Run list » History » Revision 20
Revision 19 (Jixie Zhang, 01/01/2021 07:05 PM) → Revision 20/24 (Jixie Zhang, 01/01/2021 07:37 PM)
h1. Run list
500
501 DAQ crashed
502 short run threshold check
503 threshold check
512 better threshold check 1500 V on scintillators
513 long cosmics run
514 new run but bad thresholds no event, trigger was added into fadc channel 9
HV from channel 0-7 are: 1300, 1250,1000, 1000, 1050, 2050, 1850, 2000
515 run with new HV and thresholds
HV from channel 0-7 are: 1300, 1250,1000, 1000, 1050, 2050, 1850, 2000
516
517 increase HV for channel 1 and 7:
HV from channel 0-7 are: 1300, 1300,1000, 1000, 1050, 2050, 1850, 2050
518 Changed latency from 100 to 60. Ensuing decoded run showed an error:
@
Couldn't find block level !
ERROR getting FADC slot 7 block header
ERROR fadc slot 7 event data length -1 <= 0
@
519 Aborted. Reset latency to 100.
520 New run with latency set to 100. Stopped to check quality on decoding; looks good.
521 12-29-20 15:22 Tue New run started
522 12-31-20 17:40, Jixie increased preshower HVs
HV from channel 0-7 are: 1300, 1300,1000, 1000, 1050, 2150, 1950, 2150
523 12-31-20 18:36, Jixie increased preshower3 HV to 2250
HV from channel 0-7 are: 1300, 1300,1000, 1000, 1050, 2150, 1950, 2250
524
525 01-01-21 :connected preshowers to pre-amplifier, set HV as the following:
HV from channel 0-7 are: 1400, 1300,1000, 1000, 1050, 2050, 1850, 2050
526 01-01-21: lower HV of SC1 by 50V:
HV from channel 0-7 are: 1350, 1300,1000, 1000, 1050, 2050, 1850, 2050
527 01-01-21 18:10
528 01-01-21 19:04
529 01-01-21 19:34 adjusted HV for ECal, and channel 7
HV from channel 0-7 are: 1350, 1300,950 , 960, 1000, 2050, 1850, 2100