March 12th 2026
  • Updates
    • GEM
      • relocated crates to small racks for bunker, need floor map to set up cables. One more backplane broken, will try to fix but not clear it will work. Florian has a few spares. Alex will try to get more made
      • cables : 10 m HDMI cables labeled, enough for test beam. LV more than 10 m. SHV and BNC cables labeled ( 200 feet )
      • Jiwan put MPOD crate on Hall A EPICS, can control it now
      • Gas system ready : GEM flushing with N2, Ar/CO2 is ready to go
      • Alex will set external trigger for source and cosmics test
      • will test VMM next week
      • Things to go in Hall C : 2 VXS crates, cables, half rack will be brought later
    • HV power
      • HV patch panels taken out from Hall A
      • need 48 channels - need to check how many MPOD channels we have for PMT
      • might need to add a Lecroy for PMTs
      • need to check rating for big HV cable
    • MRPC
      • can be put in support
      • flush with N2 if needed
    • Cerenkov
      • check gas system
      • cosmics ?
      • Cerenkov RAM ?
    • ECal
      • 2 modules
    • DAQ
      • CODA server set up, need to set up the ROCs
      • need to add network adapter
    • Fibers
      • need to pull fibers from counting house to rack ***
    • FADC ESB
      • need setup VTP readout for FADC
      • need setup FADC trigger

Updated by Alexandre Camsonne 3 days ago · 2 revisions