Project

General

Profile

Actions

April 30th 2026 » History » Revision 4

« Previous | Revision 4/6 (diff) | Next »
Alexandre Camsonne, 04/30/2026 01:19 PM


April 30th 2026

  • Updates
    • GEM
      • DAQ running, found GEM latency for UVA
      • Jerry will come drill holes on Monday - need to clean up the table
      • 1 UVa, 1 uRWell
      • check with Harsh for VMM
    • Hall C
      • 2 crates installed with CPU, VTP , SD and TI, but still need to put on network and boot
      • May 25th installation
    • PMTs
      • ECal : 1 block - finishing test of last PMT and will install
      • scintillators are back : ready to install and test -
      • preshower in WN still being worked
      • 2 independent config + 1 with both crates
    • Look for switch for Hall C from Hall A
    • MRPC
      • starting to look at design of adapter

Updated by Alexandre Camsonne 8 days ago · 4 revisions