Project

General

Profile

Actions

March 19th 2026
  • Updates
    • GEM
      • GEMs fit on support
      • Check with Huang about backplanes
    • DAQ
      • busing installing cables, crate and fiber in the Hall
      • try install crates
      • fiber after walkthrough and tour
    • VTP trigger
      • could download project and license should be able to compile the VTP firmware
    • Analysis software
      • in apptain, github repo by Ching him
        **MRPC
      • need to look at adapter and discriminators

  • Genesis **

Updated by Alexandre Camsonne 4 days ago · 4 revisions