Project

General

Profile

Kaon LT Meetings » History » Version 74

Richard Trotta, 12/11/2019 03:14 PM

1 1 Richard Trotta
{{>toc}}
2
3
h1. *Kaon LT Meetings*
4
5 41 Stephen Kay
Kaon LT collaboration analysis meetings. Please add your talk to the meeting ahead of time. Add the newest meeting to the top of the list!
6
7 72 Richard Trotta
h2. Dec 10,2019
8
9 73 Richard Trotta
*Links to talks->* "Richard":https://redmine.jlab.org/documents/73
10 72 Richard Trotta
11 71 Richard Trotta
----
12
13 74 Richard Trotta
* Garth and Stephen were in the most recent SIDIS meeting
14
** Wit had lots of hcana changes but they seem to be critical to our work 
15
*** Changes such as new detector classes
16
** Hopefully Wit will present these in the next commissioning meeting
17
18
* Stephen improved wiggles but still prevelent
19
20
* Richard finished HGCer calibrations, he concluded that the online parameters are sufficient
21
** He also has been looking at SHMS calorimeter calibrations but has had issues running the scripts. Most likely a pathing issue.
22
** The "tasks":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_Tasks page has been updated with a section for efficiencies. 
23
*** A PID efficiency script is currently being developed and hopefully should have some plots for our next meeting.
24
25
* Next meeting will be December 17th at 3 pm ET.
26
27
28 71 Richard Trotta
h2. Nov 26,2019
29
30
*Links to talks->* "Richard":https://redmine.jlab.org/issues/480
31
32
* Stephen
33
** DC SHMS, small-angle has poor performance
34
*** Tighter cuts or PID (currently only looks for electrons)
35
** Vardan said calorimeter wiggles are an ongoing issue with no current solution
36
37
* Richard
38
** The calibrations are nearing completion with only the HG Cherenkov and SHMS calorimeter yet to be finished. There are also smaller issues with some DC and HMS calorimeter runs.
39
*** Richard will pick up looking at the HGCer calibrations from Vijay's scripts. 
40
*** Richard will also be looking at the SHMS calorimeter and with the suggestion of getting some negatively polarized SHMS runs from Hem.
41
** The HMS Cherenkov is finished with the conclusion that the calibrations from the online runs are good
42
** We can begin looking forward towards efficiencies. 
43
*** Garth suggested that looking at PID may be an advantageous first steps. Precise definitions of these PIDs will need to be logged.
44
*** Clear notes on efficiencies steps will be needed. They will need to be redefined multiple times in multiple ways. 
45
46
* Hem
47
** Has been looking at the calorimeter as well. 
48
** He has seen the second band in the spectra for some runs, we suggested further looks into HMS hodoscope and subsequently reference times. A recalibration will need to be performed.  
49 70 Richard Trotta
50
----
51
52
h2. Nov 19,2019
53
54
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
55
56
* Richard
57
** Finished up TDC cut paper going through the procedure (found "here":https://redmine.jlab.org/issues/500)
58
** Needed to add Carlos pre-trigger designs to an appendix for the paper which clarifies the introduction section
59
60
* Stephen
61
** Issues with DC calibration for only a few runs during each run period
62
** "wiggles" in HMS calorimeter calibrations for some runs
63
*** few runs where HMS cal totally failed (which was dependent on initial parameters)
64
*** Spring looked worse than the rest (surprisingly), but this may be because online calibration wasn't great
65
66 2 Richard Trotta
----
67
68 68 Richard Trotta
h2. Nov 5,2019
69
70
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500
71
72
* Timing update (Stephen)
73
** Reference times between Richard and Stephen are very similar and the GitHub is updated accordingly
74
** Richard is going to add the trigger time cuts once the fall runs are finished (by end of week)
75
** First pass of detector reference time parameter files finished
76
77
* Peter's hcana code (Richard and Stephen)
78
** Peter's code does not remove ghost bands (already known), but now Stephen is seeing a strang horizontal band for just SHMS hodoscope 2D plots
79
*** Richard has emailed Peter about the issue with no response yet (follow-up soon)
80
** This means we still need the reference time amplitude cut with Peter's code but using just the amplitude cut with Mark's latest version of hcana should be sufficient for calibrations.
81
82
* Calibrations were decided to be done once per shift
83
84
* Next meeting schedule...
85
** Small meetings Nov 12 and Nov 19 (at 3pm ET) so Richard and Stephen can iron out the timing and calibrations
86
** November 26 (at 3pm ET) will be a larger meeting. 
87
*** This is the rough deadline we made for finishing up calibrations. 
88
*** This should be sufficient for all detectors (although hodoscope and HG which may persist). The ultimate goal is for all calibrations to be finished up before Winter break!!
89
90
----
91
92 62 Richard Trotta
h2. Oct 22,2019
93
94 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
95 62 Richard Trotta
96 65 Richard Trotta
* SHMS Reference Time Amplitude Cuts(Stephen)
97
** Extra peaks in HG from cross-talk and "ghost-bands" due to ADC screw up
98
*** cuts applied on SHMS ADC ref time amplitude (greater than zero) done before any further event selection and histogram filling
99
** This is a temporary fix to "ghost-bands" and cross talk
100
*** Although for HG there is still a small peak. The hodoscope is fine.
101
** The time window is easier to set now.
102
** DC has been fine (since it uses TDC)
103
*** DC calibrations should be good to complete, other detectors need more fixes (i.e. the remaining "ghost-band")
104
** Hodoscope still bad but this might be because of that "ghost-band", needs to be further investigated
105
106
* Peter's hcana fixes for reference time (Richard)
107
** Peter implemented changes to hcana
108
** Two major issues...
109 67 Richard Trotta
## Amplitude goes to null and integral is low or negative which causes a rate-dependent efficiency. 
110
*** Peter has used the average pulse value acquired over a large sample of runs for each detector. 
111 1 Richard Trotta
## Timing offset between EL-REAL and 3/4 is 130 ns which causes junk tracks at high SHMS rates (~6% of the time)
112 67 Richard Trotta
*** Peter created a routine to find the best offset by means of matching TDC and ADC
113
** Richard has been checking for bugs in the code. 
114
*** It seems to be ready to implement, Richard emailed Peter for confirmation on the implementation in our group directory
115
116
* Calibration of HMS detectors when the timing is agreed upon by Stephen and Richard.
117
** Besides hodoscope which still has an issue with the script
118
** Stephen and Richard are having a meeting late next week to determine time window values
119
*** These will be relatively final, but on the wider side if adjustments need to be made in the future
120 65 Richard Trotta
121 62 Richard Trotta
-----
122
123 61 Richard Trotta
h2. Sep 24,2019
124
125 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
126 61 Richard Trotta
127
-----
128
129 59 Vijay Kumar
h2. Sep 10,2019
130 1 Richard Trotta
131 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/72 "Richard":https://redmine.jlab.org/issues/500
132 59 Vijay Kumar
133
-----
134 55 Stephen Kay
135 1 Richard Trotta
h2. August 26, 2019
136 55 Stephen Kay
137 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/70 "Vijay":https://redmine.jlab.org/documents/71 "Richard":https://redmine.jlab.org/issues/500
138 55 Stephen Kay
139
----
140
141 54 Richard Trotta
h2. June 21, 2019
142
143
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 
144
145
----
146
147 42 Stephen Kay
h2. June 14, 2019
148
149 53 Garth Huber
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/64 "Update-Mireille":https://redmine.jlab.org/documents/65 "Vijay":https://redmine.jlab.org/attachments/download/814/Analy_update3.pdf
150 52 Garth Huber
151 46 Richard Trotta
152 42 Stephen Kay
----
153
154 35 Stephen Kay
h2. June 4, 2019
155 1 Richard Trotta
156 40 Mireille Muhoza
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/56 "Nathan":https://redmine.jlab.org/documents/57 "Vijay":https://redmine.jlab.org/documents/58 "Richard":https://redmine.jlab.org/documents/59 "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/61
157 36 Vijay Kumar
158 1 Richard Trotta
159 35 Stephen Kay
----
160 1 Richard Trotta
161 35 Stephen Kay
h2. May 21, 2019
162 1 Richard Trotta
163 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/52 "Mireille":https://redmine.jlab.org/documents/? "Stephen":https://redmine.jlab.org/documents/53 "Nathan":https://redmine.jlab.org/documents/54 "Vijay":https://redmine.jlab.org/documents/55
164
165 1 Richard Trotta
----
166
167 35 Stephen Kay
h2. May 14, 2019
168 1 Richard Trotta
169 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/48 "Carlos' slides":https://redmine.jlab.org/documents/49 "Mireille":https://redmine.jlab.org/documents/50 "Stephen":https://redmine.jlab.org/documents/51
170 1 Richard Trotta
171
----
172
173 35 Stephen Kay
h2. April 30, 2019
174 1 Richard Trotta
175 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/45 "Richard's slides in wiki":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_How-To "Brad Computing":https://redmine.jlab.org/documents/46 "Stephen":https://redmine.jlab.org/documents/47
176 1 Richard Trotta
177
----
178
179 35 Stephen Kay
h2. February 4, 2019
180 1 Richard Trotta
181 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/43 "Stephen":https://redmine.jlab.org/documents/44
182 1 Richard Trotta
183 35 Stephen Kay
----
184 1 Richard Trotta
185 35 Stephen Kay
h2. August 21, 2018
186 1 Richard Trotta
187 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
188 1 Richard Trotta
189 35 Stephen Kay
----
190 1 Richard Trotta
191 35 Stephen Kay
h2. August 8, 2018
192 1 Richard Trotta
193 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
194
195 1 Richard Trotta
----
196
197 35 Stephen Kay
h2. August 3, 2018
198 1 Richard Trotta
199 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383
200
*Links to talks->*
201 1 Richard Trotta
202 35 Stephen Kay
----
203 1 Richard Trotta
204 35 Stephen Kay
h2. July 11, 2018
205 1 Richard Trotta
206 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #384
207 1 Richard Trotta
208 35 Stephen Kay
*Action items:*
209 1 Richard Trotta
210 35 Stephen Kay
* Update run plan, e.g. add prescales (Garth)
211
* Check on details of: magnet cycling procedure, minimum angles, MCC fringe field steering, beam energy measurements, optics checks (Tanja)
212
* Identify additional run coordinators (Tanja)
213
* Encourage collaborators to take shifts, e.g. FIU (Pete)
214
* Draft email about shifts etc. to collaboration (Tanja)
215
* Develop diagnostic scripts and kaonLT specific (Richard, Ryan)
216
* Continue documentation development, e.g. checklist, shift taker instructions, HowTo or link to generic Hall C HowTo, task list, web page (Richard, Garth)
217 1 Richard Trotta
218 35 Stephen Kay
*Discussions:*
219 1 Richard Trotta
220 35 Stephen Kay
* SHMS Aerogel Cherenkov: tray has been changed to SP-11 on 10 July, nominal time for change is 8 hours, one tray can stay in the hall to minimize overhead
221
* HGC: waiting for re-installation
222
* Trigger checkout: main items to keep in mind: fADC thresholds, timing HMS/SHMS - leading arm, possible rate limitations
223
* Shifts
224
* Diagnostics scripts and documentation
225
* Personnel schedules
226 1 Richard Trotta
227
----
228
229
h2. June 28, 2018
230
231
*Links to talks->* "Richard":https://redmine.jlab.org/documents/34
232
233
*Action Items:*
234
235
* Develop and post shift schedule. Send out request. Find out who is KAONLT liaison (Tanja)
236
* Contact potential run coordinators. (Tanja)
237
* Aerogel tray exchange for start of experiment and coordination of future exchanges (Vladimir)
238
* Update runplan and prepare documents needed for shift crew, e.g. run sheets (Garth)
239
* Set up a web page to collect and link from Redmine - How-To documents, initial calibrations, etc. (Garth, Richard)
240
* Adapt luminosity scan script to calculate kaon yields by run number for use during experiment by shift crew - has to be simple to use. (Richard)
241
* Develop trigger/detector checkout plan (Tanja, initial draft)
242
** Are all experts available at run start, experts needed: coincidence timing , Harp Scans, BCM calibrations, ...
243
* Find out from JLab what the anticipated settings are for limit switches for both spectrometers and for separation angle in between them. Also find out what magnet cycling procedure should be used for L/T quality separation data (Tanja)
244
* Find out if all aerogel trays needed for experiment can be stored inside Hall C to avoid having to open truck ramp (Vladimir)
245
246
*Analysis Updates:*
247
248
* Ryan 
249
** resolving differences between his analysis and Richard's
250
251
* Richard
252
** Discussed with Mark Jones and is cross checking his January luminosity scan analysis against Mark's. Realized that BCM calibrations (gains, offsets etc) are different - currently working on fixing that, presents current results - low curent point is ~10% below unity, discussion that this seems to indicate that BCM offsets are the issue as low current points would be most sensitive, is planning to also double-check the BCM calibration procedure - had discussion with Dave Mack at JLab
253
** Presents a script developed for luminosity scans that determines yields for a run number input on command line. Discussion this could be good to adapt for kaon counting during experiment.
254
255
----
256
257 35 Stephen Kay
h2. May 31, 2018
258 1 Richard Trotta
259 35 Stephen Kay
*Links to talks->* "Samip":https://redmine.jlab.org/documents/30
260 1 Richard Trotta
261 35 Stephen Kay
----
262 1 Richard Trotta
263 35 Stephen Kay
h2. May 17, 2018 
264 1 Richard Trotta
265 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/29, "Ryan":https://hallcweb.jlab.org/DocDB/0009/000968/001/Presentation.pdf, "Samip":https://redmine.jlab.org/documents/30
266 2 Richard Trotta
267 35 Stephen Kay
* Luminosity scans (Richard, Ryan)
268
** Carbon scan from April seems consistent with no boiling, LH2 and LD2 show deviation from unity, should check effect of EDTM events on efficiencies
269
** Carbon scans from January (low rates) have large deviations from unity, in particular behavior at higher currents (>40uA), e.g. cpu dead time, that is not yet understood
270
** discussion about pre-scale factors
271 1 Richard Trotta
272 35 Stephen Kay
* Discussion about Richard's script extracting and printing information from report files and trees including histograms
273
** Add option for looking at yields with cuts on cointime, target window, and missing mass
274
** Add option to look at real peak vs. background level
275 1 Richard Trotta
276 35 Stephen Kay
* H(e,e'p) kinematics investigation for fall run (Samip)
277
** Optimal range is between electron angles of 17-20 degrees, time required ranges from ~1 hour at 17 degrees to ~3 hour at 20 degrees, other angles may be of interest for disentangling charge and current dependent effects
278 1 Richard Trotta
279 35 Stephen Kay
* *Action Items*
280
** Luminosity scans at low rates from January (Richard)
281
** Luminosity scans from April with corrected efficiencies, e.d. DT (Ryan)
282
** H(e,e'p) and H(e,e') kinematics for upcoming Kaon LT run (Samip)
283
** Kaon LT detailed run plan (Garth, Pete, Tanja)
284
** Preparations, e.g. report files, diagnostic histograms and real time monitoring, shift worker instructions, optimization of trees (all)
285 1 Richard Trotta
286
----
287
288 35 Stephen Kay
h2. May 10, 2018
289 1 Richard Trotta
290 35 Stephen Kay
*Links to talks->* "Hem":https://redmine.jlab.org/documents/24, "Richard":https://redmine.jlab.org/documents/23, "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/26
291 2 Richard Trotta
292 35 Stephen Kay
* Luminosity Scans January 2018 (Richard)
293
** Tracking-based analysis for Runs 1415-1423, .. for now focus on HMS, typical HMS S1X rates are <
294
** Cuts applied: PID for electrons (Cer, Cal), acceptance (delta)
295
** Efficiency calculation was investigated in detail and applied using scalers from trees
296
** Results for carbon (normalized to 30uA) show large variation - need to understand
297
** *Next steps:*
298
*** Double check calculation of computer lifetime, look for differences in TRIG and PRETRIG scalers
299
*** Check stability of pre-scale (Ryan saw changes within runs)
300
*** Check if detector calibrations for runs are implemented correctly
301
*** Analyze with Ryan's cuts
302 1 Richard Trotta
303 35 Stephen Kay
* Luminosity Scans April 2018 (Ryan)
304
** Confirms Richard's earlier finding that scaler-based analysis is not reliable and that it's best to analyze event-by-event
305
** Tracking-based analysis for runs 2073-2095
306
** Cuts applied: PID for electrons (TOF, Cal, Chi2), acceptance (delta and angles), BCM4a
307
** Included most recent detector calibrations in replay of these runs
308
** Efficiencies from report file mainly, may need to update tracking efficiency implementation
309
** Found that calculations of computer deadtime requires different set of scalers for runs from January to those from April 2018
310
** Results show carbon yields consistent with unity within error (0.5% error bars), and boiling for hydrogen and deuterium
311
** *Next steps:*
312
*** Check tracking efficiency
313 5 Richard Trotta
314 35 Stephen Kay
* *Global comments on Luminosity Scans (so far)*
315
** April 2018 scans show hydrogen and deuterium target boiling on level of 3-4%, Carbon is consistent with no boiling, as expected - based on description, new targets are expected to have less boiling than those used previously, e.g. in FPI2. Double check this.
316
** Efficiencies in report files need to be updated, e.g. CPU deadtime (Richard)
317
** Check if BCM4a is the one closest to the target - get a map of the hall (Richard, Ryan)
318
** Uncertainties on current
319
** Detector calibrations
320
** HMS vs. SHMS
321 1 Richard Trotta
322 35 Stephen Kay
* eK+ coincidence time from SIDIS Spring 2018 run (Samip)
323
** Worked with Mark Jones on coincidence time calculation - now available in hcana (see Samip's 10 May 2018 email for more details)
324
** runs used in this analysis: 3423 with Q2=3.1 GeV2 and W=2.78 GeV
325
** Coincidence time spectrum shows peak separations >2 ns corresponding to different accelerator frequency
326
** Missing mass spectra: Kaon peak clearly visible, also see pions even after cuts
327
** Found that pions appear localized in phase space - seems to be due to end point in kinematic phase space
328
** *Next steps:*
329
*** Look for a run with kaon momentum closer to 3 GeV/c (aerogel threshold is ~3 GeV/c for kaons for n=1.015)
330 2 Richard Trotta
331 35 Stephen Kay
* Yield normalized ratios from SIDIS (Hem)
332
** Yield ratios of data to MC match well in shape, but normalization seems not quite right
333
** *Next steps:*
334
*** Check if efficiencies, currents, run time etc. are taken into account correctly
335 4 Richard Trotta
336
----
337
338 35 Stephen Kay
h2. April 26, 2018
339 4 Richard Trotta
340 35 Stephen Kay
*Links to talks->* "Richard,":https://redmine.jlab.org/documents/18 "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/25
341 4 Richard Trotta
342 35 Stephen Kay
* Discussion luminosity scan analysis (earlier scan) - Richard
343
** Shown is a scaler-based analysis using scalers from report file and from ROOT tree - the values are different, why that is has to be checked
344
** Notes on efficiencies in report file:
345
*** DT (EDTM) is not electronic deadtime. Instead use for now 50ns* trigger rate for HMS and 100ns* trigger rate for SHMS
346
*** Cherenkov efficiency seems low (check if that is due to PID, thresholds, pi/e, etc)
347
*** Tracking efficiency needs to be checked
348
*** 3/4 trigger efficiency seems ok
349
* Discussion luminosity scan analysis (later scan) - Ryan
350
** Fewer carbon runs than earlier scan
351
** Shown is a tracking-based analysis using data from the ROOT trees
352
** First results for carbon, LH2, and LD2, but efficiencies need to be checked
353
* SIDIS analysis - Hem
354
** Shown is a data/MC comparison for different kinematic settings. Agreement in shape is very good. Normalization has yet to be applied.
355
** Discussion about agreement in z and apparent offset - relation of this offset with spectrometer offset
356
* Analysis of exclusive events in SIDIS - Samip
357
** Shown is a look at the first kaon events in exclusive limit of SIDIS data
358
** Ongoing work on implementing coincidence time into tree
359
* Discussion of run plan, and in particular possible low Q2/low energy
360
** Assume that kaon low Q2=0.4 already included - have kinematics with specified beam energies, if needed
361
** For pion form factor and LT, have two possible settings that can use the prescribed beam energies: Q2=1.45 and 0.35 GeV2 - prioritize towards the higher Q2 as not as sensitive to offsets
362
** Garth will put this together in a draft email
363
364 12 Richard Trotta
----
365
366 35 Stephen Kay
h2. March 29, 2018
367 12 Richard Trotta
368 35 Stephen Kay
*Links to talks->* "Richard, ":https://redmine.jlab.org/documents/16 "Samip":https://redmine.jlab.org/documents/27
369 13 Richard Trotta
370 35 Stephen Kay
* Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja)
371
* Luminosity scans (Ryan, Andres, Richard, Pete)
372
* Macros, SIDIS analysis (Hem, Anashe)
373
* Elastic data (TBD)
374
375 14 Richard Trotta
----
376 18 Richard Trotta
377 35 Stephen Kay
h2. February 22, 2018
378 18 Richard Trotta
379 35 Stephen Kay
*Links to talks->* "Andres":https://redmine.jlab.org/documents/19
380 18 Richard Trotta
381 35 Stephen Kay
*  Discussion of Andres' slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing.
382
* Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics
383
* Discussion of Richard's slides on run plan kinematics and preparations -
384
** everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics
385
** before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations
386
** for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group
387
** kinematics plots W-Q2 show that still need to do some optimization
388
** run sheets: include raster size, update coincidence count labeling, and carbon target labeling
389
* Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time.
390 26 Richard Trotta
391 35 Stephen Kay
* *Action Items:*
392
** Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja)
393
** Update run sheet and kinematic optimization for W/Q2 (Garth)
394
** Circulate elastic calculations for kinematic settings (Samip)
395
** Continue investigation of elastic data and run plan kinematics (Andres/Richard)
396
** Test software installation instructions (Pete)
397
** Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja) 
398 32 Stephen Kay
399
----