Actions
April 2th 2026
- Updates
- GEM
- gas is flowing
- checked APVs, one idaho backplane might have issue ( potentially 3 bad ones ) - ideally need 6 2-slot backplanes, UVA pixels and different space - 8 x 1 slot but still need to make adapters - maybe will check with electronics group if they can make adpaters
, other GEMs - check idaho backplanes should have enough ( 2 UVA chambers - Florian comes - 2 backplanes from Florian - one good idaho backplane + 2 fixed )
- will try to look at signal this afternoon
- MPOD control with command line possible
- need to make LV adapter for MPOD LV - need to check if DAC HCAL box could work
- need to figure SRS
- buy microHMDI cables or adapters : 10 to 12$ on New Eggs
- Detectors
- being worked on by Todd next week
- will use ECal block for cosmics
- DAQ
- trying to take cosmics with GEM
- setup VTP FADC crate in ESB
- Lecroy : needed for ECal, can use MPOD for now
- will work on FADC trigger when back from break
- MRPC
- need detector to GRINCH NINO adapter
- need vfTDC setup
- April 13th access
- set up MPD and VTP
- set up FADC
- put HV and LV crates
- installation May 25th
- detector installation
- small angle end of July
- move bunker and move to small angle
- GEM
- gas is flowing
- checked APVs, one idaho backplane might have issue ( potentially 3 bad ones ) - ideally need 6 2-slot backplanes, UVA pixels and different space - 8 x 1 slot but still need to make adapters - maybe will check with electronics group if they can make adpaters
, other GEMs - check idaho backplanes should have enough ( 2 UVA chambers - Florian comes - 2 backplanes from Florian - one good idaho backplane + 2 fixed ) - will try to look at signal this afternoon
- MPOD control with command line possible
- need to make LV adapter for MPOD LV - need to check if DAC HCAL box could work
- need to figure SRS
- buy microHMDI cables or adapters : 10 to 12$ on New Eggs
- Detectors
- being worked on by Todd next week
- will use ECal block for cosmics
- DAQ
- trying to take cosmics with GEM
- setup VTP FADC crate in ESB
- Lecroy : needed for ECal, can use MPOD for now
- will work on FADC trigger when back from break
- MRPC
- need detector to GRINCH NINO adapter
- need vfTDC setup
- April 13th access
- set up MPD and VTP
- set up FADC
- put HV and LV crates
- installation May 25th
- detector installation
- small angle end of July
- move bunker and move to small angle
Updated by Alexandre Camsonne 3 days ago · 5 revisions