March 21 2024

  • Updates VMM
    • Working on L0 mode - Hall B planning to use
    • Purchase for rad hard component for LHC : lpGBT and VTR+ and bPol 2.5 - for TDIS and SoLID - in queue for 14 months - letter of increase added because cost went up - increase quantity to have the SoLID ones - might be coming soon : lpGBT and bPol (2.5 -> 2.5 to 1.2) and bPol12 might come in a week - could make the radhard mezzanine - could use bPol for PRAD and SBS - can test and measure noise -
    • VTR+ later
    • interface from benchtop supply: design complete - still not ordered - need to be careful of spike at start - could ramp the supply
    • Hall B has untested VMM - wants to make a 4 chips prototype - one engineer will test the VMM - will use one eval board with socket to test chips
    • need to replace the desiccant for VMM
    • SALSA : 50 MHz FADC -
    • MPD - new version -
    • Pixel chamber GEM - different pixel size - ~ 100 k channels
    • check with Paolo, new MPD
    • APV25 220nm process - SAMPA 120 ns - SALSA 65 nm - check if line still exist
  • Status orders
    • FADC ordered
    • VTP ordered
    • TI
    • SD
    • VXS - 24 ordered need 8 more
    • VETROC
  • MRPC electronics
    • NALU ASOC and AARDVARC
    • picoTDC
    • SAMPIC
  • TDIS
    • wirechamber - 1 ns
    • SAMPA close to 2 ns with fitting of pulse at 20 MHz

Updated by Alexandre Camsonne 9 months ago · 4 revisions