Analysis Tasks¶
Summer-2019/Fall-2021/Summer-2022 Run | Sep 2022 | Completed |
Calibrations | Nov 2023 | Completed |
Efficiency Studies | 2 months | On going |
Lumi Studies (includes FADC studies) | 6 months | On Deck |
HEEP Studies (PID and offsets) | 6 months | On Deck |
Physics Production Studies | 2 months | To Do |
LT Separation Studies | 8 - 16 months | To Do |
Form Factor extraction | 1 - 2 week | To Do |
Scaling Study | 1 week | To Do |
This is a summary page with the progress of the PionLT experiment. Above is a quick outline of our current progress. Below are tasks assigned to members of the group. Anyone who is part of the group may contribute to a task with suggestions and/or updates on progress. Please contact the assignee on a task-by-task basis for any queries. Anyone with general questions can contact Jacob Murphy (jm443918@ohio.edu), Muhammad Junaid (mjo147@uregina.org) and Nathan Heinrich (heinricn@uregina.ca).
Completed Tasks
Detector Calibrations Completed¶
- Kinematic Check Done
- Ensure Kinematics are correctly labeled in the analysis
- Check 2021 Kinematic Settings
- Check 2021 Offsets (still needs to be checked)
- Check 2022 Kinematic Settings
- Check 2022 Offsets (still needs to be checked)
- Ensure Kinematics are correctly labeled in the analysis
- Per Peter Bosted's suggestion, look at ELCLEAN and BCM scalars (in report file) and determine stability (can also check previous run periods)
- Good way to determine runs with issues as the ratio should be constant with current/rate
- Timing Cuts
- Nathan
- ADC/TDC timing windows should be checked/applied for all run periods
- HMS+SHMS DC (Junaid)
- Carlos worked on this analysis, finding drift times card-by-card
- Completed
- Calorimeter (Junaid)
- Use defocused run (With the correct optical matrix, https://logbooks.jlab.org/entry/4050240)
- Completed
- HGCer (Nathan)
- Find SPE peak (low event run)
- Completed
- NGCer (Nathan)
- No SPE peak to find
- Check width of peak (high event run)
- width is root n of mean value
- Script is available (Cameron C. did it for XEM 2)
- Completed
- HMS Cer (Nathan)
- Find the SPE peak
- Completed
- Aerogel (Nathan)
- Completed
- HMS+SHMS Hodoscope (Jacob, Junaid, Nathan)
- Dave Mack/Carlos Yero/Jacob
- 2021 SHMS calibrations in good shape
- 2021 HMS calibrations should be double-checked
- 2022 HMS and SHMS calibrations should ideally be done with defocused and maintained throughout the run period
- Did recalibrations because files were missing.
- Finished Timewalk Calibrations. (Nathan)
- Finished VpCalib Calibrations. (Junaid)
- Completed
Ongoing¶
Expected to be completed in the Jan, 2024
Efficiency Studies In Progress¶
- Efficiency Studies (Junaid)
- Updated DEF-Cut files
- Done Setting up Report files
- Setting replay scripts
- Saturation Corrections to Optical Matrices
- Jacob
- HMS 6.6 GeV
- Carbon-Sieve
- DONE
- Elastic Delta Scan
- DONE
- Carbon-Sieve
- HMS 6.8 GeV
- Carbon-Sieve
- In-progress
- Elastic Delta Scan
- To-do
- Carbon-Sieve
- HMS 5.9 GeV
- Carbon-Sieve
- To-do
- Elastic Delta Scan
- To-do
- Carbon-Sieve
- HMS 5.6 GeV
- Carbon-Sieve
- To-do
- Elastic Delta Scan
- To-do
- Carbon-Sieve
- SHMS 8.0 GeV
- Jacob needs to meet with Holly/Mark to confirm procedure here
- Carbon-Sieve
- To-do
- Elastic Delta Scan
- To-do
Upcoming¶
- Boiling Studies
- On Deck
- 2022 Single-arm studies
- fADC Mode 10 Deadtime studes (COIN scan)
- Other luminosity scans
- Offsets from HeeP Coin/Singles data
- On Deck
- Physics Production Studies
- To Do
- LT Separation Studies
- To Do
- Iterative process
- Form factor extraction (Junaid)
- To Do
- Scaling Study (Nathan)
- To Do