December 10th 2020 » History » Revision 3
Revision 2 (Alexandre Camsonne, 12/10/2020 02:26 PM) → Revision 3/4 (Alexandre Camsonne, 12/10/2020 03:15 PM)
h1. December 10th 2020 * Ecal discussion ** DAQ running ** working on decoder to look at data ** will try PMTs from Alexandre to test preshower which is noisy ** Jixie plan to book the truck and lodging for beginning of year ** trying to find an adapter for MAPMT too ** David and Jixie will evaluate expected rates for different energies * Updates ** VMM *** Ben helped Ed for code for 1 gigE on developement board - know what to change to get it working - trying to get it done before Christmas break. Software from Ben available to read out data with a computer *** migration from 12 to 128 channels : could try 10 gigE link - can use 10 gigE directly since it is backward compatible *** will look at how to put board on detector and take data with source *** layout work with Jeff - will meet with Gianluigi at some point to have look on new design ** APV *** still simulation - can saturate VME bus in VME2eSST - and focusing on SBS TEDF setup for testing later *** will switch to VTP code after ( in January for ** FADC first and after SSP for MPD readout ) *** optical to VTP board for middle of December - can use the VTP front panel - ** FADC *** FADC code done and ready to be tested for VXS readout *** TI oscillator at 50 MHz *** summary from Hanjie https://redmine.jlab.org/attachments/download/1116/FADC_dt3%20(1).pdf