January 15th 2026
*GEM
  • pulled extension cables to be surveyed
  • might not have enough HDMI - might need to open basket from SBS - need to count 20 or 30 meters cable
  • need to now cable length need
  • MPD crate booted, still need to check, need LV cables to power APV
  • need hostname for MPD crate and VTP , all on 196 subnet
  • VTP crate CPU booted solidgem2 , need to boot VTP
  • Talked with Harsh, just getting starting with VMM, will let us know when he starts looking at the readout
    *ESB
  • computer working for FADC readout, need to add VTP
  • SoLID HV MPOD crate in HKS area used by Jiwan, will move to SoLID : should have a few channel of PMTs, need to check if can use LV board for VMM
    *ARC detector
  • installed VXS crate with FADC for Zhiwen
  • readout list installed need to test with pulser and detector