Project

General

Profile

HV map » History » Revision 2

Revision 1 (Jixie Zhang, 12/31/2020 05:44 PM) → Revision 2/5 (Jixie Zhang, 01/23/2021 07:21 AM)

h1. HV map 

 This figure shows how each detector is connected to fadc and HV crate (at jlab).   


 h1. HV map for FTBF beam test 

 HV for FADC channel 0 to 7: 
   SC1     SC2 Ecal1 crate.    Ecal2 Ecal3    PrSh1    PrSh2    PrSh3 
 -1260 -1280    -760     -860    -880    -1640    -1480    -1800    <--    1~8GeV 
 -1260 -1280    -720     -820    -840    -1640    -1480    -1800    <--    8~12GeV  
 -1260 -1280    -600     -680    -720    -1640    -1480    -1760    <-- 12~16GeV  



 This setting was also used for some 1GeV calibrations  
 -1260 -1300    -880     -920    -940    -1640    -1440    -1800    <--    <1GeV