Project

General

Profile

Actions

Run Plan and Projected Event Rates

The overview of beam energies as distributed across each shift are shown below

The electron rates, scaled down by the duty factor (1/(4.2*60)) is shown below. Note: Our first shifts on 1/14/21 are telling us that we have overestimated these rates my many orders of magnitude. Current data rates are ~30 Hz (instantaneous).

The full run plan is posted in the attachment below.

Updated by David Flay almost 4 years ago · 6 revisions