h1. Daily Reports
2
3 24 Xiaochao Zheng
*run plan document on [[https://docs.google.com/document/d/1Bmag_YPrl1szxLhYyA4eLUP2PV_pM0x51pHbeCj2hL4/edit?usp=sharing]]*
4 37 Xiaochao Zheng
*FTBF secondary beam composition at [[https://ftbf.fnal.gov/particle-composition-in-mtest/]]
5 54 Jixie Zhang
6 53 Jixie Zhang
|_. Current status|
7 58 Jixie Zhang
|_. Beam |_. time(h)  |_. run range  |_. trigger#|_. status    |
8
|Energy scan|8|  (804-822)              |        |        done |
9 62 Jixie Zhang
| 1GeV   | 24 |  (823-847), (1035-1056) |   3.1M |        done |
10 59 Jixie Zhang
| 6GeV   | 16 |  (848-857), (1062-1066) |   2.8M |        done |
11 62 Jixie Zhang
| 12GeV  | 24 |  (867-902)              |   2.9M |        done |
12 58 Jixie Zhang
| 16GeV  |  8 |  (924-944)              |   7.6M |        done |
13
| 2GeV   | 24 |  (945-969), (1057-1061) |   2.9M |        done |
14 62 Jixie Zhang
| 4GeV   | 24 |  (970-1011)             |   4.5M |        done |
15
| 8GeV   | 20 |  (1012-1033)            |   5.5M |        done |
16 61 Jixie Zhang
| 10GeV  |  8 |  (1066-1095)            |   6.8M |        done |
17 51 Jixie Zhang
18 62 Jixie Zhang
[[https://logbooks.jlab.org/files/2021/01/3864653/TriggerCounts.png]]
19 1 Xiaochao Zheng
*daily report 1/25/2021 -- by Jixie*
20 59 Jixie Zhang
21
#  Last day of beam time, will be ended by 20:00
22 62 Jixie Zhang
#  03:04 collected additional 3.0M triggers for 1 GeV
23 59 Jixie Zhang
#  05:26 collected additional 1.6M triggers for 2 GeV
24 1 Xiaochao Zheng
#  07:46 collected additional 1.5M triggers for 6 GeV
25 61 Jixie Zhang
#  07:56 started taking data for 10 GeV 
26
#  18:35 started taking calibration data for 10GeV
27
#  20:00 collected 6.8M triggers for 10 GeV.
28 60 Jixie Zhang
29 61 Jixie Zhang
We finished the experiment! 
30 1 Xiaochao Zheng
31 57 Jixie Zhang
*daily report 1/24/2021 -- by Jixie*
32
33
# Verified that the Cherenkov signal we connected to the FADC is really the raw signal, not the signal after DSC. No mistake was made. We were just misled by the noise.   (https://logbooks.jlab.org/entry/3864278)
34 50 Jixie Zhang
# Finished taking -8 GeV data. Run range is 1012-1033
35
# Started taking -10 GeV data. But MCR can not tuned the beam for us, only ~2000 per spill. Stopped after 2 hours of trial. 
36 55 Jixie Zhang
# Switched to take 1 GeV data. Only ~180 triggers per spill. Took data at this rate for 8 hours.
37 56 Jixie Zhang
# 8:20 PM, MCR has experienced crew at this shift. They tuned their machine to deliver ~3.5k triggers per spill. 
38
We will take data at -1 GeV/c till 3AM tomorrow then do another beam energy scan.
39 47 Jixie Zhang
# Scripts to do Cherenkov cut is ready 
40
41
*daily report 1/23/2021 -- by Jixie*
42
43 46 Jixie Zhang
# Finished taking data for -4 GeV by 8:25 AM, including calibration data. Run range is 970-1012.
44 42 Jixie Zhang
# Working on making auto logentry from soliddaq, need to install certification   
45 1 Xiaochao Zheng
# Found Cherenkov signal, they are much smaller than their noise. Use a timing cut can see them.   
46 47 Jixie Zhang
# MCR put a wrong angle on the septa which caused very low trigger rate. After they fixed this mistake we received 12k trigger per spill.
47 1 Xiaochao Zheng
# Fixed the internet problem of clrlpc
48 47 Jixie Zhang
# 8:30 AM: HVs are off and detectors are moved away from the beam line 
49
# 20:00 ATLAS group agree to exchange 2 day shifts with our 2 night shifts. From now on, we have 48 hours of beam time. 
50
Xinzhan, Manoj and Jixie will do 8-hours-shift rotation. We might need some help to do remote.
51
# Started taking -8 GeV data. 
52
# Beam spot for -8 GeV is 6x6, found a lot of pile up. Requested MCR to lower the beam intensity to ~9000 triggers per spill. 
53 41 Jixie Zhang
54 1 Xiaochao Zheng
55
*daily report 1/22/2021 -- by Jixie*
56 41 Jixie Zhang
57
# Continued taking data with -4 GeV
58 1 Xiaochao Zheng
# MCR took almost 4 hours to tune the beam to deliver from 600 triggers per spill to 1800 triggers per spill. This is 
59
also depend on who is on shift. We are losing a lot of potential triggers due to the fact that MCR have to switch beam
60 41 Jixie Zhang
between primary proton and secondary electron. 
61
# continued studying Cherenkov signal. We viewed signals in the oscilloscope, trying to find out the timing between 
62
Cherenkov signal and ftbf_trigger. 
63
# MCR took 2 hours to tune the beam to deliver 1800 trigger per spill in the event 
64
# clrlpc lost public internet connection. Jixie is working on it. 
65
# vnc server started in clrlpc (session :1), but only allow itself to visit. If a client wants to view this vnc, 
66 38 Jixie Zhang
two ssh tunnel and port forward must be done by the client. The network route is:  client -> soliddaq -> clrlpc.
67
68
69
*daily report 1/21/2021 -- by Jixie*
70 35 Jixie Zhang
71 38 Jixie Zhang
# taking 4 GeV data  
72 1 Xiaochao Zheng
# MWPC2 still have same dead wires, Evan will replace readout chips in daytime during beam is off. 
73 35 Jixie Zhang
# Beam is off from 6 AM, 
74 38 Jixie Zhang
# MWPC decode program is ready to write raw data and reconstructed hit into root tree
75
# Turned HV off, lower the detector from beam line to avoid hitting by 120 GeV proton beam in daytime
76 36 Jixie Zhang
77 35 Jixie Zhang
# Possible impact from the ATLAS group, who are taking day beam time (1/20 ~1/27) to test their 'telescope detectors'. 
78
## Their setup includes 3 silicon detectors in a row then one center detector then another 3 silicon detectors in a row. 
79
## The silicon detectors have a 4x4 cm window. The window frame is 3/4 inches thick aluminum. 
80 1 Xiaochao Zheng
## Their center detector is an aluminum box (about 1cm for the wall thickness) has a 2x2 inches window to allow beam pass through. 
81 35 Jixie Zhang
## The sensor of the center detector is 1x1 mm only, therefore they have to align the sensor to the beam line carefully. They want to stay in the beam line for the whole week in order to avoid position alignment (cost ~2 hours each time). If they push their setup away from the beam line, they need to redo the position alignment. 
82 1 Xiaochao Zheng
## We are taking 4, 8 and 10 GeV data this week. The beam spot size is as large as 12 x 12 cm for 4 GeV. We have to ask ATLAS group to push their setup away from beam line during 4 GeV data taking. From 8 and 10 GeV, we might let them keep only the center detector in the beam line, removing all other 6 silicon detectors.
83 38 Jixie Zhang
84 1 Xiaochao Zheng
## Updated: ATLAS group want to stick with the original plan, we will request them push their detector away from the beamline
85 38 Jixie Zhang
86
# Evan confirmed that we were connecting the Cherenkov logical signal after the discriminator. We changed these 3 channels to the raw signal from PMT.
87
We found that the upstream Cherenkov is saturated, we lower its HV from 1700 to 1640 
88
# Continued studying the Cherenkov signal 
89 35 Jixie Zhang
# Had control access twice to replace MWPC1 readout chips 
90 38 Jixie Zhang
91 35 Jixie Zhang
92
*daily report 1/20/2021 -- by Jixie*
93 32 Jixie Zhang
94 38 Jixie Zhang
# Our beam time changed to night time from today: from 8PM to 8AM next day.
95 1 Xiaochao Zheng
# MWPC2 will be swapped in day time (too many dead wires)
96 34 Jixie Zhang
# Beam was off from 7 AM, expect to be back by 6 PM
97
# Ecal decode program was modified to remove unused branches
98
# Finished taking 2 GeV data by 23:35
99 38 Jixie Zhang
# Started taking 4 GeV data, plan to take 24 hours
100 32 Jixie Zhang
# Started look into Cherenkov signal, it has only one single peak in the FADC it seem like a logical signal after the discriminator 
101
102
103
*daily report 1/19/2021 -- by Jixie*
104
105
# Production data of 16 GeV started from run 930, which is launched at 00:30 (AM).
106
# Finished taking 16 GeV data. 
107
# Started taking 2 GeV data from 08:45 AM, Plan to take 24 hours at this energy
108
# 2GeV beam spot is much worse than 16 GeV. MCR can do very little at this low energy  
109
# Requested MCR to push number of particle at MT6SC1, it can reach 40K.  Trigger counts per spill is about 1300
110 25 Jixie Zhang
# Got confirmed from Evan that MWPC2 will be swapped in Wednesday day 
111 26 Jixie Zhang
112 1 Xiaochao Zheng
*daily report 1/18/2021 -- by Jixie*
113 26 Jixie Zhang
114 28 Jixie Zhang
# Finished taking 12 GeV data including calibration data(903,904,905). Run range is 867-905
115 26 Jixie Zhang
# Started taking 16 GeV data. HVs for this energy were determined. We plan to take 8 hours of data, plus 1 hour calibration. 
116
# Calibration data for 16 GeV are ready(run 924-929). 
117 1 Xiaochao Zheng
# Requested MCR to control the beam spot size to 6 cm diameter. After that we determine the new coordinate of the center of the 3 Ecal modules.
118 26 Jixie Zhang
119 1 Xiaochao Zheng
*daily report 1/17/2021 -- by Jixie*
120 26 Jixie Zhang
121
# Automation on logentry works now. More and more analysis scripts are ready to use
122
# Finished taking 6 GeV data, run number range is 848 - 866
123
# All beam energy of <=8 GeV will use 8GeV HV setting. Finihsed taking calibration data (run 853,854,855) for this setting.  
124
# 16 GeV beam is available, and its trigger rate can reach 15K per spill, which is almost 10 times at all lower energies. We could not take this beam energy until a 3rd HV module is set up. 
125
# Started taking 12 GeV data from ~2PM. The plan is to take 24 hours of data, plus 2 hours of calibration data. 
126
# Motion table position is optimized to let the beam hit the center of 3 blocks.
127
# scripts for backing up data and transfer data to JLab volitile is ready. Data will be backed up several time a day.
128 1 Xiaochao Zheng
129
*daily report 1/16/2021 -- by Jixie*
130 26 Jixie Zhang
131
# Beam energy scan was finished on Jan 15, HV for each beam energy are determined 
132
# Finished 24 hours of 1 GeV data taking using 8GeV HV setting. We forgot to change it back. Since detector is not saturated, do not bother to change it. Run number range is 823 - 847.
133
# Start 6 GeV data taking by run number 848. Plan to take 18 hours of data.
134
# Working on making automatic start|end of run log entry.  
135
# MWPC decoder and analysis program works. beam spot size is huge (9cm x 8 cm). 
136 21 Xiaochao Zheng
137
*daily report 1/15/2021 -- by Xiaochao from far away*
138
139 22 Xiaochao Zheng
# good gracious, we keep getting 24 hours a day
140
# we should keep our dialy work hours below 16 and stretch shifts to 8 hours  
141
# rate scan is done up to 12 GeV energy. And we are now taking 1 GeV data
142
# the trigger is from FTBF's 3 scintillator paddles coincidence with the spill signal. FTBF's 2-chamber Cherenkov signals are not in the trigger but are in our FADCs.
143 1 Xiaochao Zheng
# MWPC has problems: 1 was fixed today (hardware) and both are working and online, daq is working and synced with our daq. But the software is missing a library so we can't decode the data. 
144 23 Xiaochao Zheng
# According to David's post on Slack:
145
146
> David Flay 2:20 PM
147
> ok, using the rates above, I find for our remaining 11 days:
148
> 2:20
149
> E = 12.0 GeV, numShifts = 1.3, totEvt = 16356343
150
> E = 10.0 GeV, numShifts = 0.8, totEvt = 16356343
151
> E = 8.0 GeV, numShifts = 0.7, totEvt = 16356343
152
> E = 6.0 GeV, numShifts = 0.8, totEvt = 16356343
153
> E = 1.0 GeV, numShifts = 14.7, totEvt = 16356343
154
> E = 2.0 GeV, numShifts = 2.5, totEvt = 16356343
155
> E = 4.0 GeV, numShifts = 1.2, totEvt = 16356343
156
> 2:21
157
> clearly that 14.7 shifts doesn’t make sense.
158
> David Flay 2:27 PM
159
> I think it checks out;
160
> 2:27
161
> Total time: 264.0 hrs
162
> E = 12.0 GeV, weight = 0.061, time = 16.1 hrs, numShifts = 1.3, totEvt = 16356343
163
> E = 10.0 GeV, weight = 0.038, time = 10.0 hrs, numShifts = 0.8, totEvt = 16356343
164
> E = 8.0 GeV, weight = 0.032, time = 8.5 hrs, numShifts = 0.7, totEvt = 16356343
165
> E = 6.0 GeV, weight = 0.038, time = 9.9 hrs, numShifts = 0.8, totEvt = 16356343
166
> E = 1.0 GeV, weight = 0.666, time = 175.9 hrs, numShifts = 14.7, totEvt = 16356343
167
> E = 2.0 GeV, weight = 0.112, time = 29.5 hrs, numShifts = 2.5, totEvt = 16356343
168
> E = 4.0 GeV, weight = 0.053, time = 14.0 hrs, numShifts = 1.2, totEvt = 16356343
169
> Totals:
170 1 Xiaochao Zheng
> Time = 264.0 hrs
171 21 Xiaochao Zheng
> Shifts = 22.0
172 20 Xiaochao Zheng
> 
173
174
*daily report 1/14/2021 -- by Xiaochao from far away*
175
# beam started sometime in the evening. 
176
# we got the night time beam as a bonus - the other group does not need it - causing us to scramble the shift schedule. Paul Reimer came in for the night shift, until 3am - thanks!
177 26 Jixie Zhang
# by midnight, we are sending beam to center of each block, trying to adjust HV/gain-match;
178 20 Xiaochao Zheng
# Jixie adjusted Cherenkov pressure around 10pm. Previously the two chambers were set at 4.0 and 0.2 psia, respectively. I think Jixie lowered one of them from 4.0 to 0.8
179
180
_To do:_
181
# complete gain/HV-matching of the 3 shashlyk modules
182
# center beam at the middle of the 3-block (a little off-center may be ideal, better than at the exact center) and do energy scan over night to figure out rates
183
# David will rework the runplan during the day
184 1 Xiaochao Zheng
# One of the MWPC is broken, will be installed during the day
185
186
*Jixie  9:04 PM
187
daily report 1/13/2021*
188
A busy and tired day! At least our DAQ is ready to take beam with our own trigger!
189
# Start installation from 7AM. Finished installing detectors and cabling by 1PM
190
# Put the rack in the control room so no access needed for daq work. Our daq machines are also in the control room.
191
# David came to site. Help a lot in setting up computers. Xinzhan and I are working on detectors and daq cabling. Both desktops are online. CODA runs well.
192
# Operational Readiness Clearance (ORC) meeting started from 1 PM. Detectors are all good. However, JLab made VME cards were suggested to change fuse at the beginning...... After some long negotiation, we were requested to put kapton tape to cover the power interface. We also received some suggestions to run the experiment safely. We might get all signature by tomorrow
193
# We connected HV and signal cables to the patch panel. All PMT signals have been checked using an oscilloscope. All detectors work well. We do not have enough time to modify daq to take the FTBF trigger. FTBF has 3 channels for Cherenkov, none of them add into our FADC yet. (Need to find cable and do fan in fan out...) MWPC daq does not have a veto input, it can not take our busy status immediately. We have to form a new trigger then feed it. We will do this in the morning of Thursday.
194
# Accelerator is down. One magnet is not functioning. They are waiting for the radiation to cool down so they can fix it tomorrow morning. Beam might be available in the afternoon.
195
196
_To do:_
197 33 Jixie Zhang
# Do FTBF controlled access leader training in Thursday morning 9AM
198 1 Xiaochao Zheng
# MWPC daq is a well integrated machine (looks like a laptop). It does not provide L1A signal. We need to learn deep about this system to find out a possible way to take their L1A. We will then veto it using out busy status. Need to spend time here Thursday.
199
# connect cherenkov into our FADC.
200 2 Alexandre Camsonne
201 8 Alexandre Camsonne
Pictures under useful pictures with prefix 20200113_xx
202 12 Xiaochao Zheng
203 1 Xiaochao Zheng
204 13 Xiaochao Zheng
!{width:20%}https://redmine.jlab.org/attachments/download/1159/IMG_20210113_085123.jpg! !{width:20%}https://redmine.jlab.org/attachments/download/1160/IMG_20210113_160026.jpg! !{width:20%}https://redmine.jlab.org/attachments/download/1161/IMG_20210113_141747.jpg! !{width:20%}https://redmine.jlab.org/attachments/download/1162/IMG_20210113_141726.jpg! 
205 12 Xiaochao Zheng
206 13 Xiaochao Zheng
!{width:20%}https://redmine.jlab.org/attachments/download/1163/IMG_20210113_121019.jpg! !{width:20%}https://redmine.jlab.org/attachments/download/1164/IMG_20210113_120704.jpg! !{width:20%}https://redmine.jlab.org/attachments/download/1165/IMG_20210113_120825.jpg! 
207 9 Xiaochao Zheng
208
!{width:20%}https://redmine.jlab.org/attachments/download/1166/IMG_20210113_120735.jpg! !{width:20%}https://redmine.jlab.org/attachments/download/1167/IMG_20210113_115807.jpg! !{width:20%}https://redmine.jlab.org/attachments/download/1168/IMG_20210113_090032.jpg! 
209
210
*Jixie  8:02 PM daily update 1/12/2021*
211
# Took radiation practical training, both of Jixie and Xinzhan
212
# Met Lorenzo, have a long and deep conversation with him. He helped us setting up the gateway machine, which is soliddaq. Right now solidaq has 2 network interfaces, one of them is borrowed from FTBF.  soliddaq can access the public network, it also serves as the gateway of the private network. Because IP forward function is not enabled, right now private network members can not access public networks yet. (I need help from an expert to enable this.)
213
# If you want to access to clrlpc, you have to access to solidaq using fermilab linux account, then ssh from soliddaq into clrlpc using a-compton account. If you want to do that, send me your fermilab username. I can add your username into the name lists that allows you to login soliddaq using a-compton account.
214
# David brought the hard drive and pcie to usb3.1 convert card here. Two 5T hard drive (2.5") were installed into the usb hub provided by Alex. Tested the data transfer speed. It can reach 130MB/s when the CPU is idle. Data transfer speed changes a lot when coda is running. 
215
# JLab experts are working on DSC issues. The Fan-In-Fan-out module degrades the input signal too much, which is part of the reason that DSC lost signal.  We borrowed one from FTBF.  JLab experts are also checking and fixing the software.  Right now we can see TDC in the output file. Alex is still working on it to make sure it does not lose data.
216
# David is working on ORC form.
217
       
218
_Here is how we transfer data back to jlab:_
219 10 Xiaochao Zheng
# make a copy of data into soliddaq, this copy will also be our backup of all raw data
220 9 Xiaochao Zheng
# sent data from soliddaq to jlab
221
222
_To Do:_
223
# The beam will be off by 6AM Wednesday. We will start installation from 7 AM. We aim to finish cabling and installation by 1 PM.
224 14 Xiaochao Zheng
# ROC inspection is scheduled at 1 PM Wednesday. I will show in person. David will join remotely.
225
# The beam is scheduled to be delivered by 5:30 PM.  Look forward to taking beam! (edited) 
226
227
228
229
*Jixie  9:03 PM daily report, 1/11/2021*
230
# Put all our computers into a private network switch, use ip 192.168.1.x, reserve IP 192.168.1.1 for the gateway. All computers can talk to each other. Still waiting for FTBF to provide a gateway. Talked to Evan and Lorenzo. They understanded our request and will set up one tomorrow.
231
# Rebooted vme crate.. The hostname 'intelvmeha8' came back. Start and stop coda smoothly, no need to manually start ROC2.
232
# DSC did not write data to the output file. Experts at Jlab are working on this.
233
# Talked to Evan about MWPC daq. Learned that we can easily take their trigger, which is SC1&SC2 (both stay at FTBF beam line). We decided to take the L1A signal from MWPC daq to be our trigger. In this way the events from our daq are already synchronized with MWPC daq. We will also put our SCs into the FADC, they just do not serve as triggers anymore. We will also plug Cherenkov signal into our FADC. We will also put a copy of MWPC daq's L1A into our TDC.
234
# David is preparing the ORC document
235
# Had a meeting with Lorenzo, we agreed to start shift at 8 AM|PM.
236
# install kerberos kit in clrlpc. We will not use it during data taking but can use it if needed. Only people with a Fermilab linux account can access it.
237
# taped the lead block.
238
239
_ To Do:_
240
# get a gateway
241
# solve DSC
242
# look at raw data file of MWPC daq, try to understand their daq
243 15 Xiaochao Zheng
244 14 Xiaochao Zheng
245
*Jixie  10:15 PM daily report 1/10/2021*
246
# pause daq data taking to test 3 preshowers.  They are all good
247
# continued testing TDC  configuration. Looked at TDC signal in raw data file.   improving/updating coda and decode program under the guidance of Alex.
248
# taking cosmic data.  right now daq machine clrlpc is offline
249
250
_To Do:_
251
# finish setting up private network
252
# tape the lead block
253 16 Xiaochao Zheng
# practice sending data back to jlab
254 17 Xiaochao Zheng
# take training on Tuesday
255
256
*Jixie  6:59 PM daily report 1/9/2021*
257
# Finished installing kerberos kit into soliddaq desktop (the backup one)
258
# zoom meeting with Alex, we are now able to run coda only if we do not follow Fermilab kerberos ssh requirements. A trick is that we used jlab configuration to start coda and all rocs, when coda runs we switch to fermilab configuration. This is not a solution! We have to put daq into a private network.
259
# Found a 1000Mbps switch and several cat5e cables. Cat5e cable's speed can reach 1000 Mbps, while cat6's is 10Gbps. Will be better if there are enough cat6 cables. Plug 2 laptops into the switch, manually specify IP and gateway, 2 laptops can talk to each other. I tried to set up my laptop (windows10) as the gateway and using WIFI to connect to the fermilab public network. Failed!
260
261
Our solution will be: soliddaq, clrlpc, intelvmeha8 will be in a private network.
262
* Ask Fermilab to provide a gateway. (The backup daq machine must be identical to the main daq machine.
263
* To transfer data to JLab, I will send data using the backup daq to Jlab work disk.
264
* Alex, please help me to find out which disk I can write raw data to, total space no more than 14T.
265
266
_To Do:_
267
# Request FTBF to provide a gateway, finish setting up the private network
268
# CODA roc2 need to be start manually, need to fix that
269
# work out a script to transfer data
270 18 Xiaochao Zheng
# waiting for HA approval then tape the lead
271
# test preshowers when a 2nd HV module is available. (edited) 
272
273
274
*Jixie  10:22 PM daily update 1/8/2021*
275
# both desktops got blocked because password authority is not allowed.   Solved it  after reconfigured sshd_config file.
276
# applied host principles for both desktops.  Got password in the afternoon but have typed a wrong host name for the main daq machine.  Reapplied and now waiting for supervisor's approval. The backup machine (soliddaq) is ready to install kerberos kit but do not have time to do it.
277
# connected daq system.  hooked SCs and Ecals into daq.  viewed trigger signals.  ready to take cosmic data.  Preshowers are not connected yet.
278
# hooked vme directly to clrlpc,  configured them to talk to each other.  2 machines can talk now.
279
# Alex helped thought zoom meeting.  After some modifications,  Alex can run coda to take events.  But I could not run it by myself because some configuration changes that  Alex did might not be saved.
280
# Paul came to help.  We are trying to solve the network issue.   Desktop clrlpc has a puppet service to overwrite sshd_config frequently.  Therefore all my modifications is gone.  We have to solve it ASAP otherwise this machine will be blocked again once the Fermilab robot catches it.
281
Service puppet was temporary disabled. 
282
# Rearranged detectors such that 2 SCs and Ecals are in the same line.
283
#  My laptop got blocked due to use X11 service......
284
285
_To Do:_
286
# Install kerberos kit
287
# configure coda
288 19 Xiaochao Zheng
# test preshowers
289
# tape the lead plate (edited) 
290
291
*Jixie  8:42 PM daily report 1/7/2021*
292
# installed both the nim and the vme crates onto a movable rack
293
# learned how to use FTBF's HV module.  This module can only supply HV in range from the set point subtract 580V  to the set point.  For example,  If a set point is 2500V,  the HV range is 1920-2500.  In our case,  we need to set ecal at 900V,  SC at 1300V, and preshowers at 2100V.  We have to use two HV module.
294
# We look at the signals for all 3 ecal and 2 SC.  We didn't damage them during the bumpy driving.  The signals looks good.
295
# We installed 3 ecal modules into the tray. Carefully addjust their positions to make sure them attach to each other tightly.
296
# registered both desktops, clrlpc and soliddaq, to Fermilab public network.  The latter is a back up for daq machine.   Both of them are now online.   If you have a computer account of Fermilab,  you can ssh to it using account a-compton.
297
298
_To do:_
299
# test preshower detectors
300
# applying a computer account so I can access daq machine from apartment
301 1 Xiaochao Zheng
# connect daq system to detectors
302
# tape the lead plate after HA got approved (edited)