h1. February 26th 2026 

 * Updates 
 ** GEM 
 *** DAQ working  
 *** 1 GEM    UVA on site 
 *** gas system being assembled and 2 bottle of N2 arriving tomorrow 
 *** need HV for testing with detector ( Alex MPOD today or Friday)  
 *** need to coordinate when HV is on 
 *** did quick test with VMM in test lab, might have seen hint of signals, but noisy with self triggering, will try with external trigger, I got the software on laptop, need to try in ESB 
 *** need to put together cosmics triggers  
 *** uRWell on site, one UVA chamber  
 *** need check on hirose adapters -  
 *** backplanes : 2 x 2 backplanes from florian, 4 from Dustin, could use 5 slots if needed 
 *** need to design VMM frame  

 ** detector 
 *** needs to be put together, hardware to be ordered 
 *** take SHV patch from Hall A ? 

 ** Cerenkov 
 *** check if we have cable for the sum, could try to take cosmics 
 *** gas system : test ? 

 ** ARC DAQ setup 
 *** can take data  
 *** done with Cerenkov test 

 ** Hall C  
 *** can preinstall  
 *** VXS crates and cables 
 *** lock up March 20th