Project

General

Profile

April 2th 2026 » History » Revision 3

Revision 2 (Alexandre Camsonne, 04/02/2026 01:20 PM) → Revision 3/5 (Alexandre Camsonne, 04/02/2026 01:21 PM)

h1. April 2th 2026 
 * Updates 
 ** GEM 
 *** gas is flowing 
 *** checked APVs, one idaho backplane might have issue ( potentially 3 bad ones ) - ideally need 6 2-slot backplanes, UVA pixels and different space - 8 x 1 slot but still need to make adapters - maybe will check with electronics group if they can make adpaters  
 , other GEMs - check idaho backplanes should have enough ( 2 UVA chambers - Florian comes - 2 backplanes from Florian - one good idaho backplane + 2 fixed ) 
 *** will try to look at signal this afternoon 
 *** MPOD control with command line possible 
 *** need to make LV adapter for MPOD LV - need to check if DAC HCAL box could work 
 *** need to figure SRS   
 *** buy microHMDI cables or adapters : 10 to 12$ on New Eggs  
 ** Detectors 
 *** being worked on by Todd next week 
 *** will use ECal block for cosmics 
 ** DAQ 
 *** trying to take cosmics with GEM 
 *** setup VTP FADC crate in ESB 
 *** Lecroy : needed for ECal, can use MPOD for now 
 ** MRPC 
 *** need detector to GRINCH NINO adapter 
 *** need vfTDC setup  
 ** installation May 25th 
 ** small angle end of July