Runlist » History » Version 15

Alexandre Camsonne, 01/15/2021 05:49 AM

1 8 Jixie Zhang
1. Runlist
2 1 Alexandre Camsonne
3 8 Jixie Zhang
beam hit the edge of top Ecal
4
New HV is: 1260, 1300, 920, 960, 940, 1940, 1780, 2100
5 1 Alexandre Camsonne
Run     
6
777  First run - MWPC trigger - 
7
8 8 Jixie Zhang
New HV is: 1260, 1300, 920, 960, 940, 1840, 1680, 2000
9
783 Preshower channels set to 2V range in FADC
10 5 Alexandre Camsonne
11 8 Jixie Zhang
784 TS1 and TS2 - move detector position so beam is hitting the center of three ECals
12
785
13
New HV is: 1160, 1200, 820, 860, 840, 1840, 1680, 2000 
14 7 Alexandre Camsonne
786 TS1 only - beam centered on calorimeter
15
16 8 Jixie Zhang
New HV is: 1260, 1300, 820, 860, 840, 1740, 1580, 1900
17
787 lower HV on preshower
18 9 Alexandre Camsonne
19
788
20
21
792
22 10 Alexandre Camsonne
23
reduce 100 V more on preshower
24 11 Alexandre Camsonne
25 12 Alexandre Camsonne
793 short run PEB1 crashed
26
27
switch to FADC only config TiIntelvmeha8
28
29
795 
30 13 Alexandre Camsonne
31 15 Alexandre Camsonne
Changing down stream Cerenkov N2 pressure
32 13 Alexandre Camsonne
33 1 Alexandre Camsonne
796   Top block 
34 15 Alexandre Camsonne
35
36
800 beam on the center of the left block, point B
37
801
38
802 beam on the center of the right block, point C
39
40
803 beam on the center of the top block, point A
41
42
804 beam on the center of 3 modules
43
44
805 2GeV, beam on the center of 3 modules