January 15th 2026 » History » Revision 3

Revision 2 (Alexandre Camsonne, 01/15/2026 01:07 PM) → Revision 3/4 (Alexandre Camsonne, 01/15/2026 01:07 PM)

h1. January 15th 2026 
 * GEM 
 ** pulled extension cables to be surveyed 
 ** might not have enough HDMI - might need to open basket from SBS - need to count 20 or 30 meters cable 
 ** need to now cable length need 
 ** MPD crate booted, still need to check, need LV cables to power APV 
 ** need hostname for MPD crate and VTP , all on 196 subnet 
 ** VTP crate CPU booted solidgem2 , need to boot VTP 
 ** Talked with Harsh, just getting starting with    VMM, will let us know when he starts looking at the readout 
 * ESB *ESB 
 ** computer working for FADC readout, need to add VTP 
 ** SoLID HV MPOD crate in HKS area used by Jiwan, will move to SoLID : should have a few channel of PMTs, need to check if can use LV board for VMM 
 * ARC *ARC detector 
 ** installed VXS crate with FADC for Zhiwen 
 ** readout list installed need to test with pulser and detector