3
h1. *Kaon LT Meetings*
4
5 41 Stephen Kay
Kaon LT collaboration analysis meetings. Please add your talk to the meeting ahead of time. Add the newest meeting to the top of the list!
6
7 70 Richard Trotta
8
----
9
10
h2. Nov 19,2019
11
12
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
13
14
* Richard
15
** Finished up TDC cut paper going through the procedure (found "here":https://redmine.jlab.org/issues/500)
16
** Needed to add Carlos pre-trigger designs to an appendix for the paper which clarifies the introduction section
17
18
* Stephen
19
** Issues with DC calibration for only a few runs during each run period
20
** "wiggles" in HMS calorimeter calibrations for some runs
21
*** few runs where HMS cal totally failed (which was dependent on initial parameters)
22
*** Spring looked worse than the rest (surprisingly), but this may be because online calibration wasn't great
23
24 2 Richard Trotta
----
25
26 68 Richard Trotta
h2. Nov 5,2019
27
28
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500
29
30
* Timing update (Stephen)
31
** Reference times between Richard and Stephen are very similar and the GitHub is updated accordingly
32
** Richard is going to add the trigger time cuts once the fall runs are finished (by end of week)
33
** First pass of detector reference time parameter files finished
34
35
* Peter's hcana code (Richard and Stephen)
36
** Peter's code does not remove ghost bands (already known), but now Stephen is seeing a strang horizontal band for just SHMS hodoscope 2D plots
37
*** Richard has emailed Peter about the issue with no response yet (follow-up soon)
38
** This means we still need the reference time amplitude cut with Peter's code but using just the amplitude cut with Mark's latest version of hcana should be sufficient for calibrations.
39
40
* Calibrations were decided to be done once per shift
41
42
* Next meeting schedule...
43
** Small meetings Nov 12 and Nov 19 (at 3pm ET) so Richard and Stephen can iron out the timing and calibrations
44
** November 26 (at 3pm ET) will be a larger meeting. 
45
*** This is the rough deadline we made for finishing up calibrations. 
46
*** This should be sufficient for all detectors (although hodoscope and HG which may persist). The ultimate goal is for all calibrations to be finished up before Winter break!!
47
48
----
49
50 62 Richard Trotta
h2. Oct 22,2019
51
52 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
53 62 Richard Trotta
54 65 Richard Trotta
* SHMS Reference Time Amplitude Cuts(Stephen)
55
** Extra peaks in HG from cross-talk and "ghost-bands" due to ADC screw up
56
*** cuts applied on SHMS ADC ref time amplitude (greater than zero) done before any further event selection and histogram filling
57
** This is a temporary fix to "ghost-bands" and cross talk
58
*** Although for HG there is still a small peak. The hodoscope is fine.
59
** The time window is easier to set now.
60
** DC has been fine (since it uses TDC)
61
*** DC calibrations should be good to complete, other detectors need more fixes (i.e. the remaining "ghost-band")
62
** Hodoscope still bad but this might be because of that "ghost-band", needs to be further investigated
63
64
* Peter's hcana fixes for reference time (Richard)
65
** Peter implemented changes to hcana
66
** Two major issues...
67 67 Richard Trotta
## Amplitude goes to null and integral is low or negative which causes a rate-dependent efficiency. 
68
*** Peter has used the average pulse value acquired over a large sample of runs for each detector. 
69 1 Richard Trotta
## Timing offset between EL-REAL and 3/4 is 130 ns which causes junk tracks at high SHMS rates (~6% of the time)
70 67 Richard Trotta
*** Peter created a routine to find the best offset by means of matching TDC and ADC
71
** Richard has been checking for bugs in the code. 
72
*** It seems to be ready to implement, Richard emailed Peter for confirmation on the implementation in our group directory
73
74
* Calibration of HMS detectors when the timing is agreed upon by Stephen and Richard.
75
** Besides hodoscope which still has an issue with the script
76
** Stephen and Richard are having a meeting late next week to determine time window values
77
*** These will be relatively final, but on the wider side if adjustments need to be made in the future
78 65 Richard Trotta
79 62 Richard Trotta
-----
80
81 61 Richard Trotta
h2. Sep 24,2019
82
83 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
84 61 Richard Trotta
85
-----
86
87 59 Vijay Kumar
h2. Sep 10,2019
88 1 Richard Trotta
89 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/72 "Richard":https://redmine.jlab.org/issues/500
90 59 Vijay Kumar
91
-----
92 55 Stephen Kay
93 1 Richard Trotta
h2. August 26, 2019
94 55 Stephen Kay
95 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/70 "Vijay":https://redmine.jlab.org/documents/71 "Richard":https://redmine.jlab.org/issues/500
96 55 Stephen Kay
97
----
98
99 54 Richard Trotta
h2. June 21, 2019
100
101
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 
102
103
----
104
105 42 Stephen Kay
h2. June 14, 2019
106
107 53 Garth Huber
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/64 "Update-Mireille":https://redmine.jlab.org/documents/65 "Vijay":https://redmine.jlab.org/attachments/download/814/Analy_update3.pdf
108 52 Garth Huber
109 46 Richard Trotta
110 42 Stephen Kay
----
111
112 35 Stephen Kay
h2. June 4, 2019
113 1 Richard Trotta
114 40 Mireille Muhoza
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/56 "Nathan":https://redmine.jlab.org/documents/57 "Vijay":https://redmine.jlab.org/documents/58 "Richard":https://redmine.jlab.org/documents/59 "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/61
115 36 Vijay Kumar
116 1 Richard Trotta
117 35 Stephen Kay
----
118 1 Richard Trotta
119 35 Stephen Kay
h2. May 21, 2019
120 1 Richard Trotta
121 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/52 "Mireille":https://redmine.jlab.org/documents/? "Stephen":https://redmine.jlab.org/documents/53 "Nathan":https://redmine.jlab.org/documents/54 "Vijay":https://redmine.jlab.org/documents/55
122
123 1 Richard Trotta
----
124
125 35 Stephen Kay
h2. May 14, 2019
126 1 Richard Trotta
127 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/48 "Carlos' slides":https://redmine.jlab.org/documents/49 "Mireille":https://redmine.jlab.org/documents/50 "Stephen":https://redmine.jlab.org/documents/51
128 1 Richard Trotta
129
----
130
131 35 Stephen Kay
h2. April 30, 2019
132 1 Richard Trotta
133 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/45 "Richard's slides in wiki":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_How-To "Brad Computing":https://redmine.jlab.org/documents/46 "Stephen":https://redmine.jlab.org/documents/47
134 1 Richard Trotta
135
----
136
137 35 Stephen Kay
h2. February 4, 2019
138 1 Richard Trotta
139 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/43 "Stephen":https://redmine.jlab.org/documents/44
140 1 Richard Trotta
141 35 Stephen Kay
----
142 1 Richard Trotta
143 35 Stephen Kay
h2. August 21, 2018
144 1 Richard Trotta
145 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
146 1 Richard Trotta
147 35 Stephen Kay
----
148 1 Richard Trotta
149 35 Stephen Kay
h2. August 8, 2018
150 1 Richard Trotta
151 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
152
153 1 Richard Trotta
----
154
155 35 Stephen Kay
h2. August 3, 2018
156 1 Richard Trotta
157 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383
158
*Links to talks->*
159 1 Richard Trotta
160 35 Stephen Kay
----
161 1 Richard Trotta
162 35 Stephen Kay
h2. July 11, 2018
163 1 Richard Trotta
164 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #384
165 1 Richard Trotta
166 35 Stephen Kay
*Action items:*
167 1 Richard Trotta
168 35 Stephen Kay
* Update run plan, e.g. add prescales (Garth)
169
* Check on details of: magnet cycling procedure, minimum angles, MCC fringe field steering, beam energy measurements, optics checks (Tanja)
170
* Identify additional run coordinators (Tanja)
171
* Encourage collaborators to take shifts, e.g. FIU (Pete)
172
* Draft email about shifts etc. to collaboration (Tanja)
173
* Develop diagnostic scripts and kaonLT specific (Richard, Ryan)
174
* Continue documentation development, e.g. checklist, shift taker instructions, HowTo or link to generic Hall C HowTo, task list, web page (Richard, Garth)
175 1 Richard Trotta
176 35 Stephen Kay
*Discussions:*
177 1 Richard Trotta
178 35 Stephen Kay
* SHMS Aerogel Cherenkov: tray has been changed to SP-11 on 10 July, nominal time for change is 8 hours, one tray can stay in the hall to minimize overhead
179
* HGC: waiting for re-installation
180
* Trigger checkout: main items to keep in mind: fADC thresholds, timing HMS/SHMS - leading arm, possible rate limitations
181
* Shifts
182
* Diagnostics scripts and documentation
183
* Personnel schedules
184 1 Richard Trotta
185
----
186
187
h2. June 28, 2018
188
189
*Links to talks->* "Richard":https://redmine.jlab.org/documents/34
190
191
*Action Items:*
192
193
* Develop and post shift schedule. Send out request. Find out who is KAONLT liaison (Tanja)
194
* Contact potential run coordinators. (Tanja)
195
* Aerogel tray exchange for start of experiment and coordination of future exchanges (Vladimir)
196
* Update runplan and prepare documents needed for shift crew, e.g. run sheets (Garth)
197
* Set up a web page to collect and link from Redmine - How-To documents, initial calibrations, etc. (Garth, Richard)
198
* Adapt luminosity scan script to calculate kaon yields by run number for use during experiment by shift crew - has to be simple to use. (Richard)
199
* Develop trigger/detector checkout plan (Tanja, initial draft)
200
** Are all experts available at run start, experts needed: coincidence timing , Harp Scans, BCM calibrations, ...
201
* Find out from JLab what the anticipated settings are for limit switches for both spectrometers and for separation angle in between them. Also find out what magnet cycling procedure should be used for L/T quality separation data (Tanja)
202
* Find out if all aerogel trays needed for experiment can be stored inside Hall C to avoid having to open truck ramp (Vladimir)
203
204
*Analysis Updates:*
205
206
* Ryan 
207
** resolving differences between his analysis and Richard's
208
209
* Richard
210
** Discussed with Mark Jones and is cross checking his January luminosity scan analysis against Mark's. Realized that BCM calibrations (gains, offsets etc) are different - currently working on fixing that, presents current results - low curent point is ~10% below unity, discussion that this seems to indicate that BCM offsets are the issue as low current points would be most sensitive, is planning to also double-check the BCM calibration procedure - had discussion with Dave Mack at JLab
211
** Presents a script developed for luminosity scans that determines yields for a run number input on command line. Discussion this could be good to adapt for kaon counting during experiment.
212
213
----
214
215 35 Stephen Kay
h2. May 31, 2018
216 1 Richard Trotta
217 35 Stephen Kay
*Links to talks->* "Samip":https://redmine.jlab.org/documents/30
218 1 Richard Trotta
219 35 Stephen Kay
----
220 1 Richard Trotta
221 35 Stephen Kay
h2. May 17, 2018 
222 1 Richard Trotta
223 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/29, "Ryan":https://hallcweb.jlab.org/DocDB/0009/000968/001/Presentation.pdf, "Samip":https://redmine.jlab.org/documents/30
224 2 Richard Trotta
225 35 Stephen Kay
* Luminosity scans (Richard, Ryan)
226
** Carbon scan from April seems consistent with no boiling, LH2 and LD2 show deviation from unity, should check effect of EDTM events on efficiencies
227
** Carbon scans from January (low rates) have large deviations from unity, in particular behavior at higher currents (>40uA), e.g. cpu dead time, that is not yet understood
228
** discussion about pre-scale factors
229 1 Richard Trotta
230 35 Stephen Kay
* Discussion about Richard's script extracting and printing information from report files and trees including histograms
231
** Add option for looking at yields with cuts on cointime, target window, and missing mass
232
** Add option to look at real peak vs. background level
233 1 Richard Trotta
234 35 Stephen Kay
* H(e,e'p) kinematics investigation for fall run (Samip)
235
** Optimal range is between electron angles of 17-20 degrees, time required ranges from ~1 hour at 17 degrees to ~3 hour at 20 degrees, other angles may be of interest for disentangling charge and current dependent effects
236 1 Richard Trotta
237 35 Stephen Kay
* *Action Items*
238
** Luminosity scans at low rates from January (Richard)
239
** Luminosity scans from April with corrected efficiencies, e.d. DT (Ryan)
240
** H(e,e'p) and H(e,e') kinematics for upcoming Kaon LT run (Samip)
241
** Kaon LT detailed run plan (Garth, Pete, Tanja)
242
** Preparations, e.g. report files, diagnostic histograms and real time monitoring, shift worker instructions, optimization of trees (all)
243 1 Richard Trotta
244
----
245
246 35 Stephen Kay
h2. May 10, 2018
247 1 Richard Trotta
248 35 Stephen Kay
*Links to talks->* "Hem":https://redmine.jlab.org/documents/24, "Richard":https://redmine.jlab.org/documents/23, "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/26
249 2 Richard Trotta
250 35 Stephen Kay
* Luminosity Scans January 2018 (Richard)
251
** Tracking-based analysis for Runs 1415-1423, .. for now focus on HMS, typical HMS S1X rates are <
252
** Cuts applied: PID for electrons (Cer, Cal), acceptance (delta)
253
** Efficiency calculation was investigated in detail and applied using scalers from trees
254
** Results for carbon (normalized to 30uA) show large variation - need to understand
255
** *Next steps:*
256
*** Double check calculation of computer lifetime, look for differences in TRIG and PRETRIG scalers
257
*** Check stability of pre-scale (Ryan saw changes within runs)
258
*** Check if detector calibrations for runs are implemented correctly
259
*** Analyze with Ryan's cuts
260 1 Richard Trotta
261 35 Stephen Kay
* Luminosity Scans April 2018 (Ryan)
262
** Confirms Richard's earlier finding that scaler-based analysis is not reliable and that it's best to analyze event-by-event
263
** Tracking-based analysis for runs 2073-2095
264
** Cuts applied: PID for electrons (TOF, Cal, Chi2), acceptance (delta and angles), BCM4a
265
** Included most recent detector calibrations in replay of these runs
266
** Efficiencies from report file mainly, may need to update tracking efficiency implementation
267
** Found that calculations of computer deadtime requires different set of scalers for runs from January to those from April 2018
268
** Results show carbon yields consistent with unity within error (0.5% error bars), and boiling for hydrogen and deuterium
269
** *Next steps:*
270
*** Check tracking efficiency
271 5 Richard Trotta
272 35 Stephen Kay
* *Global comments on Luminosity Scans (so far)*
273
** April 2018 scans show hydrogen and deuterium target boiling on level of 3-4%, Carbon is consistent with no boiling, as expected - based on description, new targets are expected to have less boiling than those used previously, e.g. in FPI2. Double check this.
274
** Efficiencies in report files need to be updated, e.g. CPU deadtime (Richard)
275
** Check if BCM4a is the one closest to the target - get a map of the hall (Richard, Ryan)
276
** Uncertainties on current
277
** Detector calibrations
278
** HMS vs. SHMS
279 1 Richard Trotta
280 35 Stephen Kay
* eK+ coincidence time from SIDIS Spring 2018 run (Samip)
281
** Worked with Mark Jones on coincidence time calculation - now available in hcana (see Samip's 10 May 2018 email for more details)
282
** runs used in this analysis: 3423 with Q2=3.1 GeV2 and W=2.78 GeV
283
** Coincidence time spectrum shows peak separations >2 ns corresponding to different accelerator frequency
284
** Missing mass spectra: Kaon peak clearly visible, also see pions even after cuts
285
** Found that pions appear localized in phase space - seems to be due to end point in kinematic phase space
286
** *Next steps:*
287
*** Look for a run with kaon momentum closer to 3 GeV/c (aerogel threshold is ~3 GeV/c for kaons for n=1.015)
288 2 Richard Trotta
289 35 Stephen Kay
* Yield normalized ratios from SIDIS (Hem)
290
** Yield ratios of data to MC match well in shape, but normalization seems not quite right
291
** *Next steps:*
292
*** Check if efficiencies, currents, run time etc. are taken into account correctly
293 4 Richard Trotta
294
----
295
296 35 Stephen Kay
h2. April 26, 2018
297 4 Richard Trotta
298 35 Stephen Kay
*Links to talks->* "Richard,":https://redmine.jlab.org/documents/18 "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/25
299 4 Richard Trotta
300 35 Stephen Kay
* Discussion luminosity scan analysis (earlier scan) - Richard
301
** Shown is a scaler-based analysis using scalers from report file and from ROOT tree - the values are different, why that is has to be checked
302
** Notes on efficiencies in report file:
303
*** DT (EDTM) is not electronic deadtime. Instead use for now 50ns* trigger rate for HMS and 100ns* trigger rate for SHMS
304
*** Cherenkov efficiency seems low (check if that is due to PID, thresholds, pi/e, etc)
305
*** Tracking efficiency needs to be checked
306
*** 3/4 trigger efficiency seems ok
307
* Discussion luminosity scan analysis (later scan) - Ryan
308
** Fewer carbon runs than earlier scan
309
** Shown is a tracking-based analysis using data from the ROOT trees
310
** First results for carbon, LH2, and LD2, but efficiencies need to be checked
311
* SIDIS analysis - Hem
312
** Shown is a data/MC comparison for different kinematic settings. Agreement in shape is very good. Normalization has yet to be applied.
313
** Discussion about agreement in z and apparent offset - relation of this offset with spectrometer offset
314
* Analysis of exclusive events in SIDIS - Samip
315
** Shown is a look at the first kaon events in exclusive limit of SIDIS data
316
** Ongoing work on implementing coincidence time into tree
317
* Discussion of run plan, and in particular possible low Q2/low energy
318
** Assume that kaon low Q2=0.4 already included - have kinematics with specified beam energies, if needed
319
** For pion form factor and LT, have two possible settings that can use the prescribed beam energies: Q2=1.45 and 0.35 GeV2 - prioritize towards the higher Q2 as not as sensitive to offsets
320
** Garth will put this together in a draft email
321
322 12 Richard Trotta
----
323
324 35 Stephen Kay
h2. March 29, 2018
325 12 Richard Trotta
326 35 Stephen Kay
*Links to talks->* "Richard, ":https://redmine.jlab.org/documents/16 "Samip":https://redmine.jlab.org/documents/27
327 13 Richard Trotta
328 35 Stephen Kay
* Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja)
329
* Luminosity scans (Ryan, Andres, Richard, Pete)
330
* Macros, SIDIS analysis (Hem, Anashe)
331
* Elastic data (TBD)
332
333 14 Richard Trotta
----
334 18 Richard Trotta
335 35 Stephen Kay
h2. February 22, 2018
336 18 Richard Trotta
337 35 Stephen Kay
*Links to talks->* "Andres":https://redmine.jlab.org/documents/19
338 18 Richard Trotta
339 35 Stephen Kay
*  Discussion of Andres' slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing.
340
* Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics
341
* Discussion of Richard's slides on run plan kinematics and preparations -
342
** everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics
343
** before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations
344
** for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group
345
** kinematics plots W-Q2 show that still need to do some optimization
346
** run sheets: include raster size, update coincidence count labeling, and carbon target labeling
347
* Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time.
348 26 Richard Trotta
349 35 Stephen Kay
* *Action Items:*
350
** Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja)
351
** Update run sheet and kinematic optimization for W/Q2 (Garth)
352
** Circulate elastic calculations for kinematic settings (Samip)
353
** Continue investigation of elastic data and run plan kinematics (Andres/Richard)
354
** Test software installation instructions (Pete)
355
** Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja) 
356 32 Stephen Kay
357
----