Project

General

Profile

Actions

May 7th 2026

*Updates
  • May 25th going in - 2 weeks
    • 1 UVA 2 Hall B GEM, Cerenkov, Ecal, Sctinillatorrs, 3 Hall B uRWell, uRwell UVA , uRGroove - **
*Run plan
  • what we need to do at beginning
  • what needs to be measured
**GEM
  • need set up cosmics setup
  • Can we test all MPGDs at same time ?
  • test GEM one by one
  • trigger : cosmics trigger
  • add small scintillator for effciency
  • plateau scan ?
  • make stand to take cosmics with most or all of MPGDs - use actual stand and put veritcal maybe
  • all APVs, MPDs , need one slot backplane only for uRGroove and uRWell
  • need config with both ADC and GEM
PMTs
*put 1 scinitillor - can take data, need to figure latency.
  • copied simple decoder but need to adjust windows
**Software
  • start with simple decoder
  • all SBS online installed in container with Penguin and Podd
**Counting house
  • setup CODA on solidpc2
  • basic config with TI in Hall C
  • prepare FADC and GEM

Updated by Alexandre Camsonne 1 day ago · 3 revisions