Wiki » History » Version 1
Richard Trotta, 05/07/2018 12:27 PM
| 1 | 1 | Richard Trotta | h1. Notes from Meeting February 22, 2018 |
|---|---|---|---|
| 2 | |||
| 3 | * Discussion of Andres's slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing. |
||
| 4 | *Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics |
||
| 5 | * Discussion of Richard's slides on run plan kinematics and preparations - |
||
| 6 | ** everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics |
||
| 7 | ** before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations |
||
| 8 | ** for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group |
||
| 9 | ** kinematics plots W-Q2 show that still need to do some optimization |
||
| 10 | ** run sheets: include raster size, update coincidence count labeling, and carbon target labeling |
||
| 11 | * Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time. |
||
| 12 | |||
| 13 | |||
| 14 | * *Action Items:* |
||
| 15 | ** Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja) |
||
| 16 | ** Update run sheet and kinematic optimization for W/Q2 (Garth) |
||
| 17 | ** Circulate elastic calculations for kinematic settings (Samip) |
||
| 18 | ** Continue investigation of elastic data and run plan kinematics (Andres/Richard) |
||
| 19 | ** Test software installation instructions (Pete) |
||
| 20 | ** Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja) |
||
| 21 | |||
| 22 | h1. Notes from Meeting March 29, 2018 |
||
| 23 | |||
| 24 | * Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja) |
||
| 25 | * Luminosity scans (Ryan, Andres, "Richard":https://redmine.jlab.org/documents/16, Pete) |
||