h1. *Kaon LT Meetings*
4
5 41 Stephen Kay
Kaon LT collaboration analysis meetings. Please add your talk to the meeting ahead of time. Add the newest meeting to the top of the list!
6
7 2 Richard Trotta
----
8
9 68 Richard Trotta
h2. Nov 5,2019
10
11
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500
12
13
* Timing update (Stephen)
14
** Reference times between Richard and Stephen are very similar and the GitHub is updated accordingly
15
** Richard is going to add the trigger time cuts once the fall runs are finished (by end of week)
16
** First pass of detector reference time parameter files finished
17
18
* Peter's hcana code (Richard and Stephen)
19
** Peter's code does not remove ghost bands (already known), but now Stephen is seeing a strang horizontal band for just SHMS hodoscope 2D plots
20
*** Richard has emailed Peter about the issue with no response yet (follow-up soon)
21
** This means we still need the reference time amplitude cut with Peter's code but using just the amplitude cut with Mark's latest version of hcana should be sufficient for calibrations.
22
23
* Calibrations were decided to be done once per shift
24
25
* Next meeting schedule...
26
** Small meetings Nov 12 and Nov 19 (at 3pm ET) so Richard and Stephen can iron out the timing and calibrations
27
** November 26 (at 3pm ET) will be a larger meeting. 
28
*** This is the rough deadline we made for finishing up calibrations. 
29
*** This should be sufficient for all detectors (although hodoscope and HG which may persist). The ultimate goal is for all calibrations to be finished up before Winter break!!
30
31
----
32
33 62 Richard Trotta
h2. Oct 22,2019
34
35 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
36 62 Richard Trotta
37 65 Richard Trotta
* SHMS Reference Time Amplitude Cuts(Stephen)
38
** Extra peaks in HG from cross-talk and "ghost-bands" due to ADC screw up
39
*** cuts applied on SHMS ADC ref time amplitude (greater than zero) done before any further event selection and histogram filling
40
** This is a temporary fix to "ghost-bands" and cross talk
41
*** Although for HG there is still a small peak. The hodoscope is fine.
42
** The time window is easier to set now.
43
** DC has been fine (since it uses TDC)
44
*** DC calibrations should be good to complete, other detectors need more fixes (i.e. the remaining "ghost-band")
45
** Hodoscope still bad but this might be because of that "ghost-band", needs to be further investigated
46
47
* Peter's hcana fixes for reference time (Richard)
48
** Peter implemented changes to hcana
49
** Two major issues...
50 67 Richard Trotta
## Amplitude goes to null and integral is low or negative which causes a rate-dependent efficiency. 
51
*** Peter has used the average pulse value acquired over a large sample of runs for each detector. 
52 1 Richard Trotta
## Timing offset between EL-REAL and 3/4 is 130 ns which causes junk tracks at high SHMS rates (~6% of the time)
53 67 Richard Trotta
*** Peter created a routine to find the best offset by means of matching TDC and ADC
54
** Richard has been checking for bugs in the code. 
55
*** It seems to be ready to implement, Richard emailed Peter for confirmation on the implementation in our group directory
56
57
* Calibration of HMS detectors when the timing is agreed upon by Stephen and Richard.
58
** Besides hodoscope which still has an issue with the script
59
** Stephen and Richard are having a meeting late next week to determine time window values
60
*** These will be relatively final, but on the wider side if adjustments need to be made in the future
61 65 Richard Trotta
62 62 Richard Trotta
-----
63
64 61 Richard Trotta
h2. Sep 24,2019
65
66 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
67 61 Richard Trotta
68
-----
69
70 59 Vijay Kumar
h2. Sep 10,2019
71 1 Richard Trotta
72 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/72 "Richard":https://redmine.jlab.org/issues/500
73 59 Vijay Kumar
74
-----
75 55 Stephen Kay
76 1 Richard Trotta
h2. August 26, 2019
77 55 Stephen Kay
78 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/70 "Vijay":https://redmine.jlab.org/documents/71 "Richard":https://redmine.jlab.org/issues/500
79 55 Stephen Kay
80
----
81
82 54 Richard Trotta
h2. June 21, 2019
83
84
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 
85
86
----
87
88 42 Stephen Kay
h2. June 14, 2019
89
90 53 Garth Huber
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/64 "Update-Mireille":https://redmine.jlab.org/documents/65 "Vijay":https://redmine.jlab.org/attachments/download/814/Analy_update3.pdf
91 52 Garth Huber
92 46 Richard Trotta
93 42 Stephen Kay
----
94
95 35 Stephen Kay
h2. June 4, 2019
96 1 Richard Trotta
97 40 Mireille Muhoza
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/56 "Nathan":https://redmine.jlab.org/documents/57 "Vijay":https://redmine.jlab.org/documents/58 "Richard":https://redmine.jlab.org/documents/59 "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/61
98 36 Vijay Kumar
99 1 Richard Trotta
100 35 Stephen Kay
----
101 1 Richard Trotta
102 35 Stephen Kay
h2. May 21, 2019
103 1 Richard Trotta
104 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/52 "Mireille":https://redmine.jlab.org/documents/? "Stephen":https://redmine.jlab.org/documents/53 "Nathan":https://redmine.jlab.org/documents/54 "Vijay":https://redmine.jlab.org/documents/55
105
106 1 Richard Trotta
----
107
108 35 Stephen Kay
h2. May 14, 2019
109 1 Richard Trotta
110 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/48 "Carlos' slides":https://redmine.jlab.org/documents/49 "Mireille":https://redmine.jlab.org/documents/50 "Stephen":https://redmine.jlab.org/documents/51
111 1 Richard Trotta
112
----
113
114 35 Stephen Kay
h2. April 30, 2019
115 1 Richard Trotta
116 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/45 "Richard's slides in wiki":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_How-To "Brad Computing":https://redmine.jlab.org/documents/46 "Stephen":https://redmine.jlab.org/documents/47
117 1 Richard Trotta
118
----
119
120 35 Stephen Kay
h2. February 4, 2019
121 1 Richard Trotta
122 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/43 "Stephen":https://redmine.jlab.org/documents/44
123 1 Richard Trotta
124 35 Stephen Kay
----
125 1 Richard Trotta
126 35 Stephen Kay
h2. August 21, 2018
127 1 Richard Trotta
128 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
129 1 Richard Trotta
130 35 Stephen Kay
----
131 1 Richard Trotta
132 35 Stephen Kay
h2. August 8, 2018
133 1 Richard Trotta
134 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
135
136 1 Richard Trotta
----
137
138 35 Stephen Kay
h2. August 3, 2018
139 1 Richard Trotta
140 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383
141
*Links to talks->*
142 1 Richard Trotta
143 35 Stephen Kay
----
144 1 Richard Trotta
145 35 Stephen Kay
h2. July 11, 2018
146 1 Richard Trotta
147 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #384
148 1 Richard Trotta
149 35 Stephen Kay
*Action items:*
150 1 Richard Trotta
151 35 Stephen Kay
* Update run plan, e.g. add prescales (Garth)
152
* Check on details of: magnet cycling procedure, minimum angles, MCC fringe field steering, beam energy measurements, optics checks (Tanja)
153
* Identify additional run coordinators (Tanja)
154
* Encourage collaborators to take shifts, e.g. FIU (Pete)
155
* Draft email about shifts etc. to collaboration (Tanja)
156
* Develop diagnostic scripts and kaonLT specific (Richard, Ryan)
157
* Continue documentation development, e.g. checklist, shift taker instructions, HowTo or link to generic Hall C HowTo, task list, web page (Richard, Garth)
158 1 Richard Trotta
159 35 Stephen Kay
*Discussions:*
160 1 Richard Trotta
161 35 Stephen Kay
* SHMS Aerogel Cherenkov: tray has been changed to SP-11 on 10 July, nominal time for change is 8 hours, one tray can stay in the hall to minimize overhead
162
* HGC: waiting for re-installation
163
* Trigger checkout: main items to keep in mind: fADC thresholds, timing HMS/SHMS - leading arm, possible rate limitations
164
* Shifts
165
* Diagnostics scripts and documentation
166
* Personnel schedules
167 1 Richard Trotta
168
----
169
170
h2. June 28, 2018
171
172
*Links to talks->* "Richard":https://redmine.jlab.org/documents/34
173
174
*Action Items:*
175
176
* Develop and post shift schedule. Send out request. Find out who is KAONLT liaison (Tanja)
177
* Contact potential run coordinators. (Tanja)
178
* Aerogel tray exchange for start of experiment and coordination of future exchanges (Vladimir)
179
* Update runplan and prepare documents needed for shift crew, e.g. run sheets (Garth)
180
* Set up a web page to collect and link from Redmine - How-To documents, initial calibrations, etc. (Garth, Richard)
181
* Adapt luminosity scan script to calculate kaon yields by run number for use during experiment by shift crew - has to be simple to use. (Richard)
182
* Develop trigger/detector checkout plan (Tanja, initial draft)
183
** Are all experts available at run start, experts needed: coincidence timing , Harp Scans, BCM calibrations, ...
184
* Find out from JLab what the anticipated settings are for limit switches for both spectrometers and for separation angle in between them. Also find out what magnet cycling procedure should be used for L/T quality separation data (Tanja)
185
* Find out if all aerogel trays needed for experiment can be stored inside Hall C to avoid having to open truck ramp (Vladimir)
186
187
*Analysis Updates:*
188
189
* Ryan 
190
** resolving differences between his analysis and Richard's
191
192
* Richard
193
** Discussed with Mark Jones and is cross checking his January luminosity scan analysis against Mark's. Realized that BCM calibrations (gains, offsets etc) are different - currently working on fixing that, presents current results - low curent point is ~10% below unity, discussion that this seems to indicate that BCM offsets are the issue as low current points would be most sensitive, is planning to also double-check the BCM calibration procedure - had discussion with Dave Mack at JLab
194
** Presents a script developed for luminosity scans that determines yields for a run number input on command line. Discussion this could be good to adapt for kaon counting during experiment.
195
196
----
197
198 35 Stephen Kay
h2. May 31, 2018
199 1 Richard Trotta
200 35 Stephen Kay
*Links to talks->* "Samip":https://redmine.jlab.org/documents/30
201 1 Richard Trotta
202 35 Stephen Kay
----
203 1 Richard Trotta
204 35 Stephen Kay
h2. May 17, 2018 
205 1 Richard Trotta
206 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/29, "Ryan":https://hallcweb.jlab.org/DocDB/0009/000968/001/Presentation.pdf, "Samip":https://redmine.jlab.org/documents/30
207 2 Richard Trotta
208 35 Stephen Kay
* Luminosity scans (Richard, Ryan)
209
** Carbon scan from April seems consistent with no boiling, LH2 and LD2 show deviation from unity, should check effect of EDTM events on efficiencies
210
** Carbon scans from January (low rates) have large deviations from unity, in particular behavior at higher currents (>40uA), e.g. cpu dead time, that is not yet understood
211
** discussion about pre-scale factors
212 1 Richard Trotta
213 35 Stephen Kay
* Discussion about Richard's script extracting and printing information from report files and trees including histograms
214
** Add option for looking at yields with cuts on cointime, target window, and missing mass
215
** Add option to look at real peak vs. background level
216 1 Richard Trotta
217 35 Stephen Kay
* H(e,e'p) kinematics investigation for fall run (Samip)
218
** Optimal range is between electron angles of 17-20 degrees, time required ranges from ~1 hour at 17 degrees to ~3 hour at 20 degrees, other angles may be of interest for disentangling charge and current dependent effects
219 1 Richard Trotta
220 35 Stephen Kay
* *Action Items*
221
** Luminosity scans at low rates from January (Richard)
222
** Luminosity scans from April with corrected efficiencies, e.d. DT (Ryan)
223
** H(e,e'p) and H(e,e') kinematics for upcoming Kaon LT run (Samip)
224
** Kaon LT detailed run plan (Garth, Pete, Tanja)
225
** Preparations, e.g. report files, diagnostic histograms and real time monitoring, shift worker instructions, optimization of trees (all)
226 1 Richard Trotta
227
----
228
229 35 Stephen Kay
h2. May 10, 2018
230 1 Richard Trotta
231 35 Stephen Kay
*Links to talks->* "Hem":https://redmine.jlab.org/documents/24, "Richard":https://redmine.jlab.org/documents/23, "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/26
232 2 Richard Trotta
233 35 Stephen Kay
* Luminosity Scans January 2018 (Richard)
234
** Tracking-based analysis for Runs 1415-1423, .. for now focus on HMS, typical HMS S1X rates are <
235
** Cuts applied: PID for electrons (Cer, Cal), acceptance (delta)
236
** Efficiency calculation was investigated in detail and applied using scalers from trees
237
** Results for carbon (normalized to 30uA) show large variation - need to understand
238
** *Next steps:*
239
*** Double check calculation of computer lifetime, look for differences in TRIG and PRETRIG scalers
240
*** Check stability of pre-scale (Ryan saw changes within runs)
241
*** Check if detector calibrations for runs are implemented correctly
242
*** Analyze with Ryan's cuts
243 1 Richard Trotta
244 35 Stephen Kay
* Luminosity Scans April 2018 (Ryan)
245
** Confirms Richard's earlier finding that scaler-based analysis is not reliable and that it's best to analyze event-by-event
246
** Tracking-based analysis for runs 2073-2095
247
** Cuts applied: PID for electrons (TOF, Cal, Chi2), acceptance (delta and angles), BCM4a
248
** Included most recent detector calibrations in replay of these runs
249
** Efficiencies from report file mainly, may need to update tracking efficiency implementation
250
** Found that calculations of computer deadtime requires different set of scalers for runs from January to those from April 2018
251
** Results show carbon yields consistent with unity within error (0.5% error bars), and boiling for hydrogen and deuterium
252
** *Next steps:*
253
*** Check tracking efficiency
254 5 Richard Trotta
255 35 Stephen Kay
* *Global comments on Luminosity Scans (so far)*
256
** April 2018 scans show hydrogen and deuterium target boiling on level of 3-4%, Carbon is consistent with no boiling, as expected - based on description, new targets are expected to have less boiling than those used previously, e.g. in FPI2. Double check this.
257
** Efficiencies in report files need to be updated, e.g. CPU deadtime (Richard)
258
** Check if BCM4a is the one closest to the target - get a map of the hall (Richard, Ryan)
259
** Uncertainties on current
260
** Detector calibrations
261
** HMS vs. SHMS
262 1 Richard Trotta
263 35 Stephen Kay
* eK+ coincidence time from SIDIS Spring 2018 run (Samip)
264
** Worked with Mark Jones on coincidence time calculation - now available in hcana (see Samip's 10 May 2018 email for more details)
265
** runs used in this analysis: 3423 with Q2=3.1 GeV2 and W=2.78 GeV
266
** Coincidence time spectrum shows peak separations >2 ns corresponding to different accelerator frequency
267
** Missing mass spectra: Kaon peak clearly visible, also see pions even after cuts
268
** Found that pions appear localized in phase space - seems to be due to end point in kinematic phase space
269
** *Next steps:*
270
*** Look for a run with kaon momentum closer to 3 GeV/c (aerogel threshold is ~3 GeV/c for kaons for n=1.015)
271 2 Richard Trotta
272 35 Stephen Kay
* Yield normalized ratios from SIDIS (Hem)
273
** Yield ratios of data to MC match well in shape, but normalization seems not quite right
274
** *Next steps:*
275
*** Check if efficiencies, currents, run time etc. are taken into account correctly
276 4 Richard Trotta
277
----
278
279 35 Stephen Kay
h2. April 26, 2018
280 4 Richard Trotta
281 35 Stephen Kay
*Links to talks->* "Richard,":https://redmine.jlab.org/documents/18 "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/25
282 4 Richard Trotta
283 35 Stephen Kay
* Discussion luminosity scan analysis (earlier scan) - Richard
284
** Shown is a scaler-based analysis using scalers from report file and from ROOT tree - the values are different, why that is has to be checked
285
** Notes on efficiencies in report file:
286
*** DT (EDTM) is not electronic deadtime. Instead use for now 50ns* trigger rate for HMS and 100ns* trigger rate for SHMS
287
*** Cherenkov efficiency seems low (check if that is due to PID, thresholds, pi/e, etc)
288
*** Tracking efficiency needs to be checked
289
*** 3/4 trigger efficiency seems ok
290
* Discussion luminosity scan analysis (later scan) - Ryan
291
** Fewer carbon runs than earlier scan
292
** Shown is a tracking-based analysis using data from the ROOT trees
293
** First results for carbon, LH2, and LD2, but efficiencies need to be checked
294
* SIDIS analysis - Hem
295
** Shown is a data/MC comparison for different kinematic settings. Agreement in shape is very good. Normalization has yet to be applied.
296
** Discussion about agreement in z and apparent offset - relation of this offset with spectrometer offset
297
* Analysis of exclusive events in SIDIS - Samip
298
** Shown is a look at the first kaon events in exclusive limit of SIDIS data
299
** Ongoing work on implementing coincidence time into tree
300
* Discussion of run plan, and in particular possible low Q2/low energy
301
** Assume that kaon low Q2=0.4 already included - have kinematics with specified beam energies, if needed
302
** For pion form factor and LT, have two possible settings that can use the prescribed beam energies: Q2=1.45 and 0.35 GeV2 - prioritize towards the higher Q2 as not as sensitive to offsets
303
** Garth will put this together in a draft email
304
305 12 Richard Trotta
----
306
307 35 Stephen Kay
h2. March 29, 2018
308 12 Richard Trotta
309 35 Stephen Kay
*Links to talks->* "Richard, ":https://redmine.jlab.org/documents/16 "Samip":https://redmine.jlab.org/documents/27
310 13 Richard Trotta
311 35 Stephen Kay
* Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja)
312
* Luminosity scans (Ryan, Andres, Richard, Pete)
313
* Macros, SIDIS analysis (Hem, Anashe)
314
* Elastic data (TBD)
315
316 14 Richard Trotta
----
317 18 Richard Trotta
318 35 Stephen Kay
h2. February 22, 2018
319 18 Richard Trotta
320 35 Stephen Kay
*Links to talks->* "Andres":https://redmine.jlab.org/documents/19
321 18 Richard Trotta
322 35 Stephen Kay
*  Discussion of Andres' slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing.
323
* Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics
324
* Discussion of Richard's slides on run plan kinematics and preparations -
325
** everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics
326
** before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations
327
** for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group
328
** kinematics plots W-Q2 show that still need to do some optimization
329
** run sheets: include raster size, update coincidence count labeling, and carbon target labeling
330
* Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time.
331 26 Richard Trotta
332 35 Stephen Kay
* *Action Items:*
333
** Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja)
334
** Update run sheet and kinematic optimization for W/Q2 (Garth)
335
** Circulate elastic calculations for kinematic settings (Samip)
336
** Continue investigation of elastic data and run plan kinematics (Andres/Richard)
337
** Test software installation instructions (Pete)
338
** Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja) 
339 32 Stephen Kay