February 26th 2026¶
- Updates
- GEM
- DAQ working
- 1 GEM UVA on site
- gas system being assembled and 2 bottle of N2 arriving tomorrow
- need HV for testing with detector ( Alex MPOD today or Friday)
- need to coordinate when HV is on
- did quick test with VMM in test lab, might have seen hint of signals, but noisy with self triggering, will try with external trigger, I got the software on laptop, need to try in ESB
- need to put together cosmics triggers
- uRWell on site, one UVA chamber
- need check on hirose adapters -
- backplanes : 2 x 2 backplanes from florian, 4 from Dustin, could use 5 slots if needed
- need to design VMM frame
- GEM
- detector
- needs to be put together, hardware to be ordered
- take SHV patch from Hall A ?
- Cerenkov
- check if we have cable for the sum, could try to take cosmics
- gas system : test ?
- ARC DAQ setup
- can take data
- done with Cerenkov test
- Hall C
- can preinstall
- VXS crates and cables
- lock up March 20th