February 5th 2026
- Updates
- GEM
- test APVs : 60 good APVs passed low level, need to take pedestal runs
- talk to Florian for how signals are distributed on MPDs : 5 MPD for GEM, uRWell and uR Groove, 3 left fo additionnal detectors
- need distribution board from SBS to gather signal on MPDs Ching-Him will look for them, Moller does not use them
- talked with Xinzhan about pixel readout GEM : use APV but different spacing from existing GEM - would be good to make 1 and 2 APVs slot backplane
- Huang will bring a detector - still waiting for GEM - only 1 GEM + Florian's detector
- no update on LV : can ease boxes in EEL , 5V, MPOD can do 6V but need to check current
- sent email to SRS for Hirose to panasonic -
- asked to Dustin McNulty : 2 2xAPVs backplane we can loan - bring next time he is at the lab
- HV : ESB - 2 GEM CAEN crates need board can check with Bill need up to 4 kV, MPOD one board can go to 6 kV - 8 channels - might need break up HV - Alex will try to set up a Lecroy
- VMM : need 12 V supply - might have one in Testlab but not rad hard - check and maybe use for initial testing
- CODA : config for GEM, need to set up optical connection - need to add transceiver and fiber
- checked cable from SBS : cables are still hot
- GEM
- test APVs : 60 good APVs passed low level, need to take pedestal runs
- talk to Florian for how signals are distributed on MPDs : 5 MPD for GEM, uRWell and uR Groove, 3 left fo additionnal detectors
- need distribution board from SBS to gather signal on MPDs Ching-Him will look for them, Moller does not use them
- talked with Xinzhan about pixel readout GEM : use APV but different spacing from existing GEM - would be good to make 1 and 2 APVs slot backplane
- Huang will bring a detector - still waiting for GEM - only 1 GEM + Florian's detector
- no update on LV : can ease boxes in EEL , 5V, MPOD can do 6V but need to check current
- sent email to SRS for Hirose to panasonic -
- asked to Dustin McNulty : 2 2xAPVs backplane we can loan - bring next time he is at the lab
- HV : ESB - 2 GEM CAEN crates need board can check with Bill need up to 4 kV, MPOD one board can go to 6 kV - 8 channels - might need break up HV - Alex will try to set up a Lecroy
- VMM : need 12 V supply - might have one in Testlab but not rad hard - check and maybe use for initial testing
- CODA : config for GEM, need to set up optical connection - need to add transceiver and fiber
- checked cable from SBS : cables are still hot
- Cerenkov
- will try DB9 cable - will try to turn it on at some point
- readout with FADC - need to check if still getting sum of PMTs
- MRPC
- laptop setup for sampling electronics, cannot talk to boxes for now - maybe need firmware update
- other channels readout with TDC, need to figure how to get signal out : NINO board or go to NIM electronics, will need to make adapter
- Timeline installation
- all part to assemble detector support, Eric will put it together on Friday
- need to decide when we go in the Hall - and check with Jerry and tech to make space and have installation
- some cables need to be moved to Hall C -
- bunker locations still need to be defined
- layout HV cables
- check rack space for crates
- start to setup crates in Hall C
- need optical fiber - need to get from Hall A
- need to install new computer in Hall C - counting house
- BNC cables for FADC - basket of cables
- use multiwire cables - ECAL available
- radiation detectors NDX
- check with Hall B if they have 6th board - with socket
**need to work on trigger