- 04:13 AM Enge SciFi Task #1114: Beta ray test
- typical npe of Sr90 source
- 04:12 AM Enge SciFi Task #1114: Beta ray test
- h2. NPE study
h3. setup
source - fiber(CH1) - triger Sci(CH2)
# of fiber = 1, 1 mm x 1 mm
triger 3 mm...
07/07/2025
- 10:31 PM HES Hodo Task #1123 (New): Connector Reinforce
- Connectors backend of the HES Hodo PMTs are very fragile. They should be reinforced and insulated with heat-shrinkabl...
- 10:23 PM HES Hodo Task #1120: Hodoscope Spare
- I found the last one scintillator paddle of HES hodoscope in ESB, but the connecting part between paddle and light gu...
07/02/2025
- 10:13 PM HKS Hodo Task #1121 (New): Hodoscope Spare
- Some of backup counters will be prepared??
we don't have H1949. - 10:08 PM HES Hodo Task #1120 (New): Hodoscope Spare
- We have missed one HES hodoscope. Look for one of this.
Some of backup counter should be prepared
06/24/2025
- 07:20 AM Enge SciFi Task #1107: MPPC Gain Study
- test cable was broken
- 07:19 AM Enge SciFi Task #1107: MPPC Gain Study
- Noise reduction
EASIROC upper side flame is critical to noise reduction. Aftre fixing, noise level is about 40 mV