Project

General

Profile

Actions

January 8th 2026
  • Updates ESB
    • Network pulled and put switch should have network 196
    • GEM
      • booted MPD crate
      • tried to boot VTP crate, issue with controller
      • Ching can pull out extension cable from SBS, can give extension
      • 2 payload boars for up to 8 MPDs
      • 9 MPDs in crate
      • can setup SBS backplane with one or a few APVs to take pedestals and test software
      • Zhiwen gave github to previous GEM software, need to discuss and figure out what decoders are needed
      • VMM : use ethernet readout and might use long cables as back up for supply
      • need to check for power supply for VMM, need to check if we can use electronics group one or use the MPOD.
      • Harsh getting started with VMM readout
      • 30 m HDMI found if needed : need to check how many - 10 m x 20
    • ECal
      • Zhongling moved boards to crate, just need to hook up network and boot the crate
      • he will move the computer to the test area
        **MRPC
      • moved cables on table near other racks
      • Sanghwa started installing software for NALU chips on laptop
    • HV
      • need to get some up and controls
      • Lecroy
      • MPOD bring crate and set up - start with web interface
      • CAEN crate
      • controls EPICS

  • To do list :
    • network
      • check with network people if we can have dedicated fiber
        **check in Hall : electronics rack location and network connection
  • ECal electronics for Zhihong
    • FADC, SD, TI , VTP, old VME CPU - need to check all working before shipping
    • CAEN controller : will try to run with CODA
  • Test stand detector group
    • will meet detector group at 2 :30 to setup FADC for PMTs LED tests
  • add to new GEM chip paper

Updated by Alexandre Camsonne 4 days ago · 3 revisions