h1. April 30th 2026
* Updates
** GEM
*** DAQ running, found GEM latency for UVA
*** Jerry will come drill holes on Monday - need to clean up the table
*** 1 UVa, 1 uRWell
*** check with Harsh for VMM
** Hall C
*** 2 crates installed with CPU, VTP , SD and TI, but still need to put on network and boot
*** May 25th installation
** PMTs
*** ECal : 1 block - finishing test of last PMT and will install
*** scintillators are back : ready to install and test -
*** preshower in WN still being worked
*** 2 independent config + 1 with both crates
*** Alex will work on FADC trigger with Hayden
** Look for switch for Hall C from Hall A
** MRPC
*** starting to look at design of adapter