May 28th 2026
*Updates
  • GEM
    • tested all APV, mapping to IC2 and APV.
    • wiki page with information for the trackers
    • will take cost
    • we saw signals on all trackers besides one direction for uRGroovw
    • 1 gas system approved, 2 on the way
    • leak not bad at 2 or 3 psi
  • Cal
    • setting up cosmic
    • error run not ending
    • checking scintillators coincidence
    • will try to take data this evening for ECal
    • will check rest of scintillators and cables
  • Survey was done
  • Gas Cherenkov
    • gas system on way
    • will look at Cherenkov signal in hall
    • need extension for control of gas
  • move in Hall next Tuesday
    **DAQ
    • need to get ECal comics goin
    • need to setup Hall C computer and DAQ
    • pi0 and pi+/- KHz level at large trigger