Actions
November 19th 2020¶
- Updates
- VMM3 : code for readout is done, and simulated for 12 channels. Code can handle up to 4 triggers in the window
5 MHz burst rate capability, need to 1 gigE wrapper from Ben - scale code to 128 channels : might have bottlenecks for 128 channels, group in to 16 groups done in parallel to improve speed
- prototype board design from Arizona: still waiting for design . Connector for power settled : high power connector
- delay in VMM fabrication will try to get other chips for first production
- GBT chip procurement
- VMM3 : code for readout is done, and simulated for 12 channels. Code can handle up to 4 triggers in the window
- APV25
- UMass test stand :
- ASOC : trigger
- Calorimeter : still 2 modules to be fixed - DAQ
- SAMPA : get 50 SAMPA chips for prototype - advise to buy their boards from BNL - plan to get 25 000
Updated by Hanjie Liu about 4 years ago · 2 revisions