Actions
April 30th 2026¶
- Updates
- GEM
- DAQ running, found GEM latency for UVA
- Jerry will come drill holes on Monday - need to clean up the table
- 1 UVa, 1 uRWell
- check with Harsh for VMM
- get Hirose to APV 25 from Kondo
- get one slot backplane from Huong
- Hall C
- 2 crates installed with CPU, VTP , SD and TI, but still need to put on network and boot
- May 25th installation
- PMTs
- ECal : 1 block - finishing test of last PMT and will install
- scintillators are back : ready to install and test -
- preshower in WN still being worked
- 2 independent config + 1 with both crates
- Alex will work on FADC trigger with Hayden
- Look for switch for Hall C from Hall A
- MRPC
- starting to look at design of adapter
- GEM
Updated by Alexandre Camsonne 8 days ago · 6 revisions