HV map¶
This figure shows how each detector is connected to fadc and HV crate (at jlab).
HV map for FTBF beam test¶
HV for FADC channel 0 to 7:
  SC1   SC2 Ecal1  Ecal2 Ecal3  PrSh1  PrSh2  PrSh31260 -1280  -760   -860  -880  -1640  -1480  -1800  <<-  1~8GeV1260 -1280  -720   -820  -840  -1640  -1480  -1800  <<-  8~12GeV 1260 -1280  -600   -680  -720  -1640  -1480  -1760  <<- 12~16GeV
This setting was also used for some 1GeV calibrations 1260 -1300  -880   -920  -940  -1640  -1440  -1800  <-  <1GeV