Project

General

Profile

Kaon LT Meetings » History » Version 85

Richard Trotta, 02/06/2020 03:05 PM

1 1 Richard Trotta
{{>toc}}
2
3
h1. *Kaon LT Meetings*
4
5 41 Stephen Kay
Kaon LT collaboration analysis meetings. Please add your talk to the meeting ahead of time. Add the newest meeting to the top of the list!
6
7 83 Richard Trotta
h2. Jan 22, 2020
8
9
*Links to talks->* "Richard's Hall C Winter Talk Draft 1":https://redmine.jlab.org/attachments/download/937/KaonLTHallC_WinterTalk2020_Draft1.pdf
10
11 85 Richard Trotta
Next meeting Feb 10 @ 11 am ET
12
13 83 Richard Trotta
----
14
15 81 Richard Trotta
h2. Jan 15,2020
16
17 82 Richard Trotta
*Links to talks->* "Richard's Hall C Winter Talk Outline":https://redmine.jlab.org/attachments/download/936/KaonLTHallC_WinterTalk2020.pdf
18 81 Richard Trotta
19 84 Richard Trotta
Next meeting Jan 22 @ 11 am ET
20
21 81 Richard Trotta
----
22
23 78 Richard Trotta
h2. Jan 8,2020
24
25
*Links to talks->* "Richard":https://redmine.jlab.org/documents/76
26 79 Richard Trotta
27 80 Richard Trotta
* Richard
28
** PID efficiency script is coming together
29
*** Tighter cuts and cuts on timing, beta, etc. will be needed for cleaner electron cuts
30
*** Hcal cut should be changed to cut around the mean normalized value instead of cutting above or below it only. This will assure electrons aren't lost.
31
32
Next meeting will be January 15th at 4 pm ET 
33
34 78 Richard Trotta
----
35
36 77 Richard Trotta
h2. Dec 17,2019
37
38
Reminder: Mark Jones' commissioning analysis meetings are bi-weekly and announced by Mark
39
40
* Stephen
41
** Number of passes finished for HMS calorimeter
42
*** Still wiggles in all passes
43
** Finished his report on calibrations, "DC and Calorimeters":https://redmine.jlab.org/documents/74
44
** Put together a list of people's jobs from Regina over the next couple of months, "Regina Analysis Tasks":https://redmine.jlab.org/documents/75
45
*** CUA will be putting together a similar list
46
47
* Richard
48
** Fixed one error issue with SHMS calorimeter calibration code (discussed Dec 10th meeting), but still have one error
49
** PID efficiency script plots are complete, but still some questions he needs to work out before a final version
50
*** Eventually need to include tracking into PID efficiencies
51
** Pete brought up the question for a number of multi-hits we are getting
52
*** (Dead Time)+(Trigger efficiency)-EDTM
53
54
Next meeting will be after the break; Wednesday, January 8th at 3 pm ET
55
56
----
57
58 72 Richard Trotta
h2. Dec 10,2019
59 73 Richard Trotta
60 72 Richard Trotta
*Links to talks->* "Richard":https://redmine.jlab.org/documents/73
61 74 Richard Trotta
62
* Garth and Stephen were in the most recent SIDIS meeting
63
** Wit had lots of hcana changes but they seem to be critical to our work 
64
*** Changes such as new detector classes
65
** Hopefully Wit will present these in the next commissioning meeting
66 1 Richard Trotta
67 77 Richard Trotta
* Stephen improved wiggles but still prevalent
68 74 Richard Trotta
69
* Richard finished HGCer calibrations, he concluded that the online parameters are sufficient
70
** He also has been looking at SHMS calorimeter calibrations but has had issues running the scripts. Most likely a pathing issue.
71
** The "tasks":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_Tasks page has been updated with a section for efficiencies. 
72
*** A PID efficiency script is currently being developed and hopefully should have some plots for our next meeting.
73
74 1 Richard Trotta
* Next meeting will be December 17th at 3 pm ET.
75 74 Richard Trotta
76 75 Richard Trotta
----
77 74 Richard Trotta
78 71 Richard Trotta
h2. Nov 26,2019
79
80
*Links to talks->* "Richard":https://redmine.jlab.org/issues/480
81
82
* Stephen
83
** DC SHMS, small-angle has poor performance
84
*** Tighter cuts or PID (currently only looks for electrons)
85
** Vardan said calorimeter wiggles are an ongoing issue with no current solution
86
87
* Richard
88
** The calibrations are nearing completion with only the HG Cherenkov and SHMS calorimeter yet to be finished. There are also smaller issues with some DC and HMS calorimeter runs.
89
*** Richard will pick up looking at the HGCer calibrations from Vijay's scripts. 
90
*** Richard will also be looking at the SHMS calorimeter and with the suggestion of getting some negatively polarized SHMS runs from Hem.
91
** The HMS Cherenkov is finished with the conclusion that the calibrations from the online runs are good
92
** We can begin looking forward towards efficiencies. 
93
*** Garth suggested that looking at PID may be an advantageous first steps. Precise definitions of these PIDs will need to be logged.
94
*** Clear notes on efficiencies steps will be needed. They will need to be redefined multiple times in multiple ways. 
95
96
* Hem
97
** Has been looking at the calorimeter as well. 
98
** He has seen the second band in the spectra for some runs, we suggested further looks into HMS hodoscope and subsequently reference times. A recalibration will need to be performed.  
99 70 Richard Trotta
100
----
101
102
h2. Nov 19,2019
103
104
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
105
106
* Richard
107
** Finished up TDC cut paper going through the procedure (found "here":https://redmine.jlab.org/issues/500)
108
** Needed to add Carlos pre-trigger designs to an appendix for the paper which clarifies the introduction section
109
110
* Stephen
111
** Issues with DC calibration for only a few runs during each run period
112
** "wiggles" in HMS calorimeter calibrations for some runs
113
*** few runs where HMS cal totally failed (which was dependent on initial parameters)
114
*** Spring looked worse than the rest (surprisingly), but this may be because online calibration wasn't great
115
116 2 Richard Trotta
----
117
118 68 Richard Trotta
h2. Nov 5,2019
119
120
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500
121
122
* Timing update (Stephen)
123
** Reference times between Richard and Stephen are very similar and the GitHub is updated accordingly
124
** Richard is going to add the trigger time cuts once the fall runs are finished (by end of week)
125
** First pass of detector reference time parameter files finished
126
127
* Peter's hcana code (Richard and Stephen)
128
** Peter's code does not remove ghost bands (already known), but now Stephen is seeing a strang horizontal band for just SHMS hodoscope 2D plots
129
*** Richard has emailed Peter about the issue with no response yet (follow-up soon)
130
** This means we still need the reference time amplitude cut with Peter's code but using just the amplitude cut with Mark's latest version of hcana should be sufficient for calibrations.
131
132
* Calibrations were decided to be done once per shift
133
134
* Next meeting schedule...
135
** Small meetings Nov 12 and Nov 19 (at 3pm ET) so Richard and Stephen can iron out the timing and calibrations
136
** November 26 (at 3pm ET) will be a larger meeting. 
137
*** This is the rough deadline we made for finishing up calibrations. 
138
*** This should be sufficient for all detectors (although hodoscope and HG which may persist). The ultimate goal is for all calibrations to be finished up before Winter break!!
139
140
----
141
142 62 Richard Trotta
h2. Oct 22,2019
143
144 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
145 62 Richard Trotta
146 65 Richard Trotta
* SHMS Reference Time Amplitude Cuts(Stephen)
147
** Extra peaks in HG from cross-talk and "ghost-bands" due to ADC screw up
148
*** cuts applied on SHMS ADC ref time amplitude (greater than zero) done before any further event selection and histogram filling
149
** This is a temporary fix to "ghost-bands" and cross talk
150
*** Although for HG there is still a small peak. The hodoscope is fine.
151
** The time window is easier to set now.
152
** DC has been fine (since it uses TDC)
153
*** DC calibrations should be good to complete, other detectors need more fixes (i.e. the remaining "ghost-band")
154
** Hodoscope still bad but this might be because of that "ghost-band", needs to be further investigated
155
156
* Peter's hcana fixes for reference time (Richard)
157
** Peter implemented changes to hcana
158
** Two major issues...
159 67 Richard Trotta
## Amplitude goes to null and integral is low or negative which causes a rate-dependent efficiency. 
160
*** Peter has used the average pulse value acquired over a large sample of runs for each detector. 
161 1 Richard Trotta
## Timing offset between EL-REAL and 3/4 is 130 ns which causes junk tracks at high SHMS rates (~6% of the time)
162 67 Richard Trotta
*** Peter created a routine to find the best offset by means of matching TDC and ADC
163
** Richard has been checking for bugs in the code. 
164
*** It seems to be ready to implement, Richard emailed Peter for confirmation on the implementation in our group directory
165
166
* Calibration of HMS detectors when the timing is agreed upon by Stephen and Richard.
167
** Besides hodoscope which still has an issue with the script
168
** Stephen and Richard are having a meeting late next week to determine time window values
169
*** These will be relatively final, but on the wider side if adjustments need to be made in the future
170 65 Richard Trotta
171 62 Richard Trotta
-----
172
173 61 Richard Trotta
h2. Sep 24,2019
174
175 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/issues/500 "Richard":https://redmine.jlab.org/issues/500
176 61 Richard Trotta
177
-----
178
179 59 Vijay Kumar
h2. Sep 10,2019
180 1 Richard Trotta
181 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/72 "Richard":https://redmine.jlab.org/issues/500
182 59 Vijay Kumar
183
-----
184 55 Stephen Kay
185 1 Richard Trotta
h2. August 26, 2019
186 55 Stephen Kay
187 64 Richard Trotta
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/69 "Ali":https://redmine.jlab.org/documents/70 "Vijay":https://redmine.jlab.org/documents/71 "Richard":https://redmine.jlab.org/issues/500
188 55 Stephen Kay
189
----
190
191 54 Richard Trotta
h2. June 21, 2019
192
193
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 
194
195
----
196
197 42 Stephen Kay
h2. June 14, 2019
198
199 53 Garth Huber
*Links to talks->* "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/64 "Update-Mireille":https://redmine.jlab.org/documents/65 "Vijay":https://redmine.jlab.org/attachments/download/814/Analy_update3.pdf
200 52 Garth Huber
201 46 Richard Trotta
202 42 Stephen Kay
----
203
204 35 Stephen Kay
h2. June 4, 2019
205 1 Richard Trotta
206 40 Mireille Muhoza
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/56 "Nathan":https://redmine.jlab.org/documents/57 "Vijay":https://redmine.jlab.org/documents/58 "Richard":https://redmine.jlab.org/documents/59 "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/61
207 36 Vijay Kumar
208 1 Richard Trotta
209 35 Stephen Kay
----
210 1 Richard Trotta
211 35 Stephen Kay
h2. May 21, 2019
212 1 Richard Trotta
213 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/52 "Mireille":https://redmine.jlab.org/documents/? "Stephen":https://redmine.jlab.org/documents/53 "Nathan":https://redmine.jlab.org/documents/54 "Vijay":https://redmine.jlab.org/documents/55
214
215 1 Richard Trotta
----
216
217 35 Stephen Kay
h2. May 14, 2019
218 1 Richard Trotta
219 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/48 "Carlos' slides":https://redmine.jlab.org/documents/49 "Mireille":https://redmine.jlab.org/documents/50 "Stephen":https://redmine.jlab.org/documents/51
220 1 Richard Trotta
221
----
222
223 35 Stephen Kay
h2. April 30, 2019
224 1 Richard Trotta
225 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/45 "Richard's slides in wiki":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_How-To "Brad Computing":https://redmine.jlab.org/documents/46 "Stephen":https://redmine.jlab.org/documents/47
226 1 Richard Trotta
227
----
228
229 35 Stephen Kay
h2. February 4, 2019
230 1 Richard Trotta
231 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/43 "Stephen":https://redmine.jlab.org/documents/44
232 1 Richard Trotta
233 35 Stephen Kay
----
234 1 Richard Trotta
235 35 Stephen Kay
h2. August 21, 2018
236 1 Richard Trotta
237 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
238 1 Richard Trotta
239 35 Stephen Kay
----
240 1 Richard Trotta
241 35 Stephen Kay
h2. August 8, 2018
242 1 Richard Trotta
243 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
244
245 1 Richard Trotta
----
246
247 35 Stephen Kay
h2. August 3, 2018
248 1 Richard Trotta
249 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383
250
*Links to talks->*
251 1 Richard Trotta
252 35 Stephen Kay
----
253 1 Richard Trotta
254 35 Stephen Kay
h2. July 11, 2018
255 1 Richard Trotta
256 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #384
257 1 Richard Trotta
258 35 Stephen Kay
*Action items:*
259 1 Richard Trotta
260 35 Stephen Kay
* Update run plan, e.g. add prescales (Garth)
261
* Check on details of: magnet cycling procedure, minimum angles, MCC fringe field steering, beam energy measurements, optics checks (Tanja)
262
* Identify additional run coordinators (Tanja)
263
* Encourage collaborators to take shifts, e.g. FIU (Pete)
264
* Draft email about shifts etc. to collaboration (Tanja)
265
* Develop diagnostic scripts and kaonLT specific (Richard, Ryan)
266
* Continue documentation development, e.g. checklist, shift taker instructions, HowTo or link to generic Hall C HowTo, task list, web page (Richard, Garth)
267 1 Richard Trotta
268 35 Stephen Kay
*Discussions:*
269 1 Richard Trotta
270 35 Stephen Kay
* SHMS Aerogel Cherenkov: tray has been changed to SP-11 on 10 July, nominal time for change is 8 hours, one tray can stay in the hall to minimize overhead
271
* HGC: waiting for re-installation
272
* Trigger checkout: main items to keep in mind: fADC thresholds, timing HMS/SHMS - leading arm, possible rate limitations
273
* Shifts
274
* Diagnostics scripts and documentation
275
* Personnel schedules
276 1 Richard Trotta
277
----
278
279
h2. June 28, 2018
280
281
*Links to talks->* "Richard":https://redmine.jlab.org/documents/34
282
283
*Action Items:*
284
285
* Develop and post shift schedule. Send out request. Find out who is KAONLT liaison (Tanja)
286
* Contact potential run coordinators. (Tanja)
287
* Aerogel tray exchange for start of experiment and coordination of future exchanges (Vladimir)
288
* Update runplan and prepare documents needed for shift crew, e.g. run sheets (Garth)
289
* Set up a web page to collect and link from Redmine - How-To documents, initial calibrations, etc. (Garth, Richard)
290
* Adapt luminosity scan script to calculate kaon yields by run number for use during experiment by shift crew - has to be simple to use. (Richard)
291
* Develop trigger/detector checkout plan (Tanja, initial draft)
292
** Are all experts available at run start, experts needed: coincidence timing , Harp Scans, BCM calibrations, ...
293
* Find out from JLab what the anticipated settings are for limit switches for both spectrometers and for separation angle in between them. Also find out what magnet cycling procedure should be used for L/T quality separation data (Tanja)
294
* Find out if all aerogel trays needed for experiment can be stored inside Hall C to avoid having to open truck ramp (Vladimir)
295
296
*Analysis Updates:*
297
298
* Ryan 
299
** resolving differences between his analysis and Richard's
300
301
* Richard
302
** Discussed with Mark Jones and is cross checking his January luminosity scan analysis against Mark's. Realized that BCM calibrations (gains, offsets etc) are different - currently working on fixing that, presents current results - low curent point is ~10% below unity, discussion that this seems to indicate that BCM offsets are the issue as low current points would be most sensitive, is planning to also double-check the BCM calibration procedure - had discussion with Dave Mack at JLab
303
** Presents a script developed for luminosity scans that determines yields for a run number input on command line. Discussion this could be good to adapt for kaon counting during experiment.
304
305
----
306
307 35 Stephen Kay
h2. May 31, 2018
308 1 Richard Trotta
309 35 Stephen Kay
*Links to talks->* "Samip":https://redmine.jlab.org/documents/30
310 1 Richard Trotta
311 35 Stephen Kay
----
312 1 Richard Trotta
313 35 Stephen Kay
h2. May 17, 2018 
314 1 Richard Trotta
315 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/29, "Ryan":https://hallcweb.jlab.org/DocDB/0009/000968/001/Presentation.pdf, "Samip":https://redmine.jlab.org/documents/30
316 2 Richard Trotta
317 35 Stephen Kay
* Luminosity scans (Richard, Ryan)
318
** Carbon scan from April seems consistent with no boiling, LH2 and LD2 show deviation from unity, should check effect of EDTM events on efficiencies
319
** Carbon scans from January (low rates) have large deviations from unity, in particular behavior at higher currents (>40uA), e.g. cpu dead time, that is not yet understood
320
** discussion about pre-scale factors
321 1 Richard Trotta
322 35 Stephen Kay
* Discussion about Richard's script extracting and printing information from report files and trees including histograms
323
** Add option for looking at yields with cuts on cointime, target window, and missing mass
324
** Add option to look at real peak vs. background level
325 1 Richard Trotta
326 35 Stephen Kay
* H(e,e'p) kinematics investigation for fall run (Samip)
327
** Optimal range is between electron angles of 17-20 degrees, time required ranges from ~1 hour at 17 degrees to ~3 hour at 20 degrees, other angles may be of interest for disentangling charge and current dependent effects
328 1 Richard Trotta
329 35 Stephen Kay
* *Action Items*
330
** Luminosity scans at low rates from January (Richard)
331
** Luminosity scans from April with corrected efficiencies, e.d. DT (Ryan)
332
** H(e,e'p) and H(e,e') kinematics for upcoming Kaon LT run (Samip)
333
** Kaon LT detailed run plan (Garth, Pete, Tanja)
334
** Preparations, e.g. report files, diagnostic histograms and real time monitoring, shift worker instructions, optimization of trees (all)
335 1 Richard Trotta
336
----
337
338 35 Stephen Kay
h2. May 10, 2018
339 1 Richard Trotta
340 35 Stephen Kay
*Links to talks->* "Hem":https://redmine.jlab.org/documents/24, "Richard":https://redmine.jlab.org/documents/23, "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/26
341 2 Richard Trotta
342 35 Stephen Kay
* Luminosity Scans January 2018 (Richard)
343
** Tracking-based analysis for Runs 1415-1423, .. for now focus on HMS, typical HMS S1X rates are <
344
** Cuts applied: PID for electrons (Cer, Cal), acceptance (delta)
345
** Efficiency calculation was investigated in detail and applied using scalers from trees
346
** Results for carbon (normalized to 30uA) show large variation - need to understand
347
** *Next steps:*
348
*** Double check calculation of computer lifetime, look for differences in TRIG and PRETRIG scalers
349
*** Check stability of pre-scale (Ryan saw changes within runs)
350
*** Check if detector calibrations for runs are implemented correctly
351
*** Analyze with Ryan's cuts
352 1 Richard Trotta
353 35 Stephen Kay
* Luminosity Scans April 2018 (Ryan)
354
** Confirms Richard's earlier finding that scaler-based analysis is not reliable and that it's best to analyze event-by-event
355
** Tracking-based analysis for runs 2073-2095
356
** Cuts applied: PID for electrons (TOF, Cal, Chi2), acceptance (delta and angles), BCM4a
357
** Included most recent detector calibrations in replay of these runs
358
** Efficiencies from report file mainly, may need to update tracking efficiency implementation
359
** Found that calculations of computer deadtime requires different set of scalers for runs from January to those from April 2018
360
** Results show carbon yields consistent with unity within error (0.5% error bars), and boiling for hydrogen and deuterium
361
** *Next steps:*
362
*** Check tracking efficiency
363 5 Richard Trotta
364 35 Stephen Kay
* *Global comments on Luminosity Scans (so far)*
365
** April 2018 scans show hydrogen and deuterium target boiling on level of 3-4%, Carbon is consistent with no boiling, as expected - based on description, new targets are expected to have less boiling than those used previously, e.g. in FPI2. Double check this.
366
** Efficiencies in report files need to be updated, e.g. CPU deadtime (Richard)
367
** Check if BCM4a is the one closest to the target - get a map of the hall (Richard, Ryan)
368
** Uncertainties on current
369
** Detector calibrations
370
** HMS vs. SHMS
371 1 Richard Trotta
372 35 Stephen Kay
* eK+ coincidence time from SIDIS Spring 2018 run (Samip)
373
** Worked with Mark Jones on coincidence time calculation - now available in hcana (see Samip's 10 May 2018 email for more details)
374
** runs used in this analysis: 3423 with Q2=3.1 GeV2 and W=2.78 GeV
375
** Coincidence time spectrum shows peak separations >2 ns corresponding to different accelerator frequency
376
** Missing mass spectra: Kaon peak clearly visible, also see pions even after cuts
377
** Found that pions appear localized in phase space - seems to be due to end point in kinematic phase space
378
** *Next steps:*
379
*** Look for a run with kaon momentum closer to 3 GeV/c (aerogel threshold is ~3 GeV/c for kaons for n=1.015)
380 2 Richard Trotta
381 35 Stephen Kay
* Yield normalized ratios from SIDIS (Hem)
382
** Yield ratios of data to MC match well in shape, but normalization seems not quite right
383
** *Next steps:*
384
*** Check if efficiencies, currents, run time etc. are taken into account correctly
385 4 Richard Trotta
386
----
387
388 35 Stephen Kay
h2. April 26, 2018
389 4 Richard Trotta
390 35 Stephen Kay
*Links to talks->* "Richard,":https://redmine.jlab.org/documents/18 "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/25
391 4 Richard Trotta
392 35 Stephen Kay
* Discussion luminosity scan analysis (earlier scan) - Richard
393
** Shown is a scaler-based analysis using scalers from report file and from ROOT tree - the values are different, why that is has to be checked
394
** Notes on efficiencies in report file:
395
*** DT (EDTM) is not electronic deadtime. Instead use for now 50ns* trigger rate for HMS and 100ns* trigger rate for SHMS
396
*** Cherenkov efficiency seems low (check if that is due to PID, thresholds, pi/e, etc)
397
*** Tracking efficiency needs to be checked
398
*** 3/4 trigger efficiency seems ok
399
* Discussion luminosity scan analysis (later scan) - Ryan
400
** Fewer carbon runs than earlier scan
401
** Shown is a tracking-based analysis using data from the ROOT trees
402
** First results for carbon, LH2, and LD2, but efficiencies need to be checked
403
* SIDIS analysis - Hem
404
** Shown is a data/MC comparison for different kinematic settings. Agreement in shape is very good. Normalization has yet to be applied.
405
** Discussion about agreement in z and apparent offset - relation of this offset with spectrometer offset
406
* Analysis of exclusive events in SIDIS - Samip
407
** Shown is a look at the first kaon events in exclusive limit of SIDIS data
408
** Ongoing work on implementing coincidence time into tree
409
* Discussion of run plan, and in particular possible low Q2/low energy
410
** Assume that kaon low Q2=0.4 already included - have kinematics with specified beam energies, if needed
411
** For pion form factor and LT, have two possible settings that can use the prescribed beam energies: Q2=1.45 and 0.35 GeV2 - prioritize towards the higher Q2 as not as sensitive to offsets
412
** Garth will put this together in a draft email
413
414 12 Richard Trotta
----
415
416 35 Stephen Kay
h2. March 29, 2018
417 12 Richard Trotta
418 35 Stephen Kay
*Links to talks->* "Richard, ":https://redmine.jlab.org/documents/16 "Samip":https://redmine.jlab.org/documents/27
419 13 Richard Trotta
420 35 Stephen Kay
* Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja)
421
* Luminosity scans (Ryan, Andres, Richard, Pete)
422
* Macros, SIDIS analysis (Hem, Anashe)
423
* Elastic data (TBD)
424
425 14 Richard Trotta
----
426 18 Richard Trotta
427 35 Stephen Kay
h2. February 22, 2018
428 18 Richard Trotta
429 35 Stephen Kay
*Links to talks->* "Andres":https://redmine.jlab.org/documents/19
430 18 Richard Trotta
431 35 Stephen Kay
*  Discussion of Andres' slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing.
432
* Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics
433
* Discussion of Richard's slides on run plan kinematics and preparations -
434
** everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics
435
** before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations
436
** for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group
437
** kinematics plots W-Q2 show that still need to do some optimization
438
** run sheets: include raster size, update coincidence count labeling, and carbon target labeling
439
* Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time.
440 26 Richard Trotta
441 35 Stephen Kay
* *Action Items:*
442
** Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja)
443
** Update run sheet and kinematic optimization for W/Q2 (Garth)
444
** Circulate elastic calculations for kinematic settings (Samip)
445
** Continue investigation of elastic data and run plan kinematics (Andres/Richard)
446
** Test software installation instructions (Pete)
447
** Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja) 
448 32 Stephen Kay
449
----