Project

General

Profile

Kaon LT Meetings » History » Version 76

Richard Trotta, 12/11/2019 03:15 PM

1 1 Richard Trotta
{{>toc}}
2
3
h1. *Kaon LT Meetings*
4
5 41 Stephen Kay
Kaon LT collaboration analysis meetings. Please add your talk to the meeting ahead of time. Add the newest meeting to the top of the list!
6
7 72 Richard Trotta
h2. Dec 10,2019
8
9 73 Richard Trotta
*Links to talks->* "Richard":https://redmine.jlab.org/documents/73
10 72 Richard Trotta
11 74 Richard Trotta
* Garth and Stephen were in the most recent SIDIS meeting
12
** Wit had lots of hcana changes but they seem to be critical to our work 
13
*** Changes such as new detector classes
14
** Hopefully Wit will present these in the next commissioning meeting
15
16
* Stephen improved wiggles but still prevelent
17
18
* Richard finished HGCer calibrations, he concluded that the online parameters are sufficient
19
** He also has been looking at SHMS calorimeter calibrations but has had issues running the scripts. Most likely a pathing issue.
20
** The "tasks":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_Tasks page has been updated with a section for efficiencies. 
21
*** A PID efficiency script is currently being developed and hopefully should have some plots for our next meeting.
22
23 1 Richard Trotta
* Next meeting will be December 17th at 3 pm ET.
24 74 Richard Trotta
25 75 Richard Trotta
----
26 74 Richard Trotta
27 71 Richard Trotta
h2. Nov 26,2019
28
29
*Links to talks->* "Richard":https://redmine.jlab.org/issues/480
30
31
* Stephen
32
** DC SHMS, small-angle has poor performance
33
*** Tighter cuts or PID (currently only looks for electrons)
34
** Vardan said calorimeter wiggles are an ongoing issue with no current solution
35
36
* Richard
37
** The calibrations are nearing completion with only the HG Cherenkov and SHMS calorimeter yet to be finished. There are also smaller issues with some DC and HMS calorimeter runs.
38
*** Richard will pick up looking at the HGCer calibrations from Vijay's scripts. 
39
*** Richard will also be looking at the SHMS calorimeter and with the suggestion of getting some negatively polarized SHMS runs from Hem.
40
** The HMS Cherenkov is finished with the conclusion that the calibrations from the online runs are good
41
** We can begin looking forward towards efficiencies. 
42
*** Garth suggested that looking at PID may be an advantageous first steps. Precise definitions of these PIDs will need to be logged.
43
*** Clear notes on efficiencies steps will be needed. They will need to be redefined multiple times in multiple ways. 
44
45
* Hem
46
** Has been looking at the calorimeter as well. 
47
** He has seen the second band in the spectra for some runs, we suggested further looks into HMS hodoscope and subsequently reference times. A recalibration will need to be performed.  
48 70 Richard Trotta
49
----
50
51
h2. Nov 19,2019
52
53
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
54
55
* Richard
56
** Finished up TDC cut paper going through the procedure (found "here":https://redmine.jlab.org/issues/500)
57
** Needed to add Carlos pre-trigger designs to an appendix for the paper which clarifies the introduction section
58
59
* Stephen
60
** Issues with DC calibration for only a few runs during each run period
61
** "wiggles" in HMS calorimeter calibrations for some runs
62
*** few runs where HMS cal totally failed (which was dependent on initial parameters)
63
*** Spring looked worse than the rest (surprisingly), but this may be because online calibration wasn't great
64
65 2 Richard Trotta
----
66
67 68 Richard Trotta
h2. Nov 5,2019
68
69
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500
70
71
* Timing update (Stephen)
72
** Reference times between Richard and Stephen are very similar and the GitHub is updated accordingly
73
** Richard is going to add the trigger time cuts once the fall runs are finished (by end of week)
74
** First pass of detector reference time parameter files finished
75
76
* Peter's hcana code (Richard and Stephen)
77
** Peter's code does not remove ghost bands (already known), but now Stephen is seeing a strang horizontal band for just SHMS hodoscope 2D plots
78
*** Richard has emailed Peter about the issue with no response yet (follow-up soon)
79
** This means we still need the reference time amplitude cut with Peter's code but using just the amplitude cut with Mark's latest version of hcana should be sufficient for calibrations.
80
81
* Calibrations were decided to be done once per shift
82
83
* Next meeting schedule...
84
** Small meetings Nov 12 and Nov 19 (at 3pm ET) so Richard and Stephen can iron out the timing and calibrations
85
** November 26 (at 3pm ET) will be a larger meeting. 
86
*** This is the rough deadline we made for finishing up calibrations. 
87
*** This should be sufficient for all detectors (although hodoscope and HG which may persist). The ultimate goal is for all calibrations to be finished up before Winter break!!
88
89
----
90
91 62 Richard Trotta
h2. Oct 22,2019
92
93 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
94 62 Richard Trotta
95 65 Richard Trotta
* SHMS Reference Time Amplitude Cuts(Stephen)
96
** Extra peaks in HG from cross-talk and "ghost-bands" due to ADC screw up
97
*** cuts applied on SHMS ADC ref time amplitude (greater than zero) done before any further event selection and histogram filling
98
** This is a temporary fix to "ghost-bands" and cross talk
99
*** Although for HG there is still a small peak. The hodoscope is fine.
100
** The time window is easier to set now.
101
** DC has been fine (since it uses TDC)
102
*** DC calibrations should be good to complete, other detectors need more fixes (i.e. the remaining "ghost-band")
103
** Hodoscope still bad but this might be because of that "ghost-band", needs to be further investigated
104
105
* Peter's hcana fixes for reference time (Richard)
106
** Peter implemented changes to hcana
107
** Two major issues...
108 67 Richard Trotta
## Amplitude goes to null and integral is low or negative which causes a rate-dependent efficiency. 
109
*** Peter has used the average pulse value acquired over a large sample of runs for each detector. 
110 1 Richard Trotta
## Timing offset between EL-REAL and 3/4 is 130 ns which causes junk tracks at high SHMS rates (~6% of the time)
111 67 Richard Trotta
*** Peter created a routine to find the best offset by means of matching TDC and ADC
112
** Richard has been checking for bugs in the code. 
113
*** It seems to be ready to implement, Richard emailed Peter for confirmation on the implementation in our group directory
114
115
* Calibration of HMS detectors when the timing is agreed upon by Stephen and Richard.
116
** Besides hodoscope which still has an issue with the script
117
** Stephen and Richard are having a meeting late next week to determine time window values
118
*** These will be relatively final, but on the wider side if adjustments need to be made in the future
119 65 Richard Trotta
120 62 Richard Trotta
-----
121
122 61 Richard Trotta
h2. Sep 24,2019
123
124 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
125 61 Richard Trotta
126
-----
127
128 59 Vijay Kumar
h2. Sep 10,2019
129 1 Richard Trotta
130 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/72 "Richard":https://redmine.jlab.org/issues/500
131 59 Vijay Kumar
132
-----
133 55 Stephen Kay
134 1 Richard Trotta
h2. August 26, 2019
135 55 Stephen Kay
136 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/70 "Vijay":https://redmine.jlab.org/documents/71 "Richard":https://redmine.jlab.org/issues/500
137 55 Stephen Kay
138
----
139
140 54 Richard Trotta
h2. June 21, 2019
141
142
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 
143
144
----
145
146 42 Stephen Kay
h2. June 14, 2019
147
148 53 Garth Huber
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/64 "Update-Mireille":https://redmine.jlab.org/documents/65 "Vijay":https://redmine.jlab.org/attachments/download/814/Analy_update3.pdf
149 52 Garth Huber
150 46 Richard Trotta
151 42 Stephen Kay
----
152
153 35 Stephen Kay
h2. June 4, 2019
154 1 Richard Trotta
155 40 Mireille Muhoza
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/56 "Nathan":https://redmine.jlab.org/documents/57 "Vijay":https://redmine.jlab.org/documents/58 "Richard":https://redmine.jlab.org/documents/59 "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/61
156 36 Vijay Kumar
157 1 Richard Trotta
158 35 Stephen Kay
----
159 1 Richard Trotta
160 35 Stephen Kay
h2. May 21, 2019
161 1 Richard Trotta
162 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/52 "Mireille":https://redmine.jlab.org/documents/? "Stephen":https://redmine.jlab.org/documents/53 "Nathan":https://redmine.jlab.org/documents/54 "Vijay":https://redmine.jlab.org/documents/55
163
164 1 Richard Trotta
----
165
166 35 Stephen Kay
h2. May 14, 2019
167 1 Richard Trotta
168 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/48 "Carlos' slides":https://redmine.jlab.org/documents/49 "Mireille":https://redmine.jlab.org/documents/50 "Stephen":https://redmine.jlab.org/documents/51
169 1 Richard Trotta
170
----
171
172 35 Stephen Kay
h2. April 30, 2019
173 1 Richard Trotta
174 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/45 "Richard's slides in wiki":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_How-To "Brad Computing":https://redmine.jlab.org/documents/46 "Stephen":https://redmine.jlab.org/documents/47
175 1 Richard Trotta
176
----
177
178 35 Stephen Kay
h2. February 4, 2019
179 1 Richard Trotta
180 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/43 "Stephen":https://redmine.jlab.org/documents/44
181 1 Richard Trotta
182 35 Stephen Kay
----
183 1 Richard Trotta
184 35 Stephen Kay
h2. August 21, 2018
185 1 Richard Trotta
186 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
187 1 Richard Trotta
188 35 Stephen Kay
----
189 1 Richard Trotta
190 35 Stephen Kay
h2. August 8, 2018
191 1 Richard Trotta
192 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
193
194 1 Richard Trotta
----
195
196 35 Stephen Kay
h2. August 3, 2018
197 1 Richard Trotta
198 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383
199
*Links to talks->*
200 1 Richard Trotta
201 35 Stephen Kay
----
202 1 Richard Trotta
203 35 Stephen Kay
h2. July 11, 2018
204 1 Richard Trotta
205 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #384
206 1 Richard Trotta
207 35 Stephen Kay
*Action items:*
208 1 Richard Trotta
209 35 Stephen Kay
* Update run plan, e.g. add prescales (Garth)
210
* Check on details of: magnet cycling procedure, minimum angles, MCC fringe field steering, beam energy measurements, optics checks (Tanja)
211
* Identify additional run coordinators (Tanja)
212
* Encourage collaborators to take shifts, e.g. FIU (Pete)
213
* Draft email about shifts etc. to collaboration (Tanja)
214
* Develop diagnostic scripts and kaonLT specific (Richard, Ryan)
215
* Continue documentation development, e.g. checklist, shift taker instructions, HowTo or link to generic Hall C HowTo, task list, web page (Richard, Garth)
216 1 Richard Trotta
217 35 Stephen Kay
*Discussions:*
218 1 Richard Trotta
219 35 Stephen Kay
* SHMS Aerogel Cherenkov: tray has been changed to SP-11 on 10 July, nominal time for change is 8 hours, one tray can stay in the hall to minimize overhead
220
* HGC: waiting for re-installation
221
* Trigger checkout: main items to keep in mind: fADC thresholds, timing HMS/SHMS - leading arm, possible rate limitations
222
* Shifts
223
* Diagnostics scripts and documentation
224
* Personnel schedules
225 1 Richard Trotta
226
----
227
228
h2. June 28, 2018
229
230
*Links to talks->* "Richard":https://redmine.jlab.org/documents/34
231
232
*Action Items:*
233
234
* Develop and post shift schedule. Send out request. Find out who is KAONLT liaison (Tanja)
235
* Contact potential run coordinators. (Tanja)
236
* Aerogel tray exchange for start of experiment and coordination of future exchanges (Vladimir)
237
* Update runplan and prepare documents needed for shift crew, e.g. run sheets (Garth)
238
* Set up a web page to collect and link from Redmine - How-To documents, initial calibrations, etc. (Garth, Richard)
239
* Adapt luminosity scan script to calculate kaon yields by run number for use during experiment by shift crew - has to be simple to use. (Richard)
240
* Develop trigger/detector checkout plan (Tanja, initial draft)
241
** Are all experts available at run start, experts needed: coincidence timing , Harp Scans, BCM calibrations, ...
242
* Find out from JLab what the anticipated settings are for limit switches for both spectrometers and for separation angle in between them. Also find out what magnet cycling procedure should be used for L/T quality separation data (Tanja)
243
* Find out if all aerogel trays needed for experiment can be stored inside Hall C to avoid having to open truck ramp (Vladimir)
244
245
*Analysis Updates:*
246
247
* Ryan 
248
** resolving differences between his analysis and Richard's
249
250
* Richard
251
** Discussed with Mark Jones and is cross checking his January luminosity scan analysis against Mark's. Realized that BCM calibrations (gains, offsets etc) are different - currently working on fixing that, presents current results - low curent point is ~10% below unity, discussion that this seems to indicate that BCM offsets are the issue as low current points would be most sensitive, is planning to also double-check the BCM calibration procedure - had discussion with Dave Mack at JLab
252
** Presents a script developed for luminosity scans that determines yields for a run number input on command line. Discussion this could be good to adapt for kaon counting during experiment.
253
254
----
255
256 35 Stephen Kay
h2. May 31, 2018
257 1 Richard Trotta
258 35 Stephen Kay
*Links to talks->* "Samip":https://redmine.jlab.org/documents/30
259 1 Richard Trotta
260 35 Stephen Kay
----
261 1 Richard Trotta
262 35 Stephen Kay
h2. May 17, 2018 
263 1 Richard Trotta
264 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/29, "Ryan":https://hallcweb.jlab.org/DocDB/0009/000968/001/Presentation.pdf, "Samip":https://redmine.jlab.org/documents/30
265 2 Richard Trotta
266 35 Stephen Kay
* Luminosity scans (Richard, Ryan)
267
** Carbon scan from April seems consistent with no boiling, LH2 and LD2 show deviation from unity, should check effect of EDTM events on efficiencies
268
** Carbon scans from January (low rates) have large deviations from unity, in particular behavior at higher currents (>40uA), e.g. cpu dead time, that is not yet understood
269
** discussion about pre-scale factors
270 1 Richard Trotta
271 35 Stephen Kay
* Discussion about Richard's script extracting and printing information from report files and trees including histograms
272
** Add option for looking at yields with cuts on cointime, target window, and missing mass
273
** Add option to look at real peak vs. background level
274 1 Richard Trotta
275 35 Stephen Kay
* H(e,e'p) kinematics investigation for fall run (Samip)
276
** Optimal range is between electron angles of 17-20 degrees, time required ranges from ~1 hour at 17 degrees to ~3 hour at 20 degrees, other angles may be of interest for disentangling charge and current dependent effects
277 1 Richard Trotta
278 35 Stephen Kay
* *Action Items*
279
** Luminosity scans at low rates from January (Richard)
280
** Luminosity scans from April with corrected efficiencies, e.d. DT (Ryan)
281
** H(e,e'p) and H(e,e') kinematics for upcoming Kaon LT run (Samip)
282
** Kaon LT detailed run plan (Garth, Pete, Tanja)
283
** Preparations, e.g. report files, diagnostic histograms and real time monitoring, shift worker instructions, optimization of trees (all)
284 1 Richard Trotta
285
----
286
287 35 Stephen Kay
h2. May 10, 2018
288 1 Richard Trotta
289 35 Stephen Kay
*Links to talks->* "Hem":https://redmine.jlab.org/documents/24, "Richard":https://redmine.jlab.org/documents/23, "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/26
290 2 Richard Trotta
291 35 Stephen Kay
* Luminosity Scans January 2018 (Richard)
292
** Tracking-based analysis for Runs 1415-1423, .. for now focus on HMS, typical HMS S1X rates are <
293
** Cuts applied: PID for electrons (Cer, Cal), acceptance (delta)
294
** Efficiency calculation was investigated in detail and applied using scalers from trees
295
** Results for carbon (normalized to 30uA) show large variation - need to understand
296
** *Next steps:*
297
*** Double check calculation of computer lifetime, look for differences in TRIG and PRETRIG scalers
298
*** Check stability of pre-scale (Ryan saw changes within runs)
299
*** Check if detector calibrations for runs are implemented correctly
300
*** Analyze with Ryan's cuts
301 1 Richard Trotta
302 35 Stephen Kay
* Luminosity Scans April 2018 (Ryan)
303
** Confirms Richard's earlier finding that scaler-based analysis is not reliable and that it's best to analyze event-by-event
304
** Tracking-based analysis for runs 2073-2095
305
** Cuts applied: PID for electrons (TOF, Cal, Chi2), acceptance (delta and angles), BCM4a
306
** Included most recent detector calibrations in replay of these runs
307
** Efficiencies from report file mainly, may need to update tracking efficiency implementation
308
** Found that calculations of computer deadtime requires different set of scalers for runs from January to those from April 2018
309
** Results show carbon yields consistent with unity within error (0.5% error bars), and boiling for hydrogen and deuterium
310
** *Next steps:*
311
*** Check tracking efficiency
312 5 Richard Trotta
313 35 Stephen Kay
* *Global comments on Luminosity Scans (so far)*
314
** April 2018 scans show hydrogen and deuterium target boiling on level of 3-4%, Carbon is consistent with no boiling, as expected - based on description, new targets are expected to have less boiling than those used previously, e.g. in FPI2. Double check this.
315
** Efficiencies in report files need to be updated, e.g. CPU deadtime (Richard)
316
** Check if BCM4a is the one closest to the target - get a map of the hall (Richard, Ryan)
317
** Uncertainties on current
318
** Detector calibrations
319
** HMS vs. SHMS
320 1 Richard Trotta
321 35 Stephen Kay
* eK+ coincidence time from SIDIS Spring 2018 run (Samip)
322
** Worked with Mark Jones on coincidence time calculation - now available in hcana (see Samip's 10 May 2018 email for more details)
323
** runs used in this analysis: 3423 with Q2=3.1 GeV2 and W=2.78 GeV
324
** Coincidence time spectrum shows peak separations >2 ns corresponding to different accelerator frequency
325
** Missing mass spectra: Kaon peak clearly visible, also see pions even after cuts
326
** Found that pions appear localized in phase space - seems to be due to end point in kinematic phase space
327
** *Next steps:*
328
*** Look for a run with kaon momentum closer to 3 GeV/c (aerogel threshold is ~3 GeV/c for kaons for n=1.015)
329 2 Richard Trotta
330 35 Stephen Kay
* Yield normalized ratios from SIDIS (Hem)
331
** Yield ratios of data to MC match well in shape, but normalization seems not quite right
332
** *Next steps:*
333
*** Check if efficiencies, currents, run time etc. are taken into account correctly
334 4 Richard Trotta
335
----
336
337 35 Stephen Kay
h2. April 26, 2018
338 4 Richard Trotta
339 35 Stephen Kay
*Links to talks->* "Richard,":https://redmine.jlab.org/documents/18 "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/25
340 4 Richard Trotta
341 35 Stephen Kay
* Discussion luminosity scan analysis (earlier scan) - Richard
342
** Shown is a scaler-based analysis using scalers from report file and from ROOT tree - the values are different, why that is has to be checked
343
** Notes on efficiencies in report file:
344
*** DT (EDTM) is not electronic deadtime. Instead use for now 50ns* trigger rate for HMS and 100ns* trigger rate for SHMS
345
*** Cherenkov efficiency seems low (check if that is due to PID, thresholds, pi/e, etc)
346
*** Tracking efficiency needs to be checked
347
*** 3/4 trigger efficiency seems ok
348
* Discussion luminosity scan analysis (later scan) - Ryan
349
** Fewer carbon runs than earlier scan
350
** Shown is a tracking-based analysis using data from the ROOT trees
351
** First results for carbon, LH2, and LD2, but efficiencies need to be checked
352
* SIDIS analysis - Hem
353
** Shown is a data/MC comparison for different kinematic settings. Agreement in shape is very good. Normalization has yet to be applied.
354
** Discussion about agreement in z and apparent offset - relation of this offset with spectrometer offset
355
* Analysis of exclusive events in SIDIS - Samip
356
** Shown is a look at the first kaon events in exclusive limit of SIDIS data
357
** Ongoing work on implementing coincidence time into tree
358
* Discussion of run plan, and in particular possible low Q2/low energy
359
** Assume that kaon low Q2=0.4 already included - have kinematics with specified beam energies, if needed
360
** For pion form factor and LT, have two possible settings that can use the prescribed beam energies: Q2=1.45 and 0.35 GeV2 - prioritize towards the higher Q2 as not as sensitive to offsets
361
** Garth will put this together in a draft email
362
363 12 Richard Trotta
----
364
365 35 Stephen Kay
h2. March 29, 2018
366 12 Richard Trotta
367 35 Stephen Kay
*Links to talks->* "Richard, ":https://redmine.jlab.org/documents/16 "Samip":https://redmine.jlab.org/documents/27
368 13 Richard Trotta
369 35 Stephen Kay
* Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja)
370
* Luminosity scans (Ryan, Andres, Richard, Pete)
371
* Macros, SIDIS analysis (Hem, Anashe)
372
* Elastic data (TBD)
373
374 14 Richard Trotta
----
375 18 Richard Trotta
376 35 Stephen Kay
h2. February 22, 2018
377 18 Richard Trotta
378 35 Stephen Kay
*Links to talks->* "Andres":https://redmine.jlab.org/documents/19
379 18 Richard Trotta
380 35 Stephen Kay
*  Discussion of Andres' slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing.
381
* Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics
382
* Discussion of Richard's slides on run plan kinematics and preparations -
383
** everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics
384
** before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations
385
** for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group
386
** kinematics plots W-Q2 show that still need to do some optimization
387
** run sheets: include raster size, update coincidence count labeling, and carbon target labeling
388
* Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time.
389 26 Richard Trotta
390 35 Stephen Kay
* *Action Items:*
391
** Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja)
392
** Update run sheet and kinematic optimization for W/Q2 (Garth)
393
** Circulate elastic calculations for kinematic settings (Samip)
394
** Continue investigation of elastic data and run plan kinematics (Andres/Richard)
395
** Test software installation instructions (Pete)
396
** Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja) 
397 32 Stephen Kay
398
----