January 15th 2026
- GEM
- pulled extension cables to be surveyed
- might not have enough HDMI - might need to open basket from SBS - need to count 20 or 30 meters cable
- need to now cable length need
- MPD crate booted, still need to check, need LV cables to power APV
- need hostname for MPD crate and VTP , all on 196 subnet
- VTP crate CPU booted solidgem2 , need to boot VTP
- Talked with Harsh, just getting starting with VMM, will let us know when he starts looking at the readout
- ESB
- computer working for FADC readout, need to add VTP
- SoLID HV MPOD crate in HKS area used by Jiwan, will move to SoLID : should have a few channel of PMTs, need to check if can use LV board for VMM
- ARC detector
- installed VXS crate with FADC for Zhiwen
- readout list installed need to test with pulser and detector
- pulled extension cables to be surveyed
- might not have enough HDMI - might need to open basket from SBS - need to count 20 or 30 meters cable
- need to now cable length need
- MPD crate booted, still need to check, need LV cables to power APV
- need hostname for MPD crate and VTP , all on 196 subnet
- VTP crate CPU booted solidgem2 , need to boot VTP
- Talked with Harsh, just getting starting with VMM, will let us know when he starts looking at the readout
- computer working for FADC readout, need to add VTP
- SoLID HV MPOD crate in HKS area used by Jiwan, will move to SoLID : should have a few channel of PMTs, need to check if can use LV board for VMM
- installed VXS crate with FADC for Zhiwen
- readout list installed need to test with pulser and detector
Updated by Alexandre Camsonne 3 days ago · 3 revisions