h1. *Kaon LT Meetings*
4
5 41 Stephen Kay
Kaon LT collaboration analysis meetings. Please add your talk to the meeting ahead of time. Add the newest meeting to the top of the list!
6
7 78 Richard Trotta
h2. Jan 8,2020
8
9
*Links to talks->* "Richard":https://redmine.jlab.org/documents/76
10 79 Richard Trotta
11 80 Richard Trotta
* Richard
12
** PID efficiency script is coming together
13
*** Tighter cuts and cuts on timing, beta, etc. will be needed for cleaner electron cuts
14
*** Hcal cut should be changed to cut around the mean normalized value instead of cutting above or below it only. This will assure electrons aren't lost.
15
16
Next meeting will be January 15th at 4 pm ET 
17
18 78 Richard Trotta
----
19
20 77 Richard Trotta
h2. Dec 17,2019
21
22
Reminder: Mark Jones' commissioning analysis meetings are bi-weekly and announced by Mark
23
24
* Stephen
25
** Number of passes finished for HMS calorimeter
26
*** Still wiggles in all passes
27
** Finished his report on calibrations, "DC and Calorimeters":https://redmine.jlab.org/documents/74
28
** Put together a list of people's jobs from Regina over the next couple of months, "Regina Analysis Tasks":https://redmine.jlab.org/documents/75
29
*** CUA will be putting together a similar list
30
31
* Richard
32
** Fixed one error issue with SHMS calorimeter calibration code (discussed Dec 10th meeting), but still have one error
33
** PID efficiency script plots are complete, but still some questions he needs to work out before a final version
34
*** Eventually need to include tracking into PID efficiencies
35
** Pete brought up the question for a number of multi-hits we are getting
36
*** (Dead Time)+(Trigger efficiency)-EDTM
37
38
Next meeting will be after the break; Wednesday, January 8th at 3 pm ET
39
40
----
41
42 72 Richard Trotta
h2. Dec 10,2019
43 73 Richard Trotta
44 72 Richard Trotta
*Links to talks->* "Richard":https://redmine.jlab.org/documents/73
45 74 Richard Trotta
46
* Garth and Stephen were in the most recent SIDIS meeting
47
** Wit had lots of hcana changes but they seem to be critical to our work 
48
*** Changes such as new detector classes
49
** Hopefully Wit will present these in the next commissioning meeting
50 1 Richard Trotta
51 77 Richard Trotta
* Stephen improved wiggles but still prevalent
52 74 Richard Trotta
53
* Richard finished HGCer calibrations, he concluded that the online parameters are sufficient
54
** He also has been looking at SHMS calorimeter calibrations but has had issues running the scripts. Most likely a pathing issue.
55
** The "tasks":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_Tasks page has been updated with a section for efficiencies. 
56
*** A PID efficiency script is currently being developed and hopefully should have some plots for our next meeting.
57
58 1 Richard Trotta
* Next meeting will be December 17th at 3 pm ET.
59 74 Richard Trotta
60 75 Richard Trotta
----
61 74 Richard Trotta
62 71 Richard Trotta
h2. Nov 26,2019
63
64
*Links to talks->* "Richard":https://redmine.jlab.org/issues/480
65
66
* Stephen
67
** DC SHMS, small-angle has poor performance
68
*** Tighter cuts or PID (currently only looks for electrons)
69
** Vardan said calorimeter wiggles are an ongoing issue with no current solution
70
71
* Richard
72
** The calibrations are nearing completion with only the HG Cherenkov and SHMS calorimeter yet to be finished. There are also smaller issues with some DC and HMS calorimeter runs.
73
*** Richard will pick up looking at the HGCer calibrations from Vijay's scripts. 
74
*** Richard will also be looking at the SHMS calorimeter and with the suggestion of getting some negatively polarized SHMS runs from Hem.
75
** The HMS Cherenkov is finished with the conclusion that the calibrations from the online runs are good
76
** We can begin looking forward towards efficiencies. 
77
*** Garth suggested that looking at PID may be an advantageous first steps. Precise definitions of these PIDs will need to be logged.
78
*** Clear notes on efficiencies steps will be needed. They will need to be redefined multiple times in multiple ways. 
79
80
* Hem
81
** Has been looking at the calorimeter as well. 
82
** He has seen the second band in the spectra for some runs, we suggested further looks into HMS hodoscope and subsequently reference times. A recalibration will need to be performed.  
83 70 Richard Trotta
84
----
85
86
h2. Nov 19,2019
87
88
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
89
90
* Richard
91
** Finished up TDC cut paper going through the procedure (found "here":https://redmine.jlab.org/issues/500)
92
** Needed to add Carlos pre-trigger designs to an appendix for the paper which clarifies the introduction section
93
94
* Stephen
95
** Issues with DC calibration for only a few runs during each run period
96
** "wiggles" in HMS calorimeter calibrations for some runs
97
*** few runs where HMS cal totally failed (which was dependent on initial parameters)
98
*** Spring looked worse than the rest (surprisingly), but this may be because online calibration wasn't great
99
100 2 Richard Trotta
----
101
102 68 Richard Trotta
h2. Nov 5,2019
103
104
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500
105
106
* Timing update (Stephen)
107
** Reference times between Richard and Stephen are very similar and the GitHub is updated accordingly
108
** Richard is going to add the trigger time cuts once the fall runs are finished (by end of week)
109
** First pass of detector reference time parameter files finished
110
111
* Peter's hcana code (Richard and Stephen)
112
** Peter's code does not remove ghost bands (already known), but now Stephen is seeing a strang horizontal band for just SHMS hodoscope 2D plots
113
*** Richard has emailed Peter about the issue with no response yet (follow-up soon)
114
** This means we still need the reference time amplitude cut with Peter's code but using just the amplitude cut with Mark's latest version of hcana should be sufficient for calibrations.
115
116
* Calibrations were decided to be done once per shift
117
118
* Next meeting schedule...
119
** Small meetings Nov 12 and Nov 19 (at 3pm ET) so Richard and Stephen can iron out the timing and calibrations
120
** November 26 (at 3pm ET) will be a larger meeting. 
121
*** This is the rough deadline we made for finishing up calibrations. 
122
*** This should be sufficient for all detectors (although hodoscope and HG which may persist). The ultimate goal is for all calibrations to be finished up before Winter break!!
123
124
----
125
126 62 Richard Trotta
h2. Oct 22,2019
127
128 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
129 62 Richard Trotta
130 65 Richard Trotta
* SHMS Reference Time Amplitude Cuts(Stephen)
131
** Extra peaks in HG from cross-talk and "ghost-bands" due to ADC screw up
132
*** cuts applied on SHMS ADC ref time amplitude (greater than zero) done before any further event selection and histogram filling
133
** This is a temporary fix to "ghost-bands" and cross talk
134
*** Although for HG there is still a small peak. The hodoscope is fine.
135
** The time window is easier to set now.
136
** DC has been fine (since it uses TDC)
137
*** DC calibrations should be good to complete, other detectors need more fixes (i.e. the remaining "ghost-band")
138
** Hodoscope still bad but this might be because of that "ghost-band", needs to be further investigated
139
140
* Peter's hcana fixes for reference time (Richard)
141
** Peter implemented changes to hcana
142
** Two major issues...
143 67 Richard Trotta
## Amplitude goes to null and integral is low or negative which causes a rate-dependent efficiency. 
144
*** Peter has used the average pulse value acquired over a large sample of runs for each detector. 
145 1 Richard Trotta
## Timing offset between EL-REAL and 3/4 is 130 ns which causes junk tracks at high SHMS rates (~6% of the time)
146 67 Richard Trotta
*** Peter created a routine to find the best offset by means of matching TDC and ADC
147
** Richard has been checking for bugs in the code. 
148
*** It seems to be ready to implement, Richard emailed Peter for confirmation on the implementation in our group directory
149
150
* Calibration of HMS detectors when the timing is agreed upon by Stephen and Richard.
151
** Besides hodoscope which still has an issue with the script
152
** Stephen and Richard are having a meeting late next week to determine time window values
153
*** These will be relatively final, but on the wider side if adjustments need to be made in the future
154 65 Richard Trotta
155 62 Richard Trotta
-----
156
157 61 Richard Trotta
h2. Sep 24,2019
158
159 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
160 61 Richard Trotta
161
-----
162
163 59 Vijay Kumar
h2. Sep 10,2019
164 1 Richard Trotta
165 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/72 "Richard":https://redmine.jlab.org/issues/500
166 59 Vijay Kumar
167
-----
168 55 Stephen Kay
169 1 Richard Trotta
h2. August 26, 2019
170 55 Stephen Kay
171 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/70 "Vijay":https://redmine.jlab.org/documents/71 "Richard":https://redmine.jlab.org/issues/500
172 55 Stephen Kay
173
----
174
175 54 Richard Trotta
h2. June 21, 2019
176
177
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 
178
179
----
180
181 42 Stephen Kay
h2. June 14, 2019
182
183 53 Garth Huber
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/64 "Update-Mireille":https://redmine.jlab.org/documents/65 "Vijay":https://redmine.jlab.org/attachments/download/814/Analy_update3.pdf
184 52 Garth Huber
185 46 Richard Trotta
186 42 Stephen Kay
----
187
188 35 Stephen Kay
h2. June 4, 2019
189 1 Richard Trotta
190 40 Mireille Muhoza
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/56 "Nathan":https://redmine.jlab.org/documents/57 "Vijay":https://redmine.jlab.org/documents/58 "Richard":https://redmine.jlab.org/documents/59 "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/61
191 36 Vijay Kumar
192 1 Richard Trotta
193 35 Stephen Kay
----
194 1 Richard Trotta
195 35 Stephen Kay
h2. May 21, 2019
196 1 Richard Trotta
197 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/52 "Mireille":https://redmine.jlab.org/documents/? "Stephen":https://redmine.jlab.org/documents/53 "Nathan":https://redmine.jlab.org/documents/54 "Vijay":https://redmine.jlab.org/documents/55
198
199 1 Richard Trotta
----
200
201 35 Stephen Kay
h2. May 14, 2019
202 1 Richard Trotta
203 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/48 "Carlos' slides":https://redmine.jlab.org/documents/49 "Mireille":https://redmine.jlab.org/documents/50 "Stephen":https://redmine.jlab.org/documents/51
204 1 Richard Trotta
205
----
206
207 35 Stephen Kay
h2. April 30, 2019
208 1 Richard Trotta
209 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/45 "Richard's slides in wiki":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_How-To "Brad Computing":https://redmine.jlab.org/documents/46 "Stephen":https://redmine.jlab.org/documents/47
210 1 Richard Trotta
211
----
212
213 35 Stephen Kay
h2. February 4, 2019
214 1 Richard Trotta
215 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/43 "Stephen":https://redmine.jlab.org/documents/44
216 1 Richard Trotta
217 35 Stephen Kay
----
218 1 Richard Trotta
219 35 Stephen Kay
h2. August 21, 2018
220 1 Richard Trotta
221 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
222 1 Richard Trotta
223 35 Stephen Kay
----
224 1 Richard Trotta
225 35 Stephen Kay
h2. August 8, 2018
226 1 Richard Trotta
227 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
228
229 1 Richard Trotta
----
230
231 35 Stephen Kay
h2. August 3, 2018
232 1 Richard Trotta
233 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383
234
*Links to talks->*
235 1 Richard Trotta
236 35 Stephen Kay
----
237 1 Richard Trotta
238 35 Stephen Kay
h2. July 11, 2018
239 1 Richard Trotta
240 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #384
241 1 Richard Trotta
242 35 Stephen Kay
*Action items:*
243 1 Richard Trotta
244 35 Stephen Kay
* Update run plan, e.g. add prescales (Garth)
245
* Check on details of: magnet cycling procedure, minimum angles, MCC fringe field steering, beam energy measurements, optics checks (Tanja)
246
* Identify additional run coordinators (Tanja)
247
* Encourage collaborators to take shifts, e.g. FIU (Pete)
248
* Draft email about shifts etc. to collaboration (Tanja)
249
* Develop diagnostic scripts and kaonLT specific (Richard, Ryan)
250
* Continue documentation development, e.g. checklist, shift taker instructions, HowTo or link to generic Hall C HowTo, task list, web page (Richard, Garth)
251 1 Richard Trotta
252 35 Stephen Kay
*Discussions:*
253 1 Richard Trotta
254 35 Stephen Kay
* SHMS Aerogel Cherenkov: tray has been changed to SP-11 on 10 July, nominal time for change is 8 hours, one tray can stay in the hall to minimize overhead
255
* HGC: waiting for re-installation
256
* Trigger checkout: main items to keep in mind: fADC thresholds, timing HMS/SHMS - leading arm, possible rate limitations
257
* Shifts
258
* Diagnostics scripts and documentation
259
* Personnel schedules
260 1 Richard Trotta
261
----
262
263
h2. June 28, 2018
264
265
*Links to talks->* "Richard":https://redmine.jlab.org/documents/34
266
267
*Action Items:*
268
269
* Develop and post shift schedule. Send out request. Find out who is KAONLT liaison (Tanja)
270
* Contact potential run coordinators. (Tanja)
271
* Aerogel tray exchange for start of experiment and coordination of future exchanges (Vladimir)
272
* Update runplan and prepare documents needed for shift crew, e.g. run sheets (Garth)
273
* Set up a web page to collect and link from Redmine - How-To documents, initial calibrations, etc. (Garth, Richard)
274
* Adapt luminosity scan script to calculate kaon yields by run number for use during experiment by shift crew - has to be simple to use. (Richard)
275
* Develop trigger/detector checkout plan (Tanja, initial draft)
276
** Are all experts available at run start, experts needed: coincidence timing , Harp Scans, BCM calibrations, ...
277
* Find out from JLab what the anticipated settings are for limit switches for both spectrometers and for separation angle in between them. Also find out what magnet cycling procedure should be used for L/T quality separation data (Tanja)
278
* Find out if all aerogel trays needed for experiment can be stored inside Hall C to avoid having to open truck ramp (Vladimir)
279
280
*Analysis Updates:*
281
282
* Ryan 
283
** resolving differences between his analysis and Richard's
284
285
* Richard
286
** Discussed with Mark Jones and is cross checking his January luminosity scan analysis against Mark's. Realized that BCM calibrations (gains, offsets etc) are different - currently working on fixing that, presents current results - low curent point is ~10% below unity, discussion that this seems to indicate that BCM offsets are the issue as low current points would be most sensitive, is planning to also double-check the BCM calibration procedure - had discussion with Dave Mack at JLab
287
** Presents a script developed for luminosity scans that determines yields for a run number input on command line. Discussion this could be good to adapt for kaon counting during experiment.
288
289
----
290
291 35 Stephen Kay
h2. May 31, 2018
292 1 Richard Trotta
293 35 Stephen Kay
*Links to talks->* "Samip":https://redmine.jlab.org/documents/30
294 1 Richard Trotta
295 35 Stephen Kay
----
296 1 Richard Trotta
297 35 Stephen Kay
h2. May 17, 2018 
298 1 Richard Trotta
299 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/29, "Ryan":https://hallcweb.jlab.org/DocDB/0009/000968/001/Presentation.pdf, "Samip":https://redmine.jlab.org/documents/30
300 2 Richard Trotta
301 35 Stephen Kay
* Luminosity scans (Richard, Ryan)
302
** Carbon scan from April seems consistent with no boiling, LH2 and LD2 show deviation from unity, should check effect of EDTM events on efficiencies
303
** Carbon scans from January (low rates) have large deviations from unity, in particular behavior at higher currents (>40uA), e.g. cpu dead time, that is not yet understood
304
** discussion about pre-scale factors
305 1 Richard Trotta
306 35 Stephen Kay
* Discussion about Richard's script extracting and printing information from report files and trees including histograms
307
** Add option for looking at yields with cuts on cointime, target window, and missing mass
308
** Add option to look at real peak vs. background level
309 1 Richard Trotta
310 35 Stephen Kay
* H(e,e'p) kinematics investigation for fall run (Samip)
311
** Optimal range is between electron angles of 17-20 degrees, time required ranges from ~1 hour at 17 degrees to ~3 hour at 20 degrees, other angles may be of interest for disentangling charge and current dependent effects
312 1 Richard Trotta
313 35 Stephen Kay
* *Action Items*
314
** Luminosity scans at low rates from January (Richard)
315
** Luminosity scans from April with corrected efficiencies, e.d. DT (Ryan)
316
** H(e,e'p) and H(e,e') kinematics for upcoming Kaon LT run (Samip)
317
** Kaon LT detailed run plan (Garth, Pete, Tanja)
318
** Preparations, e.g. report files, diagnostic histograms and real time monitoring, shift worker instructions, optimization of trees (all)
319 1 Richard Trotta
320
----
321
322 35 Stephen Kay
h2. May 10, 2018
323 1 Richard Trotta
324 35 Stephen Kay
*Links to talks->* "Hem":https://redmine.jlab.org/documents/24, "Richard":https://redmine.jlab.org/documents/23, "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/26
325 2 Richard Trotta
326 35 Stephen Kay
* Luminosity Scans January 2018 (Richard)
327
** Tracking-based analysis for Runs 1415-1423, .. for now focus on HMS, typical HMS S1X rates are <
328
** Cuts applied: PID for electrons (Cer, Cal), acceptance (delta)
329
** Efficiency calculation was investigated in detail and applied using scalers from trees
330
** Results for carbon (normalized to 30uA) show large variation - need to understand
331
** *Next steps:*
332
*** Double check calculation of computer lifetime, look for differences in TRIG and PRETRIG scalers
333
*** Check stability of pre-scale (Ryan saw changes within runs)
334
*** Check if detector calibrations for runs are implemented correctly
335
*** Analyze with Ryan's cuts
336 1 Richard Trotta
337 35 Stephen Kay
* Luminosity Scans April 2018 (Ryan)
338
** Confirms Richard's earlier finding that scaler-based analysis is not reliable and that it's best to analyze event-by-event
339
** Tracking-based analysis for runs 2073-2095
340
** Cuts applied: PID for electrons (TOF, Cal, Chi2), acceptance (delta and angles), BCM4a
341
** Included most recent detector calibrations in replay of these runs
342
** Efficiencies from report file mainly, may need to update tracking efficiency implementation
343
** Found that calculations of computer deadtime requires different set of scalers for runs from January to those from April 2018
344
** Results show carbon yields consistent with unity within error (0.5% error bars), and boiling for hydrogen and deuterium
345
** *Next steps:*
346
*** Check tracking efficiency
347 5 Richard Trotta
348 35 Stephen Kay
* *Global comments on Luminosity Scans (so far)*
349
** April 2018 scans show hydrogen and deuterium target boiling on level of 3-4%, Carbon is consistent with no boiling, as expected - based on description, new targets are expected to have less boiling than those used previously, e.g. in FPI2. Double check this.
350
** Efficiencies in report files need to be updated, e.g. CPU deadtime (Richard)
351
** Check if BCM4a is the one closest to the target - get a map of the hall (Richard, Ryan)
352
** Uncertainties on current
353
** Detector calibrations
354
** HMS vs. SHMS
355 1 Richard Trotta
356 35 Stephen Kay
* eK+ coincidence time from SIDIS Spring 2018 run (Samip)
357
** Worked with Mark Jones on coincidence time calculation - now available in hcana (see Samip's 10 May 2018 email for more details)
358
** runs used in this analysis: 3423 with Q2=3.1 GeV2 and W=2.78 GeV
359
** Coincidence time spectrum shows peak separations >2 ns corresponding to different accelerator frequency
360
** Missing mass spectra: Kaon peak clearly visible, also see pions even after cuts
361
** Found that pions appear localized in phase space - seems to be due to end point in kinematic phase space
362
** *Next steps:*
363
*** Look for a run with kaon momentum closer to 3 GeV/c (aerogel threshold is ~3 GeV/c for kaons for n=1.015)
364 2 Richard Trotta
365 35 Stephen Kay
* Yield normalized ratios from SIDIS (Hem)
366
** Yield ratios of data to MC match well in shape, but normalization seems not quite right
367
** *Next steps:*
368
*** Check if efficiencies, currents, run time etc. are taken into account correctly
369 4 Richard Trotta
370
----
371
372 35 Stephen Kay
h2. April 26, 2018
373 4 Richard Trotta
374 35 Stephen Kay
*Links to talks->* "Richard,":https://redmine.jlab.org/documents/18 "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/25
375 4 Richard Trotta
376 35 Stephen Kay
* Discussion luminosity scan analysis (earlier scan) - Richard
377
** Shown is a scaler-based analysis using scalers from report file and from ROOT tree - the values are different, why that is has to be checked
378
** Notes on efficiencies in report file:
379
*** DT (EDTM) is not electronic deadtime. Instead use for now 50ns* trigger rate for HMS and 100ns* trigger rate for SHMS
380
*** Cherenkov efficiency seems low (check if that is due to PID, thresholds, pi/e, etc)
381
*** Tracking efficiency needs to be checked
382
*** 3/4 trigger efficiency seems ok
383
* Discussion luminosity scan analysis (later scan) - Ryan
384
** Fewer carbon runs than earlier scan
385
** Shown is a tracking-based analysis using data from the ROOT trees
386
** First results for carbon, LH2, and LD2, but efficiencies need to be checked
387
* SIDIS analysis - Hem
388
** Shown is a data/MC comparison for different kinematic settings. Agreement in shape is very good. Normalization has yet to be applied.
389
** Discussion about agreement in z and apparent offset - relation of this offset with spectrometer offset
390
* Analysis of exclusive events in SIDIS - Samip
391
** Shown is a look at the first kaon events in exclusive limit of SIDIS data
392
** Ongoing work on implementing coincidence time into tree
393
* Discussion of run plan, and in particular possible low Q2/low energy
394
** Assume that kaon low Q2=0.4 already included - have kinematics with specified beam energies, if needed
395
** For pion form factor and LT, have two possible settings that can use the prescribed beam energies: Q2=1.45 and 0.35 GeV2 - prioritize towards the higher Q2 as not as sensitive to offsets
396
** Garth will put this together in a draft email
397
398 12 Richard Trotta
----
399
400 35 Stephen Kay
h2. March 29, 2018
401 12 Richard Trotta
402 35 Stephen Kay
*Links to talks->* "Richard, ":https://redmine.jlab.org/documents/16 "Samip":https://redmine.jlab.org/documents/27
403 13 Richard Trotta
404 35 Stephen Kay
* Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja)
405
* Luminosity scans (Ryan, Andres, Richard, Pete)
406
* Macros, SIDIS analysis (Hem, Anashe)
407
* Elastic data (TBD)
408
409 14 Richard Trotta
----
410 18 Richard Trotta
411 35 Stephen Kay
h2. February 22, 2018
412 18 Richard Trotta
413 35 Stephen Kay
*Links to talks->* "Andres":https://redmine.jlab.org/documents/19
414 18 Richard Trotta
415 35 Stephen Kay
*  Discussion of Andres' slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing.
416
* Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics
417
* Discussion of Richard's slides on run plan kinematics and preparations -
418
** everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics
419
** before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations
420
** for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group
421
** kinematics plots W-Q2 show that still need to do some optimization
422
** run sheets: include raster size, update coincidence count labeling, and carbon target labeling
423
* Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time.
424 26 Richard Trotta
425 35 Stephen Kay
* *Action Items:*
426
** Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja)
427
** Update run sheet and kinematic optimization for W/Q2 (Garth)
428
** Circulate elastic calculations for kinematic settings (Samip)
429
** Continue investigation of elastic data and run plan kinematics (Andres/Richard)
430
** Test software installation instructions (Pete)
431
** Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja) 
432 32 Stephen Kay
433
----