosted's suggestion, look at ELCLEAN and BCM scalars (in report file) and determine stability (can also check previous run periods)
- Good way to determine runs with issues as the ratio should be constant with current/rate
- Timing Cuts
- Jacob
- ADC/TDC timing windows should be checked/applied for all run periods
- HMS+SHMS DC (Junaid)
- In Progress
- Carlos worked on this analysis, finding drift times card-by-card
- Calorimeter (Junaid)
- Use defocused run (With the correct optical matrix, https://logbooks.jlab.org/entry/4050240)
- HGCer (Nathan)
- In Progress
- Find SPE peak (low event run)
- NGCer (Nathan)
- No SPE peak to find
- Check width of peak (high event run)
- width is root n of mean value
- Script is available (Cameron C. did it for XEM 2)
- HMS Cer (Nathan)
- In Progress
- Find the SPE peak
- Aerogel (Nathan)
- Completed
- HMS+SHMS Hodoscope (Jacob)
- Dave Mack/Carlos Yero/Jacob
- 2021 SHMS calibrations in good shape
- 2021 HMS calibrations should be double-checked
- 2022 HMS and SHMS calibrations should ideally be done with defocused and maintain throughout the run period
- Saturation Corrections to Optical Matrices
- Jacob
- HMS 6.6 GeV
- Carbon-Sieve
- DONE
- Elastic Delta Scan
- DONE
- Carbon-Sieve
- HMS 6.8 GeV
- Carbon-Sieve
- In-progress
- Elastic Delta Scan
- To-do
- Carbon-Sieve
- HMS 5.9 GeV
- Carbon-Sieve
- To-do
- Elastic Delta Scan
- To-do
- Carbon-Sieve
- HMS 5.6 GeV
- Carbon-Sieve
- To-do
- Elastic Delta Scan
- To-do
- Carbon-Sieve
- SHMS 8.0 GeV
- Jacob needs to meet with Holly/Mark to confirm procedure here
- Carbon-Sieve
- To-do
- Elastic Delta Scan
- To-do
- Boiling Studies
- On Deck
- 2022 Single-arm studies
- fADC Mode 10 Deadtime studes (COIN scan)
- Other luminosity scans
- Offsets from HeeP Coin/Singles data
- To Do
- Physics Production Studies
- To Do
- LT Separation Studies
- To Do
- Iterative process
- Form factor extraction (Junaid)
- To Do
- Scaling Study (Nathan)
- To Do
Updated by Muhammad Junaid over 1 year ago · 15 revisions