Analysis Tasks » History » Revision 66
Revision 65 (Muhammad Junaid, 03/02/2024 03:04 PM) → Revision 66/70 (Muhammad Junaid, 03/02/2024 11:25 PM)
{{>toc}} h1. Analysis Tasks | *Summer-2019/Fall-2021/Summer-2022 Run* | Sep 2022 | %{background:lightgreen}Completed% | | *Calibrations* | Nov 2023 | %{background:lightgreen}Completed% | | *Tracking Efficiency Studies* | 2 months | %{background:lightgreen}Completed% | | *Detector Efficiency Studies* | 1 months | %{background:orange}On deck% | | *Lumi Studies (includes FADC studies)* | 6 months | %{background:yellow}On going%| | *HEEP Studies (PID and offsets)* | 6 months | %{background:yellow}On going% | | *Physics Production Studies* | 2 months | %{background:red}To Do% | | *LT Separation Studies* | 8 - 16 months | %{background:red}To Do% | | *Form Factor extraction* | 1 - 2 week | %{background:red}To Do% | | *Scaling Study* | 1 week | %{background:red}To Do% | This is a summary page with the progress of the PionLT experiment. Above is a quick outline of our current progress. Below are tasks assigned to members of the group. Anyone who is part of the group may contribute to a task with suggestions and/or updates on progress. Please contact the assignee on a task-by-task basis for any queries. Anyone with general questions can contact Jacob Murphy (jm443918@ohio.edu), Muhammad Junaid (mjo147@uregina.org) and Nathan Heinrich (heinricn@uregina.ca). h2. +Completed Tasks+ h3. Detector Calibrations **%{background:lightgreen}Completed%** * Kinematic Check Done ** Ensure Kinematics are correctly labeled in the analysis *** Check 2021 Kinematic Settings *** Check 2021 Offsets (still needs to be checked) *** Check 2022 Kinematic Settings *** Check 2022 Offsets (still needs to be checked) ** Per Peter Bosted's suggestion, look at ELCLEAN and BCM scalars (in report file) and determine stability (can also check previous run periods) *** Good way to determine runs with issues as the ratio should be constant with current/rate * Timing Cuts ** Nathan ** ADC/TDC timing windows should be checked/applied for all run periods * HMS+SHMS DC (Junaid) ** Carlos worked on this analysis, finding drift times card-by-card ** Completed * Calorimeter (Junaid) ** Use defocused run (With the correct optical matrix, https://logbooks.jlab.org/entry/4050240) ** Completed * HGCer (Nathan) ** Find SPE peak (low event run) ** Completed * NGCer (Nathan) ** No SPE peak to find ** Check width of peak (high event run) *** width is root n of mean value ** Script is available (Cameron C. did it for XEM 2) ** Completed * HMS Cer (Nathan) ** Find the SPE peak ** Completed * Aerogel (Nathan) ** Completed * HMS+SHMS Hodoscope (Jacob, Junaid, Nathan) ** Dave Mack/Carlos Yero/Jacob ** 2021 SHMS calibrations in good shape ** 2021 HMS calibrations should be double-checked ** 2022 HMS and SHMS calibrations should ideally be done with defocused and maintained throughout the run period ** Did recalibrations because files were missing. ** Finished Timewalk Calibrations. (Nathan) ** Finished VpCalib Calibrations. (Junaid) ** Completed h3. Tracking Efficiency Studies **%{background:lightgreen}Completed%** * Efficiency Studies (Junaid) ** Updated DEF-Cut files. ** Done Setting up Report files. ** Generated BCM currents for PionLT data. ** Set up replay scripts. h2. +Ongoing+ **%{background:yellow}Expected to be completed in the June, 2024%** h4. HeeP Studies **%{background:yellow} On going%** * HeeP Studies (Junaid) ** Offsets from HeeP Coin/Singles data h4. Lumi Studies **%{background:yellow} On going%** * Lumi Studies (Nathan) ** Boiling Studies ** 2022 Single-arm studies ** fADC Mode 10 Deadtime studes (COIN scan) ** Other luminosity scans h2. +Upcoming+ * Saturation Corrections to Optical Matrices ** Jacob ** HMS 6.6 GeV *** Carbon-Sieve **** DONE *** Elastic Delta Scan **** DONE ** HMS 6.8 GeV *** Carbon-Sieve **** In-progress *** Elastic Delta Scan **** To-do ** HMS 5.9 GeV *** Carbon-Sieve **** To-do *** Elastic Delta Scan **** To-do ** HMS 5.6 GeV *** Carbon-Sieve **** To-do *** Elastic Delta Scan **** To-do ** SHMS 8.0 GeV *** Jacob needs to meet with Holly/Mark to confirm procedure here *** Carbon-Sieve **** To-do *** Elastic Delta Scan **** To-do * Physics Production Studies ** To Do * LT Separation Studies ** To Do ** Iterative process * Form factor extraction (Junaid) ** To Do * Scaling Study (Nathan) ** To Do h2. +Full Replays of PionLT Data+ * Finished Full Replay Pass1 (Junaid). attachment:Full_Replay_Pass1_&_Efficiency_Study.pdf * Finished Full Replay Pass1_v2 - Included BCM current params (Junaid).