- Updates
- GEM
- relocated crates to small racks for bunker, need floor map to set up cables. One more backplane broken, will try to fix but not clear it will work. Florian has a few spares. Alex will try to get more made
- cables : 10 m HDMI cables labeled, enough for test beam. LV more than 10 m. SHV and BNC cables labeled ( 200 feet )
- Jiwan put MPOD crate on Hall A EPICS, can control it now
- Gas system ready : GEM flushing with N2, Ar/CO2 is ready to go
- Alex will set external trigger for source and cosmics test
- will test VMM next week
- Things to go in Hall C : 2 VXS crates, cables, half rack will be brought later
- HV power
- HV patch panels taken out from Hall A
- need 48 channels - need to check how many MPOD channels we have for PMT
- might need to add a Lecroy for PMTs
- need to check rating for big HV cable
- MRPC
- can be put in support
- flush with N2 if needed
- Cerenkov
- check gas system
- cosmics ?
- Cerenkov RAM ?
- ECal
- 2 modules
- DAQ
- CODA server set up, need to set up the ROCs
- need to add network adapter
- Fibers
- need to pull fibers from counting house to rack
***
- FADC ESB
- need setup VTP readout for FADC
- need setup FADC trigger
- GEM
- relocated crates to small racks for bunker, need floor map to set up cables. One more backplane broken, will try to fix but not clear it will work. Florian has a few spares. Alex will try to get more made
- cables : 10 m HDMI cables labeled, enough for test beam. LV more than 10 m. SHV and BNC cables labeled ( 200 feet )
- Jiwan put MPOD crate on Hall A EPICS, can control it now
- Gas system ready : GEM flushing with N2, Ar/CO2 is ready to go
- Alex will set external trigger for source and cosmics test
- will test VMM next week
- Things to go in Hall C : 2 VXS crates, cables, half rack will be brought later
- HV power
- HV patch panels taken out from Hall A
- need 48 channels - need to check how many MPOD channels we have for PMT
- might need to add a Lecroy for PMTs
- need to check rating for big HV cable
- MRPC
- can be put in support
- flush with N2 if needed
- Cerenkov
- check gas system
- cosmics ?
- Cerenkov RAM ?
- ECal
- 2 modules
- DAQ
- CODA server set up, need to set up the ROCs
- need to add network adapter
- Fibers
- need to pull fibers from counting house to rack ***
- FADC ESB
- need setup VTP readout for FADC
- need setup FADC trigger